Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 25, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Lake Forest Zone 4 El Toro Tank 1 and 2 Rehabilitation

Closed
12568State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 332420
New
SLED
2026 Fuel Tanks
Solicitation # 2026-31
The Washington County Board of Commissioners in Georgia is soliciting bids for a complete, code-compliant bulk fuel storage and dispensing system for an on-site facility. The project requires the supply and delivery of two 10,000-gallon UL-2085 fire-rated, double-wall aboveground storage tanks, one for gasoline and one for ultra-low-sulfur diesel. The scope of work includes all necessary piping, fittings, valves, emergency shutoffs, and a keyed fuel control and tracking system featuring software and reporting capabilities. All equipment must be new, include manufacturer certifications, and comply with NFPA 30/30A, EPA 40 CFR Part 112 (SPCC), and local fire codes, with meters being NTEP certified for commercial use. Bids must be submitted in writing by December 14, 2026, and will be evaluated primarily on total evaluated price, with high importance placed on delivery lead time and medium importance on warranty, service, and vendor experience. Contractors must provide a minimum 60-day quote validity period and evidence of three recent comparable installations. Required documentation includes an E-Verify Affidavit, a SAVE Affidavit, and a Certificate of Insurance listing the Washington County BOC as an additional insured, with minimum liability limits of $1,000,000 per occurrence. The contract allows the County to terminate the agreement with 10 days' written notice and requires the contractor to repair or replace defective workmanship for one year following final completion.
Washington County Board of Commissioners

POSTED

4 days ago

DEADLINE

in 27 days
NAICS: 332420
New
Federal
Storage Tank AND SUPPLIES - FORT BRAGG
Solicitation # W911S227U0178
Solicitation W911S227U0178 is a Request for Quotation for the procurement of new commercial equipment and supplies to support Fort Bragg. This acquisition is a Total Small Business Set-Aside and requires the delivery of a 6000 gallon Norwesco white vertical storage tank, along with associated hardware including a Hayward bulkhead tank fitting, Kuriyama acid/chemical and DEF UHMWPE tubing, AMT pumps, and various stainless steel pipe nipples and fittings. The government will award the contract to the responsible offeror whose proposal is most advantageous based on price and technical evaluations. Only new equipment is acceptable, and used or remanufactured products will be rejected. Offers must be submitted exclusively through the PIEE Solicitation module and must include technical and price proposals, as well as a completed certification of the country of origin. While the solicitation is brand name or equal, any proposed equal products must meet all specified salient physical, functional, or performance characteristics and be supported by descriptive literature. Delivery is required on an F.O.B. destination basis, with a preferred delivery timeline of within 30 days. Compliance with various federal regulations is mandatory, including Buy American standards, sustainable product requirements, and specific cybersecurity and telecommunications prohibitions.
W6QM Micc-Ft Drum

POSTED

4 days ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The contract involves a comprehensive rehabilitation project for two domestic water tanks in Lake Forest Zone 4, managed by the Irvine Ranch Water District in California. The scope includes removing existing interior coatings, repairing, and recoating both interior and exterior surfaces of the tanks. It also entails replacing critical piping components such as the tank inlet, outlet, overflow, and drain pipes, along with storm drain piping and catch basins. Additionally, the project requires the replacement and relocation of the flow meter and its vault, as well as site work involving paving and site restoration. Key upgrades include replacing tank level instrumentation devices, inlet and outlet valves, access manways, interior ladders, and the cathodic protection system to ensure the tanks' longevity and operational efficiency. The project solicitation was posted on September 25, 2025, with a response deadline of November 11, 2025. The contract size is estimated to range between 1.5 million and 3 million dollars. The Irvine Ranch Water District serves as the contracting agency, and interested vendors can contact Nang Mwe via email or phone for further details. The project emphasizes infrastructure upgrades to maintain water storage integrity and improve operational safety and reliability.

General Info

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Forging Tooling ProductionOpen now, due in 8 days
  • 2026 Fuel TanksOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Irvine Ranch Water District
Contacts1 person available
OfficeN/A

Full Description

Show more
The project involves removal of existing interior coating, repairing and recoating for interior and exterior coating of the two domestic water tanks, replacement of tank inlet, outlet, overflow and drain piping, replacement of storm drain piping and catch basins, replacement and relocation of the flow meter and flow meter vault, and site regarding and repaving. The project will also replace the tank level instrumentation devices, inlet/outlet valves, access manways, interior ladders, and cathodic protection system.

More opportunities from California → Irvine Ranch Water District

Same awarding agency

NAICS: 237990
SLED
Syphon Reservoir Improvement Project
Solicitation # 2019080009
The Syphon Reservoir Improvement Project, managed by the Irvine Ranch Water District in Orange County, California, involves replacing an existing 59-foot engineered dam with a new 138-foot dam. This upgrade will increase the recycled water storage capacity from 500 to 5,000 acre-feet, with the dam crest elevation rising to 468 feet above mean sea level. Key infrastructure components include a new spillway to prevent overtopping, a seepage control drainage system, a circulation and aeration system, and the demolition and expansion of strainer and disinfection facilities for filtration, chlorination, and de-chlorination. The project also includes the construction of new onsite access and maintenance roads. All construction must meet or exceed the safety and design requirements of the California Department of Water Resources, Division of Safety of Dams. Environmental compliance is a critical component of the project, as it requires adherence to the NPDES General Permit for stormwater runoff and the implementation of a Stormwater Pollution Prevention Plan. Additionally, the project is subject to an Incidental Take Permit from the California Department of Fish and Wildlife due to the permanent removal of 64.21 acres and temporary impact on 26.76 acres of Crotch's bumble bee habitat. Mitigation measures, including worker education and habitat preservation, have been established to ensure impacts to this candidate species remain below significance.
Other Heavy and Civil Engineering Construction

POSTED

11 months ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS