Lakeridge Slope Stabilization

Closed
PW#2024-053State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The project involves stabilizing approximately 210 feet of sloped terrain along the Taylor Creek trail in Lakeridge Park, southeast Seattle, through the construction of micropiles and a concrete grade beam. Additionally, the work includes making both temporary and permanent improvements to the existing boardwalk and small bridges to facilitate construction access, restoring disturbed soil areas (with vegetation restoration to be completed by others), and constructing a temporary sewer bypass. The project also entails extending two existing stormwater culverts by 10 feet to improve drainage. The total estimated cost for the project is $1,800,000, excluding sales tax. The work site begins at the trail entrance at 68th Ave S & Holyoke Way S and extends approximately 2,000 feet south along the trail. The solicitation for this project was posted on July 23, 2025, with a response deadline of August 13, 2025. The project is managed by the Washington Public Works agency, and interested contractors can contact Ryan Brady via email or phone for further details.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Public Works
Contacts1 person available
OfficeN/A
Organization / AgencyWashington → Public Works
Office AddressN/A

Full Description

Show more
Project Description:  This Project consists of the following elements of Work: Stabilize approximately 210 feet of sloped areas along the Taylor Creek trail by constructing micropiles and a concrete grade beam, make temporary and permanent improvements to the boardwalk and small bridges along the trail needed for construction equipment access, soil restoration in disturbed areas (vegetation restoration to be done by others), construct a temporary sewer bypass, and construct a 10-foot extension of two existing stormwater culverts.Engineer's Estimate: $1,800,000 (without sales tax)Project Location:  This Project is located in southeast Seattle in Lakeridge Park starting at the Taylor Creek trail entrance at 68th Ave S & Holyoke Way S (north end of project site) and continuing south approximately 2,000 feet along the trail

More opportunities from Washington → Public Works

Same awarding agency

NAICS: 541330
New
SLED
2026 AC Water Main Replacement
Solicitation # 2026-RFQ-042
Solicitation 2026-RFQ-042 is a request for qualifications from the City of Mercer Island Public Works department for professional engineering services to design water system upgrades. The project focuses on replacing approximately 5,000 linear feet of aging asbestos cement water mains with ductile iron mains along SE 40th St and E Mercer Way. The scope is divided into two phases: Phase 1 involves water system and PRV vault replacement on SE 40th St from Greenbrier Ln to 97th Ave SE, and Phase 2 extends the replacement to 97th Ave SE and the 3700 and 3800 blocks of East Mercer Way. Additional components for replacement include fire hydrants and water services. The design must comply with the Reduction of Lead in Drinking Water Act and the City of Mercer Island Standard Details Water. The project follows a goal-based timeline with bid-ready plans for Phase 1 due by Q2 2027 and Phase 2 by Q3 2027, with overall construction completion targeted for Q2 2028. Qualified firms must be licensed in the State of Washington and submit a Statement of Qualifications limited to 12 pages, including a proposed timeline and three references from the last five years. Selection is at the sole discretion of the City, and the awarded firm will negotiate a scope and fee schedule using the City's standard professional services agreement. Administration is managed by the City Manager, with payments issued via City warrant within 45 days of receiving a proper monthly invoice.
Engineering Services

POSTED

3 days ago

DEADLINE

in 11 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS