Lancaster Eastside Annexation

Forecast
2025071152State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Lancaster Eastside Annexation project, managed by the City of Lancaster, California, involves the annexation of approximately 638 acres from unincorporated Los Angeles County into the city's jurisdiction under Annexation No. 24-001 and Pre-Zone No. 25-001. The project area is pre-zoned as RR-2.5 (Rural Residential), allowing for one dwelling unit per 2.5 acres. A primary component of the project is the development of an 80-megawatt solar photovoltaic facility covering approximately 288 acres in the northern half of the annexed area, which will require a separate Conditional Use Permit. The project has undergone extensive environmental review in compliance with the California Environmental Quality Act (CEQA), resulting in a Mitigated Negative Declaration certified on October 14, 2025. Comprehensive technical assessments were conducted, including a Phase I Environmental Site Assessment following ASTM 1527-13 standards, a Vehicle Miles Traveled (VMT) assessment, and reports on air quality, biological resources, and cultural and paleontological impacts. The process included tribal consultations per Assembly Bill 52 and Senate Bill 18, as well as coordination with the California Department of Fish and Wildlife and the Department of Conservation regarding prime farmland conversion. Construction is slated to begin in 2026, with specific requirements for equipment inspection stations at all access points to prevent the off-site movement of excess soil.

General Info

City of Lancaster annexes 638 acres for rural residential use and 80MW solar facility.

Place of Performance

Avenue I, Avenue J, 50th Street East, 60th Street East, Lancaster, CA, 93535

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

Notice details unchanged. Attachments may have changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Lancaster
Contacts1 person available
OfficeN/A

Full Description

Show more
The project includes Annexation No. 24-001 and Pre-Zone No. 25-001, and consists of two components: 1) annexation of an approximately 638-acre area into the City's jurisdiction, and 2) development of an approximately 288-acre solar facility in the northern half of the annexation area. Under the proposed RR-2.5 zone, commercial solar electrical generation facilities are conditionally permitted. Thus, the solar facility would require a subsequent Conditional Use Permit (CUP) separate from the proposed project.

Similar Contracts

Same NAICS industry code

More opportunities from California → City of Lancaster

Same awarding agency

NAICS: 541350
SLED
Site Plan Review No. 25-007 (Lancaster Travel Center)
Solicitation # 25-007
Site Plan Review No. 25-007 involves the construction and operation of the Lancaster Travel Center in Los Angeles County, California, located at the intersection of Avenue H and 25th Street West. The project consists of a 9,240 to 11,000 square foot travel center, three quick-service drive-through restaurants totaling approximately 6,800 square feet, and a freeway-oriented pylon sign up to 70 feet in height. Fueling facilities will include diesel pumps for up to five trucks and eight pumps for passenger vehicles, alongside overnight truck parking and EV charging stations. The development occupies approximately 10.65 acres and includes the installation of water, wastewater, and stormwater conveyance systems, as well as energy and telecommunications infrastructure. The project has undergone extensive environmental review through a Draft Initial Study and Mitigated Negative Declaration, which included assessments of air quality, noise impacts, biological resources, and cultural resources. Technical reports indicate no significant recognized environmental conditions or impacts on sensitive species, though mitigation measures for alkali mariposa lily habitat and stormwater management via an underground detention system are planned. The project schedule is set to begin grading on January 16, 2027, with building construction continuing through November 5, 2028, and final paving and architectural coating concluding by December 31, 2028. The City of Lancaster serves as the lead agency, with a public comment period for the environmental study running from July 9 to August 8, 2026.
Building Inspection Services

POSTED

about 2 months ago

DEADLINE

N/A
View Details
NAICS: 237210
SLED
Tentative Tract Map 61600 / Variance 22-02
Solicitation # 1927-ITP-2025-048-05
The City of Lancaster and United Civil, Inc. are executing a project to develop approximately 10 acres of undeveloped land into 32 single-family residential lots under Tentative Tract Map 61600 and Variance 22-02. Project activities include vegetation removal, grubbing, grading, the installation of underground storage tanks, underground utility construction, and building construction. To facilitate this development, the California Department of Fish and Wildlife issued Incidental Take Permit No. 1927-ITP-2025-048-05, which authorizes the incidental take of 34 western Joshua trees, consisting of 30 removals and 4 encroachments. The permit is effective as of December 18, 2025, and expires on December 31, 2030. Compliance requirements include the appointment of a Designated Representative to oversee on-site monitoring and the submission of a Project Completion Report within one month of project conclusion. The permittee has paid 14,861 dollars into the Western Joshua Tree Conservation Fund as mitigation fees. Strict environmental controls are mandated, including the use of perimeter fencing at least 6 inches above grade to allow wildlife passage, the prohibition of rodent barrier fencing, and the prevention of hazardous material contamination within 50 feet of preserved trees. The permittee must notify the California Department of Fish and Wildlife seven days prior to starting activities and provide immediate notification of any unauthorized tree damage or death.
Land Subdivision

POSTED

11 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS