Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on October 2, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Landfill Base Liner System Design

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Western Placerville Interchanges Phase 2.3 - Design & Env RFP Final Complete
Solicitation # 20261113026
The City of Placerville is soliciting proposals from qualified engineering firms for the Western Placerville Interchanges Phase 2.3 Project, specifically focusing on the US 50 Westbound Off-Ramp at Ray Lawyer Drive. The scope of work encompasses the full project lifecycle, from Project Approval and Environmental Document (PA&ED) through Plans, Specifications, and Estimate (PS&E), Right-of-Way Certification, bid support, and design support during construction. Key objectives include constructing a new westbound off-ramp, improving the intersection at Ray Lawyer Drive, and enhancing bicycle and pedestrian facilities. The project is located on the State Highway System, funded by State Transportation Improvement Program (STIP) funds, and will be delivered by the City under Caltrans oversight. The selected consultant must adhere to rigorous Caltrans and City of Placerville standards, including CEQA and NEPA environmental revalidation and the Caltrans Workplan Standards Guide WBS. Payment will be structured as actual cost plus a fixed fee, with progress payments made monthly. To avoid organizational conflicts of interest, the selected firm and its subconsultants are prohibited from providing construction management services. Proposals must be submitted by December 7, 2026, consisting of a technical proposal and a separate sealed cost proposal. Award decisions will be based on a 50/50 weighted split between the written proposal score and an interview score for short-listed firms.
City of Placerville

POSTED

about 3 hours ago

DEADLINE

in 20 days
NAICS: 541330
New
SLED
RFP27-016 Countywide Bicycle & Pedestrian Master Trails Plan
Solicitation # RFP27-016
The Board of Commissioners of Glynn County, Georgia, is soliciting proposals for a Countywide Bicycle and Pedestrian Master Trails Plan covering the Brunswick Area Transportation Study Metropolitan Planning Area, including St. Simons Island and unincorporated Glynn County. The project involves professional planning, analysis, and public engagement to identify network gaps and develop concept-level recommendations for 10 to 20 priority projects. Key deliverables include a scored ranked segment database, a prioritized network gap inventory, a Priority Projects Technical Memorandum with planning-level cost estimates, and a Policy Audit Matrix. All work must comply with FHWA regulations, 2 CFR Part 200, and environmental standards including the Clean Air Act and Clean Water Act. Proposals are evaluated based on practical merit and price, with a technical ranking performed before fee negotiations. The highest-ranked proposer will negotiate the final scope and fee, which is compared against the County's independent cost estimate. Applicants must provide GDOT prequalification documentation, a SAM.gov unique entity ID, and certifications regarding EEO practices and anti-lobbying. Technical requirements include strict GIS data standards using NAD 1983 State Plane Georgia East and the delivery of Esri file geodatabase feature classes. Proposals must be submitted via the County's eProcurement Portal by December 17, 2026.
Glynn County Board of Commissioners

POSTED

about 4 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

Yolo County in California is seeking a subcontractor for the engineering design of landfill base liner systems. The scope of work focuses on the technical selection of materials and ensuring that all designs comply with strict regulatory standards and hydraulic conductivity requirements to prevent environmental contamination. The solicitation was posted on October 2, 2025, with a response deadline of November 7, 2025. This project falls under NAICS code 541330, specifically targeting professional engineering services to support the county's infrastructure and environmental safety goals.

General Info

Yolo County seeks an engineering subcontractor for landfill base liner system design services.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of RFQ-2025-0012.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Engineering Design and Construction Quality Assurance Services at the Yolo County Central Landfill

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • DBE Subconsultant Opportunity - Qualifications for E Wells PFAS Groundwater Treatment ImprovementsOpen now, due in 15 days
  • Civil Design & PS&E DevelopmentOpen now, due in 21 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Yolo County
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → Yolo County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Engineering design of landfill base liner systems, including material selection and compliance with hydraulic conductivity and regulatory standards.

More opportunities from California → Yolo County

Same awarding agency

NAICS: 237990
SLED
Clark Pacific Facility Expansion Project
Solicitation # 2025031376
The Clark Pacific Facility Expansion Project, managed by the Yolo County Department of Community Services, involves the development of up to 500,000 square feet of new industrial buildings on a 76.76-acre site at 40307 Best Ranch Road in unincorporated Yolo County, California. The project scope includes site preparation, grading, trenching for utilities, paving, and the construction of facilities for the prefabrication of building materials and ancillary outdoor storage. To facilitate this expansion, the project requires a General Plan Amendment to redesignate the land use from Agriculture to Industrial and a rezone to Heavy Industrial. Site access will be provided via new driveways from Clark Junction, a private road owned and maintained by Clark Pacific. The project has undergone a comprehensive environmental review process in compliance with the California Environmental Quality Act, resulting in a Final Environmental Impact Report and a Notice of Determination filed on July 24, 2026. Key regulatory requirements include the submission of a Construction Traffic Control Plan to the County Public Works Division and the provision of FEMA Letters of Map Revision to the Chief Building Official prior to the acceptance of grading permits. Strict safety and operational mandates are in place regarding PG&E facility protections, including specific clearance requirements for towers and poles, the prohibition of hazardous materials or septic systems within easements, and adherence to California Division of Industrial Safety and CPUC General Order 95 standards. All excavation must follow 811 protocols before commencing.
Other Heavy and Civil Engineering Construction

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
Addendum #2 to the Yolo County Central Landfill Permit Revisions EIR
Solicitation # 2020080465
Yolo County is implementing a series of updates to the Yolo County Central Landfill Permit Revisions Environmental Impact Report, specifically through Addendums 2 and 3. These modifications focus on expanding the operational capabilities and infrastructure of the facility. Key updates include the clarification of ancillary operational hours for Compost Facility 2, extending before-hours activities from 4:00 a.m. to 6:30 a.m. and after-hours activities until 9:00 p.m. Additionally, the project scope has been expanded to include a Landfill Gas Beneficial Use Project, which involves upgrading landfill gas collection and establishing a new processing facility to produce renewable natural gas and generate electricity to reduce emissions and improve energy efficiency. The project is managed by the Yolo County Department of Community Services, with Stephanie Cormier serving as the primary point of contact. All modifications have been conducted in compliance with the California Environmental Quality Act, with findings indicating that the changes do not result in new significant environmental effects or require additional mitigation measures beyond those established in the original 2021 EIR. The project is identified by solicitation number 2020080465 and is being executed in accordance with CEQA Guidelines and the Public Resources Code.
Environmental Consulting Services

POSTED

6 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
CEMEX Mining and Reclamation Plan Permit Amendment (ZF #2018-0015)
Solicitation # ZF #2018-0015
CEMEX seeks to amend its existing mining permit and reclamation plan for its off-channel operations in Yolo County, California, to extend the permit term by 20 years through 2047 and expand operational capacity. The amendment increases the total allowable tonnage, expands the area of simultaneous disturbance and processing activities, and adjusts phase boundaries while removing Phase 7 entirely. Reclamation timing is deferred for certain phases, and the plan shifts the balance of reclaimed land uses by reducing agricultural recovery and increasing the area designated for lake formation, while also expanding habitat restoration. The proposal includes corrections to inconsistencies between approved plans and actual on-the-ground conditions, ensuring alignment with current operations. The permitting process is governed by Yolo County’s Mining Ordinance and the California Environmental Quality Act, with oversight from the County’s Department of Community Services. The site, located at 30288 State Route 16 in Woodland, has been in operation since the 1970s, and the amendment requires compliance with strict reclamation standards including soil horizon restoration, groundwater protection, dust control, and long-term monitoring to meet SMARA requirements. No federal procurement elements are present—the process is a local land-use regulatory approval, not a contracted procurement—so there are no contract clauses, pricing details, delivery terms, or federal acquisition regulations applied. Performance obligations center on environmental mitigation, cultural resource protection, and adherence to approved reclamation benchmarks, with formal acceptance granted by Yolo County Planning Division upon verification of compliance. Technical attachments support the amendment with revised figures on reclaimed uses, evaporation estimates, habitat maps, and correspondence, all tied to CEQA-mandated environmental review rather than federal contracting procedures.
Environmental Consulting Services

POSTED

11 months ago

DEADLINE

N/A
View Details
NAICS: 925110
SLED
Yolo County Cannabis Land Use Ordinance
Solicitation # ZF2023-041
Yolo County has issued a Cannabis Use Permit authorizing the cultivation of cannabis on up to two acres of canopy under the provisions of the Yolo County Cannabis Land Use Ordinance (CLUO), which was established consistent with the certified Program Environmental Impact Report (SCH#2018082055) approved on September 14, 2021. The project qualifies for streamlined environmental review under CEQA Guidelines Sections 15168, 15162, and 15183, as it is deemed a later activity fully encompassed by the existing CLUO EIR, meaning no additional environmental documentation or mitigation planning is required beyond the standards already incorporated into the ordinance. Approval is contingent upon adherence to specified regulatory conditions including a minimum 530-foot buffer from residential properties, compliance with zoning and facility density limits, and submission of revised site plans if modifications are made. The permit is not a federal procurement contract and contains no FAR clauses, federal acquisition elements, or contract types such as FFP or IDIQ. Instead, it functions as a local land use authorization administered under California environmental law and county regulations. The applicant, Jack Brown, is required to submit documentation including a Notice of Exemption, a California Department of Fish and Wildlife No Effect Determination, and proof of prior fee payment, all of which must be physically attached to the application. Fees related to environmental review processing—such as $50, $3,495.25, and $4,123.50—are collected through internal county cash receipt form DFW 753.5a and deposited into account #137 under the Community Services department, with payments processed via check, cash, or electronic transfer to the county’s designated remit-to address in Woodland, California. The place of performance is Woodland, CA, with administrative oversight handled by the Yolo County Department of Community Services, the Office of Planning and Research, and the County Clerk’s Office. No federal contracting roles such as PCO, COR, or COTR are designated, and no UEI, CAGE, or small business certifications are required or submitted. The permit’s acceptance is formalized through County Board of Supervisors approval and filing of a Notice of Determination, with compliance monitored through regulatory enforcement rather than traditional contract inspection or performance evaluation criteria.
Administration of Housing Programs

POSTED

12 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS