Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on September 16, 2014. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Large Shaft Refurbishment

Awarded
HSCG40-14-R-30004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
SLED
F&W, 2018 Munson Packman Boat Repower project
Solicitation # 2018 Munson Packman Boat Repower
The Confederated Tribes of the Colville Reservation Fish and Wildlife Department is seeking a factory-certified marine contractor to perform a complete propulsion repower and helm system integration on a 30 foot Munson Packman landing craft. The project involves a six-phase process including the decommissioning and removal of two existing Honda BF250A outboard engines, a structural assessment of the transom, and the installation of two new Honda BF250D Drive-by-Wire outboards. Key technical requirements include the installation of Honda iST electronic control heads at primary and secondary helm stations, integration with the existing NMEA 2000 backbone and SeaStar PA1315-2 Power Assist Steering system, and a full fuel system upgrade using USCG Type A1-15 lines. The project concludes with static diagnostics and a minimum two hour sea trial to validate performance and safety protocols. The selected contractor must be a Honda Marine Authorized Dealer or Service Center and provide a secure facility for vessel storage. Proposals are due by November 13, 2026, and will be evaluated based on a 100 point scale with significant preference given to Colville and other Indian Business Enterprises. Award criteria prioritize reliability and effectiveness over the lowest cost. Contractual requirements include a performance bond for awards exceeding 100,000 dollars or a 25 percent retainage, comprehensive liability and workers compensation insurance, and consent to the jurisdiction of the Colville Tribal Court. Payments are subject to the tribal appropriation process and the availability of funds in the tribal treasury.
Confederated Tribes of the Colville Reservation

POSTED

about 8 hours ago

DEADLINE

in 9 days
NAICS: 336611
New
Federal
Maintenance, Repair, and Preservation of Edgecumbe Barge
Solicitation # N4523A26Q1006
The Puget Sound Naval Shipyard and Intermediate Maintenance Facility intends to award a stand-alone Firm-Fixed-Price contract for the maintenance, repair, and preservation of one Edgecumbe RCD Barge. The scope of work includes docking and undocking the vessel, performing hull and structural repairs, replacing zinc anodes, and conducting tank and void cleaning and air tests to support ABS and USCG inspections. The contractor is responsible for transporting the vessel from the government facility in Bremerton, Washington, to their own facility and returning it upon completion. To ensure proper oversight, the contractor's facility must be located within the Puget Sound region, defined as the West Coast of the continental US from Olympia to Bellingham, Washington. The period of performance is scheduled from 15 December 2026 to 19 February 2027, with a quote submission deadline of 13 November 2026. Technical requirements mandate that all welders be certified by the American Weld Society and American Bureau of Shipping, and the contractor must maintain a documented Heavy Weather Plan. Quality standards require adherence to commercial marine practices, including specific surface preparation and coating standards such as SSPC-SP-1. Offerors must be registered in the System for Award Management and provide a detailed cost proposal that includes a five-way breakdown of waste management and disposal costs.
Puget Sound Naval Shipyard IMF

POSTED

about 14 hours ago

DEADLINE

in 9 days
NAICS: 336611
New
Federal
TSV4 NARR MESSING AND MODERNIZATION
Solicitation # N0018927QL008
Solicitation N0018927QL008 is a firm-fixed-price effort issued by NAVSUP FLT LOG CTR Norfolk for the development of a drawing package and Bill of Materials (BOM) to support habitability upgrades aboard the TSV4 Narragansett. The scope of work focuses on the assessment and documentation of messing, berthing, stateroom, and sanitary spaces at Joint Expeditionary Base Little Creek-Fort Story, Virginia. This is a professional services contract limited to engineering and planning; it specifically excludes the procurement, fabrication, or installation of any shipboard components. The project is 100 percent set aside for Small Business and Service-Disabled Veteran-Owned Small Businesses under NAICS code 336611. Key deliverables include an electronic draft drawing package and BOM due 40 calendar days after award, with final electronic files and two full-size paper copies due within 61 calendar days. The contractor must adhere to several technical standards, including MIL-STD-2003 for electrical installations, MIL-STD-777 for piping components, and NAVSEA General Specifications for Overhaul of Surface Ships. Award is based on best value, requiring a pass on a mandatory ship check at Colonna's Shipyard in Norfolk, VA, and an acceptable technical approach. Failure to attend the mandatory site visit results in disqualification. Payment will be processed electronically via the Wide Area WorkFlow system.
Navsup Flt Logistics Ctr Norfolk

POSTED

about 14 hours ago

DEADLINE

in 8 days
NAICS: 336611
New
Federal
Multi Mission Surface Combatant (MMSC) Post Delivery Execution Yard (PDEY)
Solicitation # N6117727R0003
Solicitation N61177-27-R-0003 is for the Multi Mission Surface Combatant (MMSC) Post Delivery Execution Yard (PDEY) contract, managed by Navsea HQ. The objective is to execute post-delivery availabilities for four MMSC ships, with each vessel undergoing a 14-month post-delivery period. The scope of work includes the management and execution of three primary availabilities per ship: the Post Shakedown Availability (PSA), the Industrial Post Delivery Availability (IPDA), and the Continuous Maintenance Availability (CMAV), as well as any concurrent Planned Maintenance Availabilities (PMAVs). Key contractor responsibilities include providing a NAVSEA-certified drydock for PSAs, performing emergent work, and conducting Post Repair Trials (PRT) to ensure system operability. The contract is structured using Cost Plus Award Fee (CPAF) task orders, with a total performance period not to exceed five years. Work for PSAs and IPDAs will be performed at the contractor's facilities, while CMAVs will be executed at Naval Station Mayport. Award evaluation is based on non-cost factors including management capability, facility and production capabilities, and the proposed approach for PSA, IPDA, and CMAV execution. Performance will be measured against weighted objectives for schedule (35%), management (30%), technical (20%), and cost (30%) performance. The solicitation requires strict adherence to quality standards such as ISO 9001:2015 and specific military marking and packaging standards including MIL-STD-130 and MIL-STD-129.
Navsea Hq

POSTED

about 14 hours ago

DEADLINE

in 2 months
NAICS: 336611
New
Federal
CGC KUKUI DRYDOCK
Solicitation # 70ZU0227QIBCT0001
Solicitation 70ZU0227QIBCT0001 is an Indefinite Delivery Requirement Contract (IDR) for the FY27 drydock availability of the USCGC KUKUI (WLB 203), a 225-foot Buoy Tender homeported in Sitka, Alaska. The project involves comprehensive drydock repairs, including extensive preservation of the hull, exterior decks, superstructure, ballast and potable water tanks, and various internal mechanical components. Performance will take place at the contractor's facility from February 2, 2027, to May 18, 2027, with an anticipated award date of January 18, 2027. This requirement is a total small business set-aside under NAICS code 336611, with a size standard of 1,300 employees. The award will be granted to the responsible quoter providing the most advantageous quote, based on a lowest-price technically acceptable basis. Evaluation factors include a pass/fail assessment of technical capability and past performance within the last three years. Contractors must provide a comprehensive execution plan for lodging and messing, facility certifications, and docking calculations in accordance with SFLC Standard Specifications 0740 and 8634. Quotes must be submitted via email by November 23, 2026, and must include a detailed technical proposal separate from the pricing sheet. Order limitations are set with a minimum order of 1,000 dollars and a maximum combination order of 7 million dollars.
CG-SEA-C22

POSTED

about 14 hours ago

DEADLINE

in 19 days

General Info

Contract Value

$0

NAICS

336611 - Ship Building and Repairing

Place of Performance

MD

Set-Aside

SBA

Award Issued Date

Documents

10
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
XLSX, High priority: read this first63 pages · clin-list
High
XLSX, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, Low priority3 pages · nda
Low
DOCX, Low priority54 pages · special-notice
Low
DOCX, Low priority54 pages · special-notice
Low
DOCX, Low priority54 pages · special-notice
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Sflc Procurement Branch 3(00040)
Contacts1 person available
OfficeBALTIMORE, MD, 21226, USA
Office AddressBALTIMORE, MD, 21226, USA

Full Description

Show more
The purpose of Amendment 0002 to solicitation HSCG40-14-R-30004 is to; 1) Extend the closing date of the solicitation; 2)modify Part IV, Representations and Instructions under Evaluations Factors for Award; 3) Revise SLIN XXXXAA verbiage within CLIN listing (Attachment 3); 4) Provide responses to Bidders Questions as follows: 1) The solicitation due date is being extended from 9/19/14 at 4:00pm EST to 9/24/14 at 4:00pm EST. This is updated in Part I, The Schedule under SF 1449, Solicitation/contract form, and Part IV, Representations and Instructions under Instructions, conditions, and notice to bidders. 2) In Part IV, Representations and Instructions under Evaluations Factors For Award: Price Evaluation concerning paragraph titled, "SLIN XXXXAB (Material Cost Column of tab Evaluation Entry in Attachment 3)," the following changes were made: From: This SLIN represents material costs particular to the type of material used on the respective shaft being repaired. Bidders are to propose Firm-Fixed Prices on tab "Material List," Attachment 3. The measure of the unit will be identified and require a Firm Fixed Price to be proposed for the base year and to each option year. For evaluation purposes only, the Coast Guard will apply an estimated quantity to each material item to be multiplied by the proposed material price for each SLIN to arrive at an evaluated total cost. For evaluation purposes only, the US Coast Guard will then apply the IGE usage factor to each SLIN XXXXAB (as indicated in tab "Evaluation Entry," Attachment 3). The Coast Guard will calculate the sum of all SLIN XXXXAB for the base year through option year 4 to evaluate the total material price. The Firm-Fixed Prices proposed for the Base year shall be set forth in the contract once awarded. To: This SLIN represents material costs particular to the type of material used on the respective shaft being repaired. Bidders are to propose Firm-Fixed Prices on tab "Material List," Attachment 3. The measure of the unit will be identified and require a Firm Fixed Price to be proposed for the base year and to each option year. For evaluation purposes only, the Coast Guard will apply an estimated quantity to each material item to be multiplied by the proposed material price for each SLIN to arrive at an evaluated total cost. For evaluation purposes only, the US Coast Guard will then apply the IGE usage factor to each SLIN XXXXAB (as indicated in tab "Evaluation Entry," Attachment 3). The Coast Guard will calculate the sum of all SLIN XXXXAB for the base year through option year 4 to evaluate the total material price. The Firm-Fixed Prices proposed shall be set forth in the contract once awarded for the base year and each option year. 3) All SLINs XXXXAA Base year through Option year 4 will be revised as follows: SLIN XXX5AA through SLIN XX14AA From: "For approval, Provide Pre-repair Inspection Report for ****SHAFT**** IAW Section 3.5 of Specification R-243-0459." To: "For approval, Provide Pre-repair Inspection Report for ****SHAFT**** IAW Sections 3.4 through 3.7.2 of Specification R-243-0459." SLIN XX15AA through SLIN XX23AA From: "For approval, Provide Pre-repair Inspection Report ****SHAFT****, condition IAW Section 3.5 of Specification R-243-04593, for final machining into ****SHAFT****." To: "For approval, Provide Pre-repair Inspection Report ****SHAFT****, condition IAW Sections 3.4 through 3.7.2 of Specification R-243-04593, for final machining into ****SHAFT****." Bidders Questions and Responses: 1. Question: Should the price per pound of welding wire include the other material components of this operation? These components include but are not limited to flux, shielding gasses, insulation, thermal wells, etc. Answer: Yes, the price per pound shall include the other material components of this operation. 2. Question: Due to the volatility of welding material prices can the material fixed prices be negotiated at the renewal of the option years? Answer: No. The solicitation originally stated, "The Firm-Fixed Prices proposed for the Base year shall be set forth in the contract once awarded," and was an oversight. This will be addressed in amendment 2 of the solicitation as follows: FROM: This SLIN represents material costs particular to the type of material used on the respective shaft being repaired. Bidders are to propose Firm-Fixed Prices on tab "Material List," Attachment 3. The measure of the unit will be identified and require a Firm Fixed Price to be proposed for the base year and to each option year. For evaluation purposes only, the Coast Guard will apply an estimated quantity to each material item to be multiplied by the proposed material price for each SLIN to arrive at an evaluated total cost. For evaluation purposes only, the US Coast Guard will then apply the IGE usage factor to each SLIN XXXXAB (as indicated in tab "Evaluation Entry," Attachment 3). The Coast Guard will calculate the sum of all SLIN XXXXAB for the base year through option year 4 to evaluate the total material price. The Firm-Fixed Prices proposed for the Base year shall be set forth in the contract once awarded. TO: This SLIN represents material costs particular to the type of material used on the respective shaft being repaired. Bidders are to propose Firm-Fixed Prices on tab "Material List," Attachment 3. The measure of the unit will be identified and require a Firm Fixed Price to be proposed for the base year and to each option year. For evaluation purposes only, the Coast Guard will apply an estimated quantity to each material item to be multiplied by the proposed material price for each SLIN to arrive at an evaluated total cost. For evaluation purposes only, the US Coast Guard will then apply the IGE usage factor to each SLIN XXXXAB (as indicated in tab "Evaluation Entry," Attachment 3). The Coast Guard will calculate the sum of all SLIN XXXXAB for the base year through option year 4 to evaluate the total material price. The Firm-Fixed Prices proposed shall be set forth in the contract once awarded for the base year and each option year. 3. Question: SLIN AA requires a firm fixed price to accomplish paragraph 3.5 of the specification. Should this requirement be expanded to include paragraphs 3.4 thru 3.7.2 to include all work from the receipt of the shaft to the submission of the inspection report? If not where should this cost be applied? Answer: Yes 4. Question: The FBO notice states that this is NOT a "Set Aside" opportunity and the contract clause on page 20 bullet (14) does not have an "X" for the Notice of Total Small Business Aside. However, the SF 1449, Box 10, states this acquisition is a 100% small business set aside. Please confirm if this is a full and open nation-wide bid or if this is a 100% small business set aside. Answer: This has been addressed in amendment 1 of the solicitation. This is a 100% set aside for small businesses. 5. Question: The FBO notice states that the Response Date is Sep 19, 2014 at 4:00pm. EST. However, the SF 1449, Box 8, state the offeror due date is Sep 4, 2014. Please clarify what the correct response due date is for this opportunity. Answer: This question was initially addressed through amendment 1 to the solicitation. The response date of this solicitation is being extended to 09/24/2014 at 4:00pm EST via this Amendment 2. All Offeror's are required to acknowledge/sign this amendment with their proposal.

More opportunities from Department Of Homeland Security → Sflc Procurement Branch 3(00040)

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS