Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Energy was posted on January 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

LBNF Liquid Argon LAr Circulation Equipment

Closed
Federal
Submission Closed
Solicitation #
LBNF-372669-JD

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract pertains to the engineering, manufacturing, testing, and delivery of the Liquid Argon (LAr) Circulation System equipment for the Vertical Drift (VD) and Horizontal Drift (HD) cryostats utilized in the Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE). The primary responsibility includes the supply of vacuum jacketed pump valve boxes, multi-layer insulation (MLI) insulated piping upstream and downstream of the main LAr circulation pumps (which themselves are excluded from this scope), isolation valves, instrumentation, pressure safety valves, and cryogenic equipment protection structures such as platforms, ladders, and supports. This system ensures the transfer of liquid argon from cryostats to the purification system via the main circulation pumps, with a focus on maintaining operational safety, accessibility, and reliability in extremely low-temperature environments. Comprehensive technical and functional requirements are articulated within the Statement of Work (SOW), including adherence to multiple engineering and industry standards such as API 520, ANSI/ISA specifications, and ACI 318. The contract is solicited by Fermi Forward Discovery Group, LLC (FFDG), based in Batavia, Illinois, under the Department of Energy’s prime contract for Fermilab operations, with the place of performance set at the Sanford Underground Research Facility (SURF) in Lead, South Dakota. The procurement follows a firm fixed price subcontract structure, with key milestone deliveries spanning from initial engineering phases in April 2026 through manufacturing, testing, and final delivery concluding in December 2027. Inspection and acceptance are dual-phased, involving factory inspections pre-shipment and final acceptance at the destination site, with strict quality assurance and inspection protocols enforced throughout, as laid out in robust project management and quality control plans. The solicitation outlines stringent packaging and preservation requirements to protect the sensitive cryogenic components during transport, including sealed, weather-resistant crates equipped with appropriate handling features and compliance with welding and material standards. Evaluation criteria prioritize past experience with similar cryogenic or large-scale equipment projects, technical merit in approach, and a comprehensive quality assurance plan, with all non-cost factors holding equal importance to price. Security and labor compliance clauses are strongly enforced, including IT security standards per NIST guidelines and adherence to worker wage laws. Amendments to the solicitation permit clarifications around design files and timelines, indicating the evolving nature of technical specifications while maintaining consistency in scope. Proposal submissions are required in two scanned PDF volumes—technical and price/business proposals—with supporting certifications and quality plans. The award process

General Info

Engineering, manufacturing, testing, and delivery of Liquid Argon Circulation System for LBNF/DUNE cryostats.

NAICS

3332 - Industrial Machinery Manufacturing

Place of Performance

Lead, SD, USA

Set-Aside

NONE

Documents

13
PDF, High priority: read this first2 pages · amendment
High
PDF, High priority: read this first8 pages · amendment
High
PDF, High priority: read this first1 page · amendment
High
PDF, High priority: read this first1 page · amendment
High
PDF, High priority: read this first1 page · amendment
High
DOCX, High priority: read this first1 page · amendment
High
PDF, High priority: read this first61 pages · sow
High
PDF, High priority: read this first24 pages · rfp
High
PDF, High priority: read this first1 page · specifications
High
PDF, Low priority2 pages · other
Low
PDF, Low priority20 pages · contract-document
Low
PDF, Low priority21 pages · other
Low
PDF, Low priority35 pages · other
Low

Read all 13 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

3 updates
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Dec 4, 2025 to Jan 5, 2026.

Deadline changed

Response deadline changed from Jan 5, 2026 to Jan 23, 2026.

Deadline changed

Response deadline changed from Jan 23, 2026 to Jan 30, 2026.

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Fermilab - DOE Contractor
Contacts1 person available
OfficeBatavia, IL, 60510, USA

Full Description

Show more

A brief summary of the scope is provided below.  For complete details please download the Statement of Work attached to this notice.


The LAr Circulation System VD and HD Equipment is responsible for transferring liquid argon coming from the Cryostat VD and Cryostat HD to the low-pressure suction side of the main LAr Circulation Pump (not part of this scope). It is also responsible for transferring liquid argon downstream of the main LAr Circulation Pump (not part of this scope) through the system resistance (friction and internal losses in valves, piping, etc.) to the LAr Purification system. The selected vendor will engineer and manufacture the vacuum jacketed pump valve box (part of the scope) that will house the pump, the MLI insulated upstream and downstream piping, isolation valves, and instrumentation required for this operation laid out above. The cryogenic equipment in the Detector Caverns will need to be properly protected and accessible with the use of platforms, ladders, support beams and railings (all part of this scope).


Scope Overview of the Supply Structure


The LAr Circulation System VD and HD acquisition is broken down into the equipment, valves and instrumentation that are detailed in the SOW


• Vacuum Jacketed Pump Valve Box


• MLI insulated upstream and downstream piping of the main LAr Circulation Pumps (Pumps are not part of Supply)


• Instrumentation


• Isolation Valves


• Pressure Safety Valves


• Cryogenic Equipment Protection (Platforms, Ladders and Supports

More opportunities from Department Of Energy → Fermilab - DOE Contractor

Same awarding agency

NAICS: 236220
New
Federal
Wilson Hall Floor 16 Electric and Elevator Machine Rooms Fire Rating and Mechanical Upgrade
Solicitation # 385515GMK
Fermilab has issued solicitation 385515GMK for the fire rating and mechanical upgrade of the Electric and Elevator Machine Rooms located on Floor 16 of Wilson Hall in Batavia, Illinois. The scope of work includes the installation of 2-hour rated walls and ceilings using Type X gypsum wallboard, sealing all penetrations between 1/4 inch and 6 inches, and the installation of a new AC-5 condenser on the East observation deck roof. The project requires the use of medium-weight CMU for fire-rated infill and adheres to strict technical standards, including TMS 602/ACI 530.1/ASCE 6 for masonry and AWS D1.1/D1.1M for structural welding. This is a Small Business Set Aside - Total. The procurement process includes a site visit and a series of amendments that have updated the project exhibits and Q&A logs. Proposals must be submitted electronically to Gina M. Kern by 3:00 pm CST on December 9, 2026. Key requirements include a two-year labor warranty from the date of substantial completion and the use of a professional engineer licensed in the State of Illinois for delegated design and PE-sealed submittals. Additionally, the contractor must engage the manufacturer's service representative to witness testing and inspect the Variable Refrigerant Flow HVAC system installations.
Commercial and Institutional Building Construction

POSTED

2 days ago

DEADLINE

in 12 days
View Details
NAICS: 236210
Federal
Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB
Solicitation # RFP-376508-CD
The Central Utility Building (CUB) Addition and Renovation project, designated as UIP Subproject 1-CUB, involves the expansion and revitalization of the CUB at the Fermi National Accelerator Laboratory in Batavia, Illinois. The scope of work includes the construction of a building addition to accommodate new chillers, selective demolition of existing infrastructure, and comprehensive upgrades to the heating hot water, chilled water, and electrical systems, including the installation of medium voltage switches and transformers. The project is critical to Fermilab's mission as the CUB provides essential utility services to various lab buildings. This is a firm-fixed-price contract with no set-aside used. Construction is strictly constrained by the accelerator shutdown window, with on-site efforts anticipated to start on January 1, 2028, and conclude by January 1, 2030, with a final completion deadline of October 1, 2029. Key milestones include the issuance of the Notice to Proceed by December 30, 2027, and the completion of the CUB extension and upgrades by September 28, 2029. Award selection is based on a best-value tradeoff method where technical factors are significantly more important than price. Offerors must meet stringent pass-fail requirements, including a minimum current ratio of 1.20, an aggregate bonding capacity of at least $100 million, and the provision of audited financial statements for the past three fiscal years.
Industrial Building Construction

POSTED

8 days ago

DEADLINE

in 20 days
View Details
NAICS: 332999
Federal
WFE Solenoid/Corrector Magnet Spares
Solicitation # 389116swk
Fermilab, managed by the Fermi Forward Discovery Group (FFDG) for the Department of Energy, is soliciting proposals for the design, manufacturing, fabrication, and delivery of two solenoid magnets with integrated dipole corrector magnets. These components are critical for steering, focusing, and matching a 30 keV H+ beam from an ion source into a Radio Frequency Quadrupole accelerator. The scope of work includes comprehensive quality control, magnetic testing, and the provision of detailed documentation such as final design reports, material certifications, and QC fabrication and inspection plans. Deliverables must be shipped F.O.B. Fermilab in a single batch, with strict packaging requirements to prevent corrosion and structural damage, including the use of shock indicators for loads exceeding 10 G. The procurement utilizes a best value trade-off source selection process, where technical proposals, infrastructure capabilities, schedule (via Gantt chart), and past experience are weighted as significantly more important than cost. Proposals are due by January 5, 2027, at 5pm Central, with a prior question deadline of November 30, 2026. Awardees must undergo a series of program reviews, including an initial kickoff, a Preliminary Design Review at 50% maturity, and a Final Design Review at 90-100% maturity before production begins. There is no specified set-aside status for this solicitation.
All Other Miscellaneous Fabricated Metal Product Manufacturing

POSTED

10 days ago

DEADLINE

in about 1 month
View Details
NAICS: 23822
Federal
PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION
Solicitation # 378854_MR
This project involves the fabrication and installation of a Low Conductivity Water (LCW) Piping System in the F-37 Pump Room at the Fermi National Accelerator Laboratory in Batavia, Illinois. The scope of work includes the installation of two 50 hp centrifugal pumps, a shell and tube heat exchanger, a 250-gallon expansion reservoir tank, and various process loop equipment such as a deionization skid, particulate filter, and dissolved oxygen removal skid. The contractor is responsible for providing all piping, hardware, process instrumentation, structural supports, and foundation bases, as well as performing electrical installations. The project is unrestricted and will be awarded based on a lowest price-technically acceptable (LPTA) selection process. The period of performance is 180 calendar days from the receipt of the Notice-to-Proceed. Key technical requirements include compliance with ASME B31.3 and B31.9, as well as Fermilab's specific pressure testing and piping manuals. Contractors must provide a project-specific quality control plan and adhere to strict safety standards, including 10 CFR 851 and FESHM Chapter 7010. Proposals must be submitted in two separate parts—technical and business/price—by December 3, 2026, at 2:00 p.m. CDT. Required certifications include the Buy American Act, DEI discrimination compliance, and the provision of performance and payment bonds. Access to the secured DOE site requires U.S. citizenship, a REAL ID, and an access request submitted at least seven days in advance.

POSTED

11 days ago

DEADLINE

in 6 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS