This Solicitation opportunity from Department Of Energy was posted on January 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
LBNF Liquid Argon LAr Circulation Equipment
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This contract pertains to the engineering, manufacturing, testing, and delivery of the Liquid Argon (LAr) Circulation System equipment for the Vertical Drift (VD) and Horizontal Drift (HD) cryostats utilized in the Long-Baseline Neutrino Facility (LBNF) / Deep Underground Neutrino Experiment (DUNE). The primary responsibility includes the supply of vacuum jacketed pump valve boxes, multi-layer insulation (MLI) insulated piping upstream and downstream of the main LAr circulation pumps (which themselves are excluded from this scope), isolation valves, instrumentation, pressure safety valves, and cryogenic equipment protection structures such as platforms, ladders, and supports. This system ensures the transfer of liquid argon from cryostats to the purification system via the main circulation pumps, with a focus on maintaining operational safety, accessibility, and reliability in extremely low-temperature environments. Comprehensive technical and functional requirements are articulated within the Statement of Work (SOW), including adherence to multiple engineering and industry standards such as API 520, ANSI/ISA specifications, and ACI 318. The contract is solicited by Fermi Forward Discovery Group, LLC (FFDG), based in Batavia, Illinois, under the Department of Energy’s prime contract for Fermilab operations, with the place of performance set at the Sanford Underground Research Facility (SURF) in Lead, South Dakota. The procurement follows a firm fixed price subcontract structure, with key milestone deliveries spanning from initial engineering phases in April 2026 through manufacturing, testing, and final delivery concluding in December 2027. Inspection and acceptance are dual-phased, involving factory inspections pre-shipment and final acceptance at the destination site, with strict quality assurance and inspection protocols enforced throughout, as laid out in robust project management and quality control plans. The solicitation outlines stringent packaging and preservation requirements to protect the sensitive cryogenic components during transport, including sealed, weather-resistant crates equipped with appropriate handling features and compliance with welding and material standards. Evaluation criteria prioritize past experience with similar cryogenic or large-scale equipment projects, technical merit in approach, and a comprehensive quality assurance plan, with all non-cost factors holding equal importance to price. Security and labor compliance clauses are strongly enforced, including IT security standards per NIST guidelines and adherence to worker wage laws. Amendments to the solicitation permit clarifications around design files and timelines, indicating the evolving nature of technical specifications while maintaining consistency in scope. Proposal submissions are required in two scanned PDF volumes—technical and price/business proposals—with supporting certifications and quality plans. The award process
General Info
NAICS
Place of Performance
Set-Aside
Documents
13AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownAsk CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Response deadline changed from Dec 4, 2025 to Jan 5, 2026.
Response deadline changed from Jan 5, 2026 to Jan 23, 2026.
Response deadline changed from Jan 23, 2026 to Jan 30, 2026.
Deadline has passed
Organization & Contact Information
Full Description
A brief summary of the scope is provided below. For complete details please download the Statement of Work attached to this notice.
The LAr Circulation System VD and HD Equipment is responsible for transferring liquid argon coming from the Cryostat VD and Cryostat HD to the low-pressure suction side of the main LAr Circulation Pump (not part of this scope). It is also responsible for transferring liquid argon downstream of the main LAr Circulation Pump (not part of this scope) through the system resistance (friction and internal losses in valves, piping, etc.) to the LAr Purification system. The selected vendor will engineer and manufacture the vacuum jacketed pump valve box (part of the scope) that will house the pump, the MLI insulated upstream and downstream piping, isolation valves, and instrumentation required for this operation laid out above. The cryogenic equipment in the Detector Caverns will need to be properly protected and accessible with the use of platforms, ladders, support beams and railings (all part of this scope).
Scope Overview of the Supply Structure
The LAr Circulation System VD and HD acquisition is broken down into the equipment, valves and instrumentation that are detailed in the SOW
• Vacuum Jacketed Pump Valve Box
• MLI insulated upstream and downstream piping of the main LAr Circulation Pumps (Pumps are not part of Supply)
• Instrumentation
• Isolation Valves
• Pressure Safety Valves
• Cryogenic Equipment Protection (Platforms, Ladders and Supports
More opportunities from Department Of Energy → Fermilab - DOE Contractor
Same awarding agency
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
