LCWTP Rebuild CM/GC RFP 2026
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Metropolitan Water District of Salt Lake and Sandy is soliciting proposals for a Construction Manager/General Contractor (CM/GC) to lead the Little Cottonwood Water Treatment Plant Rebuild Project in Utah. This critical infrastructure project aims to improve the resiliency, safety, and performance of the plant, with a total estimated construction cost of approximately 577 million dollars and a total project value potentially reaching 715.7 million dollars including fees and contingencies. The scope of work includes replacing process systems for filtration and sedimentation, upgrading electrical and control systems, constructing a new laboratory and office spaces, and relocating chemical systems. A key operational requirement is maintaining a minimum water production of 90 MGD during peak demand and ensuring the facility can withstand hazard events, specifically earthquakes. The project utilizes a two-phase delivery method. Phase I focuses on preconstruction services such as constructability reviews, value engineering, and risk management, concluding upon agreement of the project schedule and a Guaranteed Maximum Price (GMP). Phase II encompasses full construction, procurement, and commissioning, with substantial completion targeted for December 31, 2032. Selection is based on a best-value process using the analytical hierarchy process, combining proposal evaluations and interviews. The contract incorporates various federal requirements, including FAR clauses, Buy America preferences, and prevailing wage compliance. Proposals must be submitted via the U3P portal by September 22, 2026, and must adhere to a strict 35-page limit.
General Info
Agency
NAICS
Place of Performance
UT, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
The Project is to be designed and constructed in two phases using the CM/GC delivery method. Phase I preconstruction services encompass constructability reviews, value engineering, estimating, risk management, and scheduling activities. Phase I is completed when there is agreement on the Project schedule and guaranteed maximum price (GMP). Phase II construction services, in which the CM/GC assumes the general contractor role, encompasses further design review, risk management, procurement of subcontractors and vendors, equipment procurement, self-performance of certain elements of the construction (where permitted and at the Owner’s discretion), and full construction and commissioning, which may occur in a single or multiple GMP packages, at the discretion of the Owner.
Similar Contracts
Same NAICS industry code
More opportunities from Utah
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS