Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
The City of Toledo Department of Housing and Community Development is soliciting State of Ohio licensed Lead Abatement Contractors to establish a pool of providers for its Lead-Based Paint Hazard Control Grant. This multiple-award, fixed-cost pricing contract focuses on lead-based paint hazard control and healthy homes work, primarily for residential 1-4 single-family housing units within the City of Toledo. Awarded contractors must utilize licensed lead workers and comply with Project Labor Agreement requirements, prevailing wages, and a living wage mandate. The project aims to complete remediation on at least six privately owned residential units by December 31, 2027, with work commencing within ten days of a Notice to Proceed and substantial completion required within 15 days of the Abatement Project Prior Notification.
Workmanship must adhere to State and local housing quality standards, HUD Section 8 Housing Quality Standards, or HUD Uniform Physical Condition Standards. Final completion is verified through clearance testing, with specific microgram-per-square-foot limits for floors, window sills, window wells, and porch floors. The average estimated unit cost is $55,000, split between lead hazard control and healthy homes. Contractors must submit certified payrolls weekly and provide comprehensive documentation, including EEO compliance, debarment certification, and insurance naming the City of Toledo as an additional insurer. The City reserves the right to terminate the agreement for convenience with 30 days' notice, and any subcontracting requires prior approval from the DHCD.
General Info
Toledo seeks licensed contractors for residential lead-based paint hazard control and remediation.
One Government Center, Suite 1800 Toledo, Ohio 43604, OH, USA
Set-Aside
NONE
Documents
17
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Bid Specification Addition 24 - Project Labor Agreement: This document is an addition to the Bid Specification, specifically Addition 24, concerning the Project Labor Agreement (PLA) requirements for construction contracts funded by the City of Toledo. It references Toledo Municipal Code Section 187.12(d), mandating that successful bidders of construction contracts valued at $100,000 or greater must enter into a PLA with the Northwest Ohio Building and Construction Trades Council (NWOBTC). The document outlines the timeline for a pre-job conference within 15 days of award notification and the requirement to deliver an executed PLA within 15 working days after the conference. The PLA must be signed by the lead contractor and the Executive Secretary of NWOBTC to be valid. Compliance with the PLA provisions by the successful bidder and all contractors and subcontractors is mandatory.
PDF
PDF, High priority: read this firstcertification
HighAI Summary for City of Toledo 2026 Contractor Equal Employment Opportunity Certification and Living Wage Affidavit: This document is the City of Toledo's 2026 Contractor Equal Employment Opportunity Certification and Living Wage Affidavit. It outlines the contractor's commitment to non-discrimination in employment practices, compliance with labor regulations, and enforcement provisions. The affidavit certifies adherence to the City's Living Wage ordinance, specifying wage rates and health benefit requirements or applicable exemptions. It includes a certification regarding debarment and suspension status of the contractor. The document is dated December 17, 2025, and is intended for contractors performing work under City contracts in 2026.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for City of Toledo Insurance Requirements for Construction Contracts > $100k: This document outlines the mandatory insurance requirements for construction contractors performing work for the City of Toledo on contracts exceeding $100,000. It specifies minimum coverage limits for Commercial General Liability, Automobile Liability, and Umbrella Liability, as well as requirements for Builder's Risk/Installation Floater property insurance and waiver of subrogation.
PDF
PDF, High priority: read this firstvendor-registration-form
HighAI Summary for City of Toledo Vendor Registration and Compliance Packet 3.11.2026: This document is a vendor registration and compliance packet for the City of Toledo dated March 11, 2026. It includes a Vendor Registration Form to be completed and returned for bidding opportunities, a Business Registration Form for municipal income tax compliance, a Court-Ordered Child Support Compliance affidavit required for contracts over $10,000, and a Vendor Utility Account Status Verification form. The packet outlines tax registration requirements, business and contact information collection, and compliance with city ordinances and policies.
PDF
PDF, High priority: read this firstbid-submittal-checklist
HighAI Summary for Construction Bid Submittal Checklist 3.20.26: This document is an updated bid submittal checklist for construction contracts, dated March 20, 2026. It outlines mandatory components required in the bid package, including vendor registration, annual paperwork, project-specific paperwork, and bid guaranty requirements. It provides detailed instructions for electronic bid submission via the PlanetBids platform, including technical requirements and document uploads. The checklist specifies forms such as vendor registration, business taxation, child support affidavit, CEO compliance, debarment certification, living wage affidavit, insurance certificates, and subcontractor agreements. It also details bid guaranty amounts and acceptable forms of bid security. The document serves as a comprehensive guide to ensure bidders submit complete and compliant bids for construction contracts with the City of Toledo.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Construction Project Paperwork Packet 3.10.2026: This document titled 'Construction Project Paperwork Packet 3.10.2026' includes acknowledgment and acceptance of terms and conditions, contract specifications, instructions to bidders, and bid sheets or request for proposals issued by the City of Toledo. It contains a Living Wage Contract Addendum outlining wage requirements per Toledo Municipal Code for contracts over $10,000, including compliance and retaliation clauses. The document also requires listing of subcontractors and includes Best Bid Criteria for construction projects over $75,000, detailing evaluation factors such as experience, workforce, compliance, and safety. The document is dated 2026 and serves as a comprehensive contract compliance and bidding packet for construction projects.
PDF
PDF, High priority: read this firstlabor-standards-notice
HighAI Summary for Labor Standards Notice - Living Wage and Prevailing Wage Requirements: This Labor Standards Notice outlines the Living Wage and Prevailing Wage requirements applicable to contractors and financial assistance recipients under Toledo Municipal Code Chapter 187 and related laws. It mandates minimum compensation levels, including a living wage of at least $17.00 per hour or 110% of the federal poverty level, with provisions for health benefits or higher wages if benefits are not provided. The notice details exemptions, employee notification requirements, and penalties for non-compliance. It also incorporates prevailing wage laws, requiring payment of prevailing wages and fringe benefits as determined by the Ohio Department of Commerce, with specific payroll recordkeeping and certified payroll report submission instructions. The document is essential for ensuring compliance with local, state, and federal labor standards on applicable projects.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Lead Based Paint Hazard Control Grant Fixed Cost Pricing Schedule: A fixed cost pricing schedule dated September 11, 2026, for a Lead Based Paint Hazard Control Grant. The document details unit pricing and technical specifications for lead-safe housing repairs, including gutter installation, window replacements (vinyl and wood/vinyl clad), roofing repairs, and door installations, all adhering to HUD Lead Safe Housing requirements.
DOCX
DOCX, High priority: read this first2 pages · letter-of-assent
HighAI Summary for Letter of Assent for Project Labor Agreement Toledo 2021: This document is a Letter of Assent related to the Project Labor Agreement for construction projects in Toledo, Lucas County, Ohio, dated 2021. It binds contractors and subcontractors to the terms of the Project Labor Agreement, requiring compliance with its conditions, including securing Letters of Assent from subcontractors, conducting pre-job conferences with the Northwestern Ohio Building and Construction Trades Council, and adherence to penalties for non-compliance. The document formalizes the contractor's commitment to abide by the labor agreement for the referenced project.
PDF
PDF, High priority: read this first72 pages · wage-determination
HighAI Summary for Lucas County Prevailing Wage Rates - Skilled Crafts: This document specifies the prevailing wage rates and fringe benefits for various skilled crafts in Lucas County and surrounding jurisdictions. It includes detailed pay scales, apprentice ratios, and effective dates for Asbestos Workers (Local 45), Boilermakers (Local 85), and Bricklayers/Cement Masons/Tile Setters (Local 23), with effective dates ranging from 2012 to 2026.
DOCX
DOCX, High priority: read this first6 pages · sow
HighAI Summary for RFP for Lead Contractors - LBPHC DON25 Scope & Specifications: Revised scope and specifications document for lead contractors under the LBPHC DON25 procurement. It outlines the technical requirements and performance expectations for the contracted services.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for City of Toledo 2026 Paperwork Submission Schedule: This document from the City of Toledo outlines a new streamlined approach for bidders to submit paperwork starting March 13, 2026. It categorizes required documents into City Paperwork, Annual Paperwork, and Project Paperwork, specifying which need to be submitted once per company, annually, or with each bid. The notice aims to simplify the paperwork process for all contracts with the City in 2026 and provides contact information for questions.
DOCX
DOCX, Low priority8 pages · contract-document
LowAI Summary for City of Toledo Lead-Based Paint Hazard Control Construction Contract: A construction contract between the City of Toledo and a contractor for lead hazard control remediation on at least six privately owned residential units. The contract is funded via the HUD Lead-Based Paint Hazard Control Program, with a total value up to $330,000 ($55,000 per unit) and a performance deadline of December 31, 2027.
DOCX
DOCX, Low priority4 pages · past-performance
LowAI Summary for Contractor Capacity Affidavit: A contractor capacity and experience questionnaire used to evaluate a vendor's regulatory compliance, workforce capacity, and past performance, specifically focusing on lead hazard control and abatement projects in the State of Ohio.
PDF
PDF, Low priority18 pages · contract-document
LowAI Summary for Project Labor Agreement for City of Toledo Construction Project: This Project Labor Agreement is entered into between the Developer/Contractor and the Northwestern Ohio Building and Construction Trades Council for the construction of a City of Toledo project. It establishes terms to ensure efficient, safe, and timely completion of the project with skilled local labor, aiming to reduce costs and foster responsible contracting. The agreement covers all construction work under the contractor's direction, requiring all contractors and subcontractors to be signatories and abide by its terms. It includes provisions for labor-management cooperation, dispute resolution without strikes or lockouts, and adherence to applicable local collective bargaining agreements, with this agreement superseding conflicting terms except for certain national agreements. The document outlines the intent, scope, and enforcement mechanisms including fines for non-compliance.
PDF
PDF, Low priority2 pages · fact-sheet
LowAI Summary for Project Labor Agreements Fact Sheet - City of Toledo: This fact sheet provides an overview of Project Labor Agreements (PLAs) required for construction projects valued at $100,000 or greater funded by the City of Toledo. It outlines the applicability to all contractors and subcontractors on-site or adjacent to the worksite, the timeframe for executing PLAs after bid award, and the requirement for a pre-job conference with the Northwest Ohio Building and Construction Trades Council. The document clarifies that PLAs do not affect the City's Minority Business Enterprise Program or bidder duties under the Toledo Municipal Code. It also addresses wage and fringe benefit payments according to local collective bargaining agreements, prohibits strikes or work stoppages during the PLA term, and references the grievance and dispute process in Article VI of the PLA.
PDF
PDF, Low prioritytax-exempt-certificate
LowAI Summary for Tax Exempt Certificate Construction Pre-Filled: This document is a Construction Contract Exemption Certificate for sales and use tax purposes related to construction contracts. It identifies the contractee as the City of Toledo and outlines various categories under which tangible personal property may be exempt from tax when incorporated into real property. The certificate requires signatures from the prime contractor, owner/contractee, subcontractor, and political subdivision representatives. It serves as a formal declaration to claim tax exemption on materials used in construction projects under specific Ohio Revised Code provisions.
Questions must be submitted thru the Q & A tab of this bidContact
Full Description
Show more
Scope: The purpose of this solicitation is to create/expand an established pool of Ohio Licensed Lead Abatement Contractors-Offerors to assist the City of Toledo, Department of Housing and Community Development (DHCD) in meeting its established goals for its Lead-Based Paint Hazard Control Grant. State of Ohio licensed Lead Abatement Contractors will perform lead-based paint hazard control work of varying degrees primarily on residential 1-4 single-family housing units, using State of Ohio licensed Lead Workers. This solicitation will result in a multiple-award (split award) contract, and all awarded contractors shall comply with the Project Labor Agreement (PLA) requirements associated with this project. Notes: City forms must be filled out and attached to the proposal: Project Paperwork (Acknowledgment and Acceptance of Conditions Contract Specifications; Primary and Subcontractor Certificates and Living Wage Contract Addendum); Professional Services Contract; Current Worker’s Compensation Certificate; If not previously provided, City Paperwork: Vendor Registration Form; Business Tax Registration Form; Child Support Affidavit, notarized; Vendor Utility. If this is your first bid with COT for 2026, the following will be required, Annual Paperwork: W-9; Insurance Certificate, naming the City of Toledo as an additional insurer – requirements available on the “Documents” Tab of PlanetBids; EEO Compliance; Debarment Certification; and Living Wage Affidavit. The following items will be required prior to awarding the contract: Independent Contractor PERS forms; and additional Insurance as Required. Bid Bond: 0.00%