This Solicitation opportunity from Florida was posted on March 19, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Lee Wenner Parking Lot Improvement Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Cocoa is undertaking a project to upgrade and expand the parking and recreational facilities at Lee Wenner Park, a 5.5-acre waterfront site along the Indian River Lagoon. The improvements focus on enhancing parking capacity for boating and social events through a series of construction activities, including demolishing existing paved and unpaved areas, regrading, installing new drainage systems such as exfiltration trenches, and reconfiguring parking layouts. The project also involves laying new asphalt paving, installing concrete curbing, pavement markings, traffic signage, and new lighting infrastructure in accordance with an FPL lease agreement. Special attention is given to protecting underground gas and electric transmission lines during construction, with the work expected to be completed by April 2024, coinciding with the finalization of the street lighting agreement with FPL. FPL will supply conduit, handholds, poles, and lights, with installation and energization typically occurring within three weeks after notice to proceed. The contract, titled "Lee Wenner Parking Lot Improvement Project," was posted on March 19, 2024, with a response deadline of April 24, 2024. It is managed under the NAICS code 812930 and is organized by the City of Cocoa, Florida. The project involves coordination with utility providers, notably FPL, to ensure timely installation of lighting infrastructure, which has a lead time of approximately six to seven months for poles. The primary point of contact for the project is Brian Dale, reachable via email. The project aims to improve park access and safety, supporting increased recreational and cultural activities at the site.
General Info
Agency
Place of Performance
FL, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
The City of Cocoa CRA is upgrading the Lee Wenner Park to improve and expand the available parking for boating and proximate social and cultural events. The park is generally bounded by the King Street / Merritt Island Causeway ROW to the north, Riveredge Blvd to the west, and the Indian River Lagoon to the south and east. Harrison Street extension provides the ingress and egress route.
The work on this project includes, but is not limited to, the following: 1. Upgrade of parking facilities, including selective demolition of existing paved and unpaved areas, drainage, and utilities. 2. Re-grading of the improvement area. 3. Construction of new drainage features, including an exfiltration trench. 4. Reconfiguration of existing paved parking. 5. Installation of new asphalt paving and concrete curbing. 6. Installation of associated pavement markings and traffic signage. 7. Installation of new conduits and lighting in compliance with the FPL lease agreement with the City of Cocoa. 8. Care and protection of new underground gas and electric transmission facilities throughout the work zone.
Both FPL and City gas will have completed their work (alternate gas run & FPL fiber) through this project area by the end of April 2024. The City is finalizing the street light agreement with FPL. Be advised that there is a 6-7 month lead time on poles. FPL will provide all conduit and handholds for the backbone of the lighting for our Prime Contractor to install. FPL will install all poles/lights, pull wires, and energize the system typically within 3 weeks from NTP.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
