Levee Excavation and Embankment Construction

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Levee Excavation and Embankment Construction involves primary civil engineering work for Reclamation District 536 in Rio Vista, California. The scope of work includes stripping, clearing, and grubbing upland vegetation, removing 50 non-native trees, and excavating unsuitable materials within 25 feet of the levee toe. The project requires the reconstruction of a 2,050 linear foot levee embankment to a 4:1 finish grade. This process will utilize heavy excavation and compaction equipment to manage both stockpiled and imported fill materials to ensure a fully reconstructed and compacted embankment.

General Info

Levee excavation and embankment reconstruction for Reclamation District 536 in Rio Vista, California.

Agency

California → Reclamation District 536

Place of Performance

Rio Vista, CA

Set-Aside

NONE

Documents

This scope was carved out of WA2025122.

The full solicitation package (9 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Lindsey Slough Levee Rehabilitation Project Unit 1

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Reclamation District 536
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Reclamation District 536
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs primary civil engineering work for prime contractors on Reclamation District No. 536 levee projects. Strips, clears, and grubs upland vegetation, removes 50 non-native trees, and excavates unsuitable materials 25 ft from the levee toe. Reconstructs levee embankment to a 4:1 finish grade using stockpiled and imported fill with heavy excavation and compaction equipment. Delivers a reconstructed and compacted 2,050 linear foot levee embankment.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and reconstruction of eight launching ramps across four bays, designed to accommodate vessels exceeding 35 feet and weighing over 10 tons. Key project activities include the demolition of existing concrete structures, dredging and grading of native soils, placement of various gravel fills, and the installation of new concrete ramps using either a precast slab system or pour-in-place solution. Additionally, the contractor is responsible for the temporary relocation and re-anchoring of floating docks to ensure ADA-compliant travel, the installation of articulated concrete mattresses for scour protection, and the implementation of strict environmental controls, including turbidity curtains and stormwater pollution prevention plans. Bidders must be pre-qualified in Marine Construction for at least 750,000 dollars and provide a bid security deposit equal to 10 percent of their maximum bid price. The project must be completed within 180 calendar days from the Notice to Proceed, with a hard deadline for full public restoration by February 15, 2027. To minimize public disruption, the contract limits the simultaneous closure of all four ramps to a maximum of 45 calendar days. Performance will be verified through third-party topographic surveys, with acceptance based on post-grading soundings compared to the design template. Progress payments will be prorated monthly based on the physical percentage of project completion.
Public Works

POSTED

about 4 hours ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS