Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Lindsey Slough Levee Rehabilitation Project Unit 1

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Reclamation District No. 536 is undertaking the Lindsey Slough Levee Rehabilitation Project Unit 1 to repair approximately 2,050 linear feet of levee along the right bank of Lindsey Slough in the Egbert Tract near Rio Vista, California, with the goal of ensuring long-term flood protection. The project is scheduled for construction in two phases during the 2025 construction season, which is restricted to the period between May 1 and November 1, with Phase 1 anticipated to last three to four weeks and Phase 2 six to eight weeks. The work is subject to strict environmental compliance under the California Environmental Quality Act (CEQA), requiring adherence to the Mitigation Monitoring and Reporting Program outlined in Appendix F, including stormwater pollution prevention plans, best management practices, and coordination with regulatory agencies such as the California Department of Fish and Wildlife, California Air Resources Board, and the U.S. Army Corps of Engineers. Emission controls are mandated to reduce air pollutants like PM2.5, NOx, and CO2e during construction, with measures tied to material movement, vehicle usage, and grading operations, all regulated by the Yolo/Solano Air Quality Management District. Special requirements include hazardous material handling protocols, fire prevention and response plans, noise restrictions aligned with local ordinances, and a mandatory 2:1 tree mitigation ratio for any vegetation removed, with replacement trees planted on-site or at an approved location. All personnel must complete site-specific safety and environmental training before work begins. The project’s primary point of contact is Cale Crawford, Board President of Reclamation District No. 536, with technical oversight provided by MBK Engineers and Stillwater Sciences, who are responsible for environmental monitoring and compliance validation. While the estimated contract value is not specified and no formal pricing structure is provided, the project is classified as a forecast notice with a posted date of November 3, 2025, and a signing date of August 13, 2025. No federal acquisition regulation clauses, evaluation factors for contractor selection, or invoicing and payment details are included in the available information, indicating that procurement processes appear to be governed at the local level rather than under federal contracting frameworks.

General Info

Reclamation District No. 536 to rehab 2,050 ft of Lindsey Slough levee in 2025 with strict environmental and safety compliance.

Agency

California → Reclamation District 536

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Rio Vista, CA, 94571

Set-Aside

NONE

Documents

(9)

SCH Summary Form - Lindsey Slough Levee Rehabilitation Project Unit 1

PDFenvironmental-summary

RD 536 Lindsey Slough Levee Rehabilitation Project NOC

PDFnotice-of-completion

RD 536 Notice of Intent to Adopt Mitigated Negative Declaration

PDFnotice-of-intent

Notice of Determination for Lindsey Slough Levee Rehabilitation Project Unit 1

PDFnotice-of-determination

2025080671_RWQCB Comment on Lindsey Slough Levee Rehabilitation Project

PDFcomment

Lindsey Slough Levee Rehabilitation Project - CalGEM Well Abandonment Advisory

PDFspecial-notice

WA2025122 Notice of Determination - Lindsey Slough Levee Rehabilitation Project

PDFnotice-of-determination

Initial Study/Mitigated Negative Declaration for Lindsey Slough Levee Rehabilitation Project Unit 1

PDFmitigated-negative-declaration

Initial Study/Mitigated Negative Declaration for Lindsey Slough Levee Rehabilitation Project Unit 1

PDFmitigated-negative-declaration

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Reclamation District 536
Contacts1 person available
OfficeN/A
Organization / Agency
California → Reclamation District 536
Office AddressN/A
Contacts
Cale CrawfordRD 536 Board President

Interested Companies (1)

Show more
MBK Engineers
Sacramento, CA

Full Description

Show more
Reclamation District No. 536 to maintain levee integrity and provide longterm flood protection to Egbert Tract, is planning to repair approximately 2,050 linear feet of levee along the right bank of the Lindsey Slough Levee (Unit 1).

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
45th Ave SW Culvert Replacement and Habitat Restoration
Solicitation # 45th-ave-sw-culvert-replacement-habitat-restoration
The City of Seattle is seeking contractors for the replacement of a culvert along 45th Avenue SW and the associated restoration of surrounding habitat, with the project located in King County, Washington. The solicitation, identified as 2025-017, is open to Minority Business Enterprises certified by NMSDC and Woman Business Enterprises certified by WBENC, reflecting the city’s commitment to inclusive contracting practices. The work involves the removal of the existing infrastructure and installation of a new culvert system designed to improve water flow and structural integrity, while simultaneously restoring natural habitat features to support local ecosystems. The project is classified under NAICS code 237990, indicating it falls under other heavy and civil engineering construction, and the prime contractor is Shimmick Construction Company, Inc., which manages the solicitation process and serves as the point of contact for inquiries. The response deadline is August 12, 2026, with Jamie Miranda listed as the primary contact for all communications, reachable at 707-410-5070 or jmiranda@shimmick.com. While the physical location is in Seattle, no specific street address or zip code is provided in the data, and all performance is expected to occur within the state of Washington.
Shimmick Construction Company, Inc

POSTED

about 8 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237990
New
International
City of Calgary - Request for Proposal - RFP 26-1667 For Glenmore RWPS Penstock Crossover Piping and Valve Replacement
Solicitation # AB-2026-05612
The City of Calgary is seeking qualified contractors to perform construction services for the Glenmore Raw Water Pump Station Penstock Crossover Piping and Valve Replacement project, which involves the complete replacement of existing penstock crossover piping and associated valves, demolition of the current standpipe, and lead abatement on existing infrastructure. The scope includes the supply, installation, testing, and commissioning of new crossover and standpipe piping systems, along with all valves, fittings, supports, steelwork, platform structures, grating, and other miscellaneous metalwork required to restore and enhance system functionality. All work must comply with applicable safety and environmental standards, particularly regarding lead abatement procedures. This opportunity is exclusively available to contractors pre-qualified by the City of Calgary and is issued under solicitation number AB-2026-05612, posted on August 8, 2026, with responses due by September 1, 2026. Proposals must be submitted via SAP Ariba, where detailed technical and administrative requirements are outlined in the RFP documents. The project is located in Alberta, and all inquiries should be directed to Waris Khattana, the primary point of contact, via the provided email or phone number. Only firms meeting the City’s pre-qualification criteria will be considered for award.
City of Calgary

POSTED

about 11 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237990
New
SLED
27003-B Solids Removal
Solicitation # PE-65600-NONST-2027-000000250
Fayette County, Georgia is soliciting bids for the dredging and solids removal from lagoons under solicitation number PE-65600-NONST-2027-000000250, titled 27003-B Solids Removal. Interested contractors must submit their proposals by 3:00 p.m. on Tuesday, September 8, 2026, to the Purchasing Department located at 140 Stonewall Avenue West, Suite 204, Fayetteville, GA 30214. The opportunity is open to all qualified bidders without specific set-aside restrictions, and all bids must comply with the detailed requirements outlined in the attached Invitation to Bid document. The work will be performed within Fayette County, Georgia, and the county anticipates selecting a contractor capable of safely and efficiently removing accumulated solids to maintain lagoon functionality and regulatory compliance. All questions regarding the bid should be directed to Colette Cobb, the primary point of contact, via email at ccobb@fayettecountyga.gov or by phone at 770-305-5115. The solicitation was posted on August 7, 2026, and additional information, including full bid documents, can be accessed through the official state procurement portal using the provided UI link. Contractors are responsible for reviewing all documentation thoroughly prior to submission, as failure to meet specifications or deadlines may result in bid rejection. The county reserves the right to accept or reject any or all bids without explanation, and award decisions will be made based on compliance, competitive pricing, and demonstrated technical capability.
Fayette County Board of Commissioners

POSTED

about 15 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
Fern Ridge Wildlife Area Coyote Creek Boating Access
Solicitation # S-63500-00017424
The Oregon Department of Fish and Wildlife is soliciting bids for the construction of a boating access facility at Coyote Creek within the Fern Ridge Wildlife Area under solicitation number S-63500-00017424. The project involves a range of civil and infrastructure construction activities including earthwork, driving steel piles, installing a paddle craft launch dock, sheet piling, storm drain piping and conveyance systems, aggregate base placement, concrete curbing and sidewalk construction, and asphalt paving. All work must be completed in accordance with specifications to ensure safe and durable access for recreational boating users. The solicitation is open to qualified contractors with no specific set aside identified and is managed through the state agency’s procurement system. Responses are due by September 3, 2026, at 11:00 PM Pacific Time, with the request publicly posted on August 7, 2026. The contract will be managed by the Oregon Department of Fish and Wildlife based in Salem, Oregon, with Claire Duvall listed as the primary point of contact. The place of performance is located in Salem, Oregon, and all work must be carried out at the designated site within the Fern Ridge Wildlife Area. Contractors are expected to comply with all state and federal regulations governing construction in protected wildlife areas, and full details are accessible through the provided online portal.
ODFW

POSTED

about 16 hours ago

DEADLINE

in 26 days
View Details