Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Liberty Road and Sowles Road Resurfacing

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Joaquin County Public Works Department is overseeing the Liberty Road and Sowles Road Resurfacing project to address pavement rutting and cracking. The project covers Liberty Road from Dustin Road to Elliot Road and Sowles Road from Collier Road to Liberty Road. The scope of work includes resurfacing Liberty Road with 0.17 feet of Type A Hot Mix Asphalt and Sowles Road with 0.25 feet of Type A Hot Mix Asphalt. Additionally, the contractor will perform full depth repairs on structural failure areas, replenish 4-foot-wide shoulder backing, apply penetration treatment at intersection radii, construct driveways, and adjust monument frames and covers. The project is categorized as a categorical exemption under CEQA as it involves the repair of existing facilities. Due to the rural environmental setting, the project must comply with the Migratory Bird Treaty Act. Specifically, because the Swainson's Hawk is a threatened species of concern in California, a pre-construction survey for nesting hawks and other migratory birds is recommended if work is scheduled between February 15th and September 1st. The primary administrative contact for the project is Assistant Planner Fatima Gutierrez.

General Info

Resurface Liberty and Sowles Roads with HMA, repair structural damage, add shoulders, treat intersections, comply with bird protection rules.

Agency

California → San Joaquin County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Dustin Road, Bruella Road, Collier Road, Elliot Road, CA

Set-Aside

NONE

Documents

(1)

Liberty Road and Sowles Road Resurfacing - Notice of Exemption and Project Description

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Joaquin County
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Joaquin County
Office AddressN/A
Contacts
Fatima GutierrezAssistant Planner

Full Description

Show more
LIBERTY ROAD AND SOWLES ROAD RESURFACING Project Description Project Location: Liberty Road: Dustin Road to Elliot Road; Sowles Road: Collier Road to Liberty Road. See attached Vicinity Map. Project Justification: Liberty Road’s original roadway was constructed in 1948 with an unknown structural section. In 1973, it was reconstructed to a 24-foot-wide roadway with 2 inches of Asphalt Concrete (AC) over 6 inches of Aggregate Base (AB). In 1985, the road was resurfaced from Dustin Road to Elliot Road with 2 inches of AC. In 1999, the road was resurfaced from Dustin Road to Bruella Road with 3 inches of AC. In 2001, the road was resurfaced from Bruella Road to Elliot Road with 3 inches of AC. The existing roadway has been maintained with periodic chip seals with the most recent chip seal in 2021. Sowles Road’s original 18-foot-wide roadway was constructed by Road Maintenance in 1971 with 2 inches of AC over 6 inches of AB. The existing roadway has been maintained with periodic chip seals with the most recent chip seal in 2021. The existing pavement consists of some rutting and transverse, longitudinal, and edge cracking throughout the project limits. Scope of Work: The project will consist of: 1. Resurfacing existing roadway on Liberty Road (24 feet wide) with 0.17 feet of Hot Mix Asphalt (HMA) (Type A) and on Sowles Road (18 feet wide) with 0.25 feet of HMA (Type A). 2. Repairing pavement structural failure areas with full depth 0.25 feet of HMA (Type A). 3. Replenishing 4-foot-wide Shoulder Backing: 2 feet (8%) and 2 feet to conform. 4. Applying Penetration Treatment at all intersection radii plus 50 feet or to conform. 5. Constructing HMA (Type A) driveways. 6. Adjusting monument frames and covers. Environmental Setting: In these portions of the San Joaquin County, land usage is rural with single family homes. There are many large trees adjacent to the project area. Nesting and migratory birds, protected by the Migratory Bird Treaty Act, may nest within these trees. Furthermore, the Swainson’s Hawk, a raptor species of concern within the State of California and listed as threatened may nest adjacent to or within the project area. A pre-construction survey for nesting Swainson’s Hawks and other migratory birds is recommended if construction is scheduled to occur from February 15th to September 1st. Beneficiaries: The public will see increased safety and fewer hazards with these well-maintained roads. Overall, there will be reduced maintenance concerns and more reliability within the project area.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 8 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS