This Solicitation opportunity from Washington was posted on May 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Lift Station No. 1 & WPCF Chlorine Contact Channel Isolation Valve Replacement, City of Everett, WA #2025 012187 & UT3851-1-1-2
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Everett is seeking a qualified contractor to perform critical upgrades at Lift Station No. 1 and the Water Pollution Control Facility, centered on the replacement of key infrastructure components within the wastewater system. For Project A, the work involves extensive underground construction along a 30-inch ductile iron force main, including temporary erosion controls, trenching, shoring, dewatering, and backfilling to support the installation of a new plug valve, precast vault with cast-in-place footings, and a line stop fitting. This requires bypass pumping from Backup Lift Station 1B to maintain service during the work, concrete installation to support line stopping equipment, removal of a section of the existing force main, and final surface restoration. Project B focuses on the chlorine contact channel isolation valve vault, where the existing 48-inch butterfly valve, stem, and operator pedestal must be demolished and removed, the flange cut from the concrete cylinder pipe, and a new 48-inch butterfly valve with flange coupling adapter and pipe support installed. The contractor must also temporarily remove and reinstall the vault cover to facilitate this work, all while maintaining strict adherence to safety and environmental standards. A mandatory pre-bid meeting is scheduled for either May 6 at 2:00 PM or May 13 at 11:00 AM at 4027 4th Street SE, Everett, WA 98201, and all proposals must be submitted by the deadline of May 19, 2026, to be considered for award.
General Info
Agency
NAICS
Place of Performance
Everett, WA, 98201, USASet-Aside
Documents
(529)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Interested Companies (6)
See All 6 Interested Companies
Start a free trial to view all interested companies, their contact details, and full contractor profiles.
Full Description
Project A:
1. Temporary erosion and sediment control measures.
2. Trenching, excavation, shoring, dewatering, bedding, backfill, and compaction for installation of a new plug valve, precast vault, and line stop fitting along an existing 30-inch ductile iron force main.
3. Bypass pumping from backup LS 1B to the LS 1 wet well to facilitate installation of the line stop, new 30-inch valve, and associated appurtenances.
4. Installing a line stop fitting, including pouring and curing a concrete block under the existing pipe to support the line stopping equipment, to execute a line stop and removing the line stop equipment and sealing the line stop fitting when the valve installation is complete.
5. Removing a portion of the existing 30-inch ductile iron force main to facilitate installation of the new plug valve.
6. Installing the new 30-inch plug valve, connecting piping, and associated appurtenances.
7. Installing a precast vault for the new 30-inch plug valve with cast-in-place footings.
8. Surface restoration.
Project B:
1. Temporary erosion and sediment control measures.
2. Removing and reinstalling the existing chlorine contact channel isolation valve vault cover to facilitate replacement of an existing 48-inch butterfly valve.
3. Cutting the flange off the existing 48-inch concrete cylinder pipe in the vault to facilitate installation of the new valve.
4. Demolishing and removing the existing isolation butterfly valve, stem, and operator pedestal at the chlorine contact channel isolation valve vault.
5. Installing a new 48-inch butterfly valve, flange coupling adapter, and pipe support in the existing chlorine contact channel isolation valve vault.
Pre-Bid Meeting: Mandatory: 5/6 @ 2:00 pm or 5/13 @ 11:00 am on site, 4027 4th Street SE, Everett, WA 98201
More opportunities from Washington → City of Everett
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS