Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on July 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Lincoln NF Roof Rehabilitation - TPO Recover System

Closed
127EAX26Q0010Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 5 hours ago

DEADLINE

in 6 days
NAICS: 238160
New
SLED
Mesilla Valley Community of Hope Building 5 Re-roof
Solicitation # 26-27-035
Solicitation 26-27-035, issued by the City of Las Cruces Public Works department, is for the re-roofing of Building 5 at the Mesilla Valley Community of Hope located at 999 W. Amador Avenue, Las Cruces, New Mexico. The project has an estimated total cost of 400,000.00 dollars and involves the removal and replacement of all existing insulation, roof membrane, and metal roofing. The scope of work includes the installation of thermoplastic membrane roofing, standing seam metal roofing, and sheet metal flashing and trim, along with additional insulation and cricketing materials to enhance drainage and performance. Additionally, the contractor must replace ceiling tiles and repair deteriorated stucco and windows at the clerestory. The facility must remain fully operational throughout construction, requiring materials to be procured and delivered prior to demolition to minimize disruption. Bids are due by 2:00 pm on November 3, 2026, and must be submitted via the OpenGov portal. The contract will be awarded based on the lowest individual, grouped, or lump sum unit price, with preferences of up to 10 percent available for New Mexico resident veterans, New Mexico residents, local Las Cruces businesses, and the use of recycled content. Awarded contractors must provide performance and payment bonds, proof of insurance, and adhere to prevailing wage rates as per Wage Decision DA-26-3243-B. All work must comply with SMACNA and AAMA 2605 standards, OSHA safety regulations, and New Mexico Administrative Code licensing requirements. The contract includes a one-year correction period for defective materials and workmanship, with liquidated damages set at 500 dollars per day.
Public Works

POSTED

1 day ago

DEADLINE

in 7 days
NAICS: 238160
New
SLED
TDF - PIF Rooftop Walkway SP
Solicitation # B-54660
The Illinois Department of Human Services is soliciting bids for the installation of approximately 2,000 feet of anti-slip roofing walkway pads at the TDF Rushville facility. The project requires 1,600 feet of Versico brand pads for existing tan TPO roofing and 400 feet of Firestone brand pads specifically for the Gamma housing unit roof. All pads must be 34 inches wide with a minimum thickness of 150 mil, feature a raised diamond plate tread pattern, and include safety yellow edges if available from the manufacturer. Installation must be performed by an approved Versico and/or Firestone installer in accordance with manufacturer specifications and ASTM standards. To be considered responsive, the prime vendor must perform at least 51 percent of the work using permanent, full-time W-2 employees who have been employed for at least 30 consecutive days prior to bid submission. Vendors must certify compliance with the Illinois Prevailing Wage Act, the Illinois Department Human Rights Act, and various state certifications regarding legal entity status, felony convictions, and tax delinquency. The contract includes a 12-month warranty period and allows for termination for convenience with 30 days' written notice. Payments are processed according to the State Prompt Payment Act, and the contract is contingent upon the availability of funds from the Illinois General Assembly or federal sources.
MENTHLTH444 - Mental Health

POSTED

1 day ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The solicitation for the Lincoln NF Roof Rehabilitation - TPO Recover System, under solicitation number 127EAX26Q0010, was issued by the USDA Forest Service, CSA Southwest 7, to rehabilitate roofing systems at facilities within the Smokey Bear Ranger District in Ruidoso, New Mexico. The project requires the installation of Thermoplastic Polyolefin (TPO) roof recovery systems over existing metal and flat tar/built-up roofs, covering approximately 15,849 square feet, along with complete replacement of all gutters and downspouts with corrosion-resistant components. Work must accommodate existing rooftop solar panels through either coordination around them or temporary removal and reinstallation. The scope includes surface preparation, repair of deteriorated substrates, installation of recovery boards and insulation layers, fully adhered TPO membranes with heat-welded seams, and all necessary flashing details. The contract is structured as a firm-fixed price, total small business set-aside under NAICS code 238160, with awards governed by FAR 12.203, and will be made to the highest technically rated offeror whose price is deemed fair and reasonable and whose past performance is acceptable or neutral, with no tradeoffs permitted. The contractor must submit a detailed technical proposal within 10 pages, including a work plan, site-specific safety plan, sequencing of activities, resource availability, and evidence of site visitation, alongside a completed SF1442, price proposal, and bid guarantee in accordance with FAR 52.228-1. The project has a strict performance timeline requiring work to begin within 10 calendar days of the notice to proceed and be fully completed, including cleanup, within 160 calendar days after that notice, aligning with a designated period of performance from June 17, 2026, to January 1, 2027. All proposals must be submitted via email to Troy McCullough at [email hidden] no later than June 10, 2026, at 1:00 PM Central Daylight Time, with each document as a separate Adobe PDF and the solicitation number included in the subject line. The contractor is required to furnish performance and payment bonds, comply with OSHA and USDA Forest Service safety regulations, and adhere to prevailing wage requirements as defined in Attachment 5. Environmental and civil rights compliance is mandated under Title

General Info

Rehabilitation of USDA roofs with TPO systems, gutters replaced, bids due June 10, 2026.

NAICS

238160 - Roofing Contractors

Place of Performance

Ruidoso, NM, 88345, USA

Set-Aside

SBA

Documents

11

Additional Contractor Questions and Government Responses for Roofing Rehabilitation Project

DOCX, High priority: read this firstq-and-a
High

Amendment 00001 to Solicitation 127EAX26Q0010 - Site Visit Date Change

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation 127EAX26Q0010

PDF, High priority: read this firstamendment
High

Schedule of Items for Roof Rehabilitation TPO Recover Systems

XLSX, High priority: read this firstschedule-of-items
High

Solicitation 127EAX26Q0010 Roof Rehabilitation IFB

PDF, High priority: read this firstifb
High

USDA Forest Service Roof Rehabilitation SOW

DOCX, High priority: read this firstsow
High

Wage Determination NM20260021 for Lincoln County, NM Building Construction

PDF, High priority: read this firstwage-determination
High

Lincoln National Forest Area Map

PDF, Low priorityother
Low

Attachment+3+-+Compound+Map.pdf

PDF

Site+Visit+Attendance.pdf

PDF

Updated+Square+Footage.jpeg

JPG

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

4 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Notice updated

The notice description changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa Southwest 7 Usda-Fs
Contacts1 person available
OfficeAlbuquerque, NM, 871023498, USA
Office AddressAlbuquerque, NM, 871023498, USA
Contacts
Troy McCullough

Full Description

Show more

*******Solicitation is being cancelled due to material changes in the requirement.  This requirement will be re-posted inder a new solicitation when the requirement is updated******



***Amendment 0002 - Uploads all questions and answers and attaches site visit attendance roster and updated square footage.***


The objective of this project is to rehabilitate existing roofing systems at USDA Forest Service facilities by installing Thermoplastic Polyolefin (TPO) roof recover systems over existing metal and flat (tar/built-up) roofs, along with full replacement of gutters and downspouts.


Organized Site Visit:  ***CHANGE UNDER AMENDMENT 00001***
An organized site visit will be held on May 26th, 2026 at 10:00am Local time.  Location to meet for the site visit will be 901 Mechem Dr., Ruidoso, NM 88345.


Requests For Information (RFIs):
Questions shall be submitted via email to contact@example.gov and are due no later than June 1st, 2026, at 1:00 PM Central Daylight Time. This will ensure enough time to respond before the solicitation period ends. Please include the solicitation name and number as the subject line of the email.


Proposal Due Date:
All proposals shall be emailed to the Contract Specialist at contact@example.gov no later than June 10th, 2026, 1:00 PM Central Daylight Time.

More opportunities from Department Of Agriculture → Csa Southwest 7 Usda-Fs

Same awarding agency

NAICS: 236220
New
Federal
Chino Emergency Repairs
Solicitation # 127EAX27Q0011
Solicitation 127EAX27Q0011 is a firm fixed price contract issued by the US Forest Service for emergency storm damage repairs to three buildings in Chino Valley, Arizona. The scope of work includes comprehensive repairs to the Chino Yard Office, involving asbestos abatement, roof and siding replacement, and the installation of drywall, insulation, and gutters. Additionally, the project requires metal roof maintenance and window repairs for the Supervisor's Office and the Chino Shop. Optional bid items may include exterior painting of the Yard Office, weather stripping for the Chino Shop, and mold-related drywall replacement in the Supervisor's Office. The project must be completed within 60 calendar days of the notice to proceed, with a specified performance period from November 13, 2026, to February 26, 2027. This is a total small business set-aside under NAICS code 236220. Award will be based on the highest technically rated proposal that offers fair and reasonable pricing and acceptable past performance, requiring evidence of three similar projects completed within the last three years. Contractors must comply with the Davis-Bacon Act for wage determinations and adhere to strict EPA and OSHA regulations for asbestos removal. Technical submissions must be provided in three separate PDF documents, including a detailed work plan, key personnel summaries, and a performance schedule. All materials must be delivered in original packaging and meet specific ASTM and AWI standards, with final inspection and acceptance governed by FAR 52.246-12.
Commercial and Institutional Building Construction

POSTED

5 days ago

DEADLINE

in 13 days
View Details
NAICS: 237310
Federal
Jake Rocks Road Reconstruction
Solicitation # 127EAX27Q0003
Solicitation 127EAX27Q0003 is a Request for Quotation issued by the USDA Forest Service for the Jake Rocks Road Reconstruction project in the Bradford Ranger District of the Allegheny National Forest, located in Warren, Pennsylvania. This total small business set-aside under NAICS 237310 requires a contractor to provide all equipment, labor, and materials to rehabilitate approximately 2.97 miles of designated roads, specifically Forest Road 492 and 492A, as well as two recreational parking areas, two overlook parking areas, and two pull-off areas. The scope of work includes milling and overlaying asphalt, full depth replacement and spot repairs, culvert removal and installation, ditch work, guide rail replacement, the installation of erosion and sedimentation controls, and the construction of accessibility features. All work must adhere to FP-14 Standard Specifications, Forest Service Supplemental Specifications, and MUTCD standards for signage. The contract period of performance runs from November 2, 2026, to September 30, 2027, with a delivery requirement of 135 days after the notice to proceed. Award will be based on the lowest price technically acceptable criteria, evaluating the offeror's technical approach, performance schedule, and a record of three similar projects completed within the last three years. Proposals must be submitted as separate PDF files via email to the designated points of contact by October 26, 2026, at 1:00 PM Eastern Time. Required submission documents include a signed SF1442, a priced Schedule of Items, a technical proposal, and a bid guarantee. The project is subject to the Davis-Bacon Act and requires compliance with Buy American requirements and specific environmental protocols, including the cleaning of equipment to prevent the spread of invasive species on Forest Service lands.
Highway, Street, and Bridge Construction

POSTED

9 days ago

DEADLINE

in 1 day
View Details
NAICS: 236220
Federal
Barillas Peak & Encino Vista Lookout Tower Restoration, Santa Fe NF
Solicitation # 127EAX26Q0069
Solicitation 127EAX26Q0069 is a total small business set-aside request for quotation issued by the USDA Forest Service for a turnkey restoration of lookout towers within the Pecos Las Vegas and Coyote Ranger Districts of the Santa Fe National Forest. The base bid requires the design, removal, and replacement of the Barillas Peak Lookout Tower cab, including the installation of a new comprehensive lightning protection system and an off-grid solar power system with a backup generator. An optional bid item is available for the installation of a similar lightning protection and solar power system at the Encino Vista Lookout Tower. The project involves a five-phase design process, structural upgrades, and site civil work, with a total period of performance of 548 days after the notice to proceed. The acquisition is governed by FAR Part 12 for commercial items and requires compliance with the Davis-Bacon Act, Buy American requirements, and NFPA 70 and 780 standards for electrical and lightning protection. Offerors must provide a 20 percent bid bond and demonstrate technical competence through NEC and state-approved commercial electric certifications. Award will be based on best value, specifically the highest technically rated offeror with a fair and reasonable price and acceptable past performance. Following amendment 00001, the request for information due date is October 19, 2026, and the final quote submission deadline is November 6, 2026, at 2:00 PM Pacific Time.
Commercial and Institutional Building Construction

POSTED

20 days ago

DEADLINE

in 10 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS