LINE 33 FIBER OPTIC CABLE AND HARWARE INSTALLATION AND CONSTRUCTION SERVICES

Active
BCF270019LCState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Tri-County Metropolitan Transportation District of Oregon (TriMet) is seeking sealed bids from qualified firms for the Line 33 fiber optic cable and hardware installation and construction project. Interested bidders must be registered on the TriP$ eProcurement system to submit bids and receive addenda. A pre-bid meeting is scheduled for October 28, 2026, via WebEx, and the final deadline for bid submission is November 12, 2026, at 11:30 a.m. local time. To be considered, bidders must provide a bid bond, cashier's check, or certified check equal to 10 percent of the total bid price. Successful contractors are required to be licensed with the Oregon Construction Contractors Board and must provide 100 percent payment and performance bonds before starting work. As a public work project, this contract is subject to the Davis-Bacon Act and State of Oregon prevailing wage rates, requiring strict certification of compliance.

General Info

TriMet seeks bids for Line 33 fiber installation by November 12, 2026.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOregon → TriMet
Contacts1 person available
OfficeUSA
Organization / AgencyOregon → TriMet
Office AddressUSA
Contacts

Full Description

Show more
INVITATION TO BID (ITB)
CONSTRUCTION SERVICES FOR
LINE 33 FIBER OPTIC CABLE AND HARWARE INSTALLATION AND CONSTRUCTION SERVICES
1.    The Tri-County Metropolitan Transportation District of Oregon (TriMet) is soliciting sealed bids from qualified firms to provide construction services for Line 33 fiber optic cable and hardware installation as described herein (Project).
2.    TriMet will receive bids, via its eProcurement System (TriP$, powered by Bid Locker) until 11:30 a.m. (Local Time), on November 12, 2026, at which time bids will be publicly opened and read aloud in a virtual Teams Conference Room via (the phone number to call is 1-323-694-9781; and the meeting number access code is 535 230 175).
3.    Bidders must be registered on TriP$ at: https://bidlocker.us/a/trimet. In the event solicitation addenda are issued, only registered Bidders will be notified of the availability of Addenda for download. Acknowledgement of Addenda will be required.
4.    A Pre-Bid Meeting will be held on October 28, 2026, from 10:00 a.m. to 11:00 a.m., (Local Time), via WebEx. Potential bidders should contact Lisa Chow via email at chowl@trimet.org  to obtain the meeting link. Potential bidders shall limit attendance to a maximum of three (3) representatives. Attendees should sign-in via the meeting link no more than 5-minutes prior to the meeting’s start. Potential bidders are encourage to attend.
5.     Interested bidders are strongly encouraged to attend and will have the opportunity to review the work site and ask questions.
6.    TriMet requires one of the following with the bid: TriMet’s bid bond (see Section 4 - Bid Forms), a cashier’s check or a certified check for 10 percent of the bidder’s total bid price, or an irrevocable letter of credit issued by an insured institution as defined in ORS 706.008 for that amount.  If a bidder conditions the bid bond to provide for the possibility of payment of any amount less than 10 percent of the total bid price, the bid bond will not be accepted, and will cause the bid to be rejected as non-responsive. Bidders are advised to read Paragraph 00215 in the Bidding Requirements and Conditions Section of the General Provisions, entitled “Bid Security,” and to comply with the requirements of that Section.
7.    A 100% payment bond and a 100% performance bond on TriMet’s own bond forms will be required prior to beginning work. Contractors must be licensed with the Oregon Construction Contractors Board (CCB) in accordance with ORS 701.005 prior to submitting their bid and must file a public work bond with the CCB.
8.    This solicitation is for a public work subject to Davis-Bacon Act (40 U.S.C. 3141 et seq) and State of Oregon, Bureau of Labor and Industries (ORS 279C.800 – 279C.870) prevailing wage rates. Bidders must certify compliance with prevailing wage rate requirements as referenced in the Special Provisions and Exhibit A.
9.    All questions regarding this Invitation to Bid shall be directed to Lisa Chow, Senior Contracts Administrator, via email at chowl@trimet.org.
TRI-COUNTY METROPOLITAN TRANSPORTATION
DISTRICT OF OREGON
By:      Lisa Chow                                                                    Issue Date:  October 22, 2026
Senior Contracts Administrator
Procurement & Supply Chain Management

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
SLED
Underground Utility District 38 Overhead-to-Underground Service Conversions
Solicitation # CS 09-26-07
Alameda Municipal Power (AMP) is soliciting bids for the conversion of overhead electric facilities to underground service within Underground Utility District 38 in Alameda, California. The project focuses on modifying the routing and connection of existing electrical services while retaining existing customer-owned meter sockets and equipment where deemed safe by the City Building Division. The scope includes 195 standard conversions, the installation of over 8,000 linear feet of aluminum service conductors, and the use of approved raceway-intercept methods. The contract is subject to a Project Stabilization Agreement with the Building Construction Trades Council of Alameda County and requires adherence to California Department of Industrial Relations prevailing wage determinations. The contract will be awarded to the lowest responsible bidder, with local preference given to businesses within the City of Alameda. Bidders must provide bid security equal to 10 percent of the maximum bid amount and are required to furnish performance and payment bonds for 100 percent of the contract price. Key deliverables include a baseline schedule submitted within ten days of the Notice to Proceed and a Construction Service Plan for conversion methods. Payment is processed monthly via itemized applications for work performed, with undisputed amounts paid within 30 days. Final acceptance is contingent upon the correction of all punch list items and approval by the Public Utilities Board or the General Manager.
Engineering and Operations

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237130
New
SLED
Electric Capital Improvement Project South Oliver Line Rehabilitation Project
Solicitation # PE-66412-NONST-2027-000000019
The City of Elberton is soliciting bids for the Electric Capital Improvement Project South Oliver Line Rehabilitation Project, which involves the reconstruction of approximately 8,100 linear feet of three-phase primary electrical distribution line. The scope of work includes replacing existing utility poles, upgrading primary conductors to a larger size, and providing all necessary labor, equipment, and materials. The project area generally parallels State Highway 77 and Mineral Springs Road. All work must adhere to Electric Cities of Georgia distribution construction standards, the National Electrical Safety Code, and OSHA regulations 29 CFR 1926 Subpart V and 29 CFR 1910.269. The contract will be awarded to the apparent low bidder based on a firm fixed lump sum price, with specific unit prices required for potential additions or deletions to the work. Performance must begin within 45 calendar days of the Notice to Proceed and be completed within 180 calendar days. The project is subject to several federal requirements, including Davis-Bacon prevailing wages, the Build America, Buy America Act, and Title VI of the Civil Rights Act of 1964. Bidders must provide a 5 percent bid bond, and the successful contractor must furnish performance and payment bonds equal to 100 percent of the contract price. Additional requirements include the use of LCPtracker for payroll, E-Verify affidavits, and the submission of a site-specific safety plan.
City of Elberton

POSTED

about 23 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237130
New
SLED
Pre-Qualification for Upcoming Overhead Construction Bids - WA
Solicitation # 2026-88
Solicitation 2026-88 is a Request for Qualifications issued by SECO Energy to establish a pool of prequalified contractors for future Overhead Feeder Construction and New Feeder Install projects. This is a mandatory requalification process; any firm previously qualified with SECO Energy must resubmit their qualifications to be eligible for upcoming Requests for Proposals expected in October 2026. The general scope of work includes directional boring, underground excavation, installation of 4-inch conduit systems and duct banks, placement of 1000 MCM 25 kV EPR aluminum primary cable, and the installation of underground switchgear, splice boxes, and grounding systems, as well as right-of-way clearing and site restoration. To be deemed qualified, vendors must complete a comprehensive questionnaire covering company information, technical capabilities, and references from electric cooperatives or public utilities. Key requirements include the ability to provide a 10 percent bid bond and a 100 percent performance bond, as well as the submission of three years of safety records, including EMR ratings and OSHA 30A summaries. While projects will utilize Rural Utility Service funding and may require Davis-Bacon Act compliance, a lack of prior RUS experience is not an automatic disqualifier. Evaluation is based on the firm's risk management profile, including sam.gov registration and Dun and Bradstreet PAYDEX scores, and their demonstrated ability to perform similar utility construction activities.
Seco Energy

POSTED

2 days ago

DEADLINE

in 6 days
View Details
NAICS: 237130
New
Federal
Power Construction and Services II (PCS II) MATOC
Solicitation # W912BU26RA032
The US Army Corps of Engineers, Philadelphia District, is soliciting proposals for the Power Construction and Services II (PCS II) Multiple Award Task Order Contract (MATOC). This firm-fixed-price Indefinite Delivery/Indefinite Quantity (IDIQ) contract is designed to provide power construction and services in contingency or austere environments. The scope of work covers the United States Central Command (CENTCOM) Area of Responsibility and select European Command (EUCOM) countries, including Ukraine, Poland, Romania, Bulgaria, Kosovo, Bosnia, Norway, Turkey, Slovakia, and Greenland. The government intends to award between three and seven contracts to a pool of contractors with a total shared capacity not to exceed 249 million dollars. Each award will have a five-year term with a six-month option and a minimum guaranteed amount of 10,000 dollars. The contract encompasses single-source responsibility for the design, construction, and maintenance of low, medium, and high voltage electrical power plants and distribution systems. Services include assessing power needs, technical assistance, fueling, and conducting preventive and emergency maintenance. Proposals are evaluated using a best-value tradeoff process focusing on technical approach, past performance, and price. Submissions must be made electronically via the PIEE Solicitation Module by November 3, 2026, at 4:30 P.M. EST. Key compliance requirements include adherence to DFARS provisions regarding Russian fossil fuel business operations, CMMC cybersecurity standards, and specific host-nation compliance for projects in Turkey, Romania, and Poland.
W2SD Endist Philadelphia

POSTED

2 days ago

DEADLINE

in 10 days
View Details

More opportunities from Oregon → TriMet

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS