Log College Wastewater Treatment Plant Aeration Upgrade Project

Awarded
Warminster Municipal Authority, Bucks CountyState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
CP25014
Solicitation # CP25014
Solicitation CP25014 is a unit price contract issued by the Port of Lake Charles (Lake Charles Harbor & Terminal District) for the Industrial Park East Rail Extension and Trans-loading Yard project located in Calcasieu Parish, Louisiana. The scope of work requires the contractor to provide all labor, materials, equipment, and supplies necessary to complete the project according to best industry practices and contract specifications. Key deliverables include mobilization, clearing and grubbing of 10 acres, drainage excavation, structural fill embankment, lime treatment of 37,000 square yards, and the installation of 602 linear feet of barbed wire fencing and double swinging driveway gates. The contract will be awarded to the lowest qualified bidder who complies with all requirements. Bidders must submit proposals by November 19, 2026, using the Louisiana Uniform Public Work Bid Form, ensuring every requested item has a unit price. The successful bidder must provide performance and payment bonds from an approved or A-rated Louisiana domiciled insurance company. Project administration includes a bi-monthly schedule update requirement and a retainage policy of 10 percent for contracts up to 500,000 dollars and 5 percent for those exceeding that amount. Compliance with the Clean Air Act, Federal Water Pollution Control Act, and Equal Opportunity clauses is required, with specific attention to FEMA assistance for subcontracts exceeding 150,000 dollars. Inspection and acceptance are managed by the Department, utilizing DOTD standards for earthwork and the International Roughness Index for concrete pavement.
Port of Lake Charles

POSTED

about 3 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The Log College Wastewater Treatment Plant Aeration Upgrade Project, solicitation number 25-7, is a municipal construction contract issued by the Warminster Municipal Authority in Bucks County, Pennsylvania. The scope of work involves the demolition and removal of two existing aeration blowers, concrete equipment pads, air piping, and pipe supports within Blower Buildings 1 and 2. The contractor is responsible for furnishing and installing new concrete pads and discharge air piping, as well as the installation of four owner-supplied aeration blowers. While the owner provides the blower packages and electrical work, the contractor must ensure all installations meet technical specifications, including the use of flange by flange stainless steel piping. Bids are due by February 23, 2026, and will be awarded to the lowest responsible bidder. Submission requirements are stringent, requiring a Bid Form, Bidder’s Qualification Statement, electronic Bid Bond, Non-Collusion Affidavit, Public Works Verification Form, and a Contractor/Subcontractor Responsibility Certification Form. Compliance with the Pennsylvania Prevailing Wage Act and the Pennsylvania Public Works Employment Verification Act is mandatory for projects exceeding 25,000 dollars. Additionally, the project requires the use of journeyperson workers who have completed or are registered in a Class A Apprenticeship Program. The Authority reserves the right to hold bids for up to 60 days for qualification reviews and maintains the discretion to reject any bids or modify contract items.

General Info

Contract Value

$80,602

Place of Performance

Bucks County, PA, USA

Set-Aside

NONE

Award Issued Date

Documents

7

14035 Plan Set - Proposed Aeration Blower Submittal

PDF, High priority: read this firstspecifications
High

Addendum No. 1 - PFAS Water Treatment Project (Contract Nos. 26-4A, -B, -C, -D)

PDF, High priority: read this firstamendment
High

Addendum No. 2 - Contract Nos. 26-4A, -B, -C, -D (PFAS Water Treatment Project)

PDF, High priority: read this firstamendment
High

Contract No. 25-7: Log College Wastewater Treatment Plant Aeration Upgrade Project

PDF, High priority: read this firstifb
High

Warminster Municipal Authority PFAS Water Treatment Project (Contracts 26-4A, B, C, D)

PDF, High priority: read this firstrfp
High

Ref #14035 - Log College WWTP Aeration Upgrade Project Bid Tabulation

PDF, Low prioritybid-tabulation
Low

Contract Nos. 26-4A,-B,-C,-D ADDENDUM 3.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseAwarded
Posted

Solicitation

Notice updated

Response deadline changed from Feb 23, 2026 to Oct 27, 2026. The notice title changed. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Bucks County
ContactsNo contacts available
OfficeBucks County, PA, USA
Organization / AgencyPennsylvania → Bucks County
Office AddressBucks County, PA, USA
ContactsNo contact information available

Interested Companies (241)

Twining Construction
Ibew Local 98
Marona Construction

See All 241 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The major items of work to be performed under this Contract include the demolition and removal of two (2) Aeration Blowers, demolition of concrete equipment pads, air piping and pipe supports, the installation of four (4) owner-supplied Aeration Blowers, furnishing and installation of new concrete equipment pads, discharge air piping and other minor modifications in Blower Buildings 1 and 2 at the Authority’s Log College Wastewater Treatment Plant. Blower packages and electrical work to be supplied by owner.
Bids must be accompanied by a completed Bid Form, Bidder’s Qualification Statement, electronic copy of Bid Bond, executed Non-Collusion Affidavit, Public Works Verification Form, and fully executed Contractor/Subcontractor Responsibility Certification Form which certifies that the Contractor and Subcontractors meet the requirements of Warminster Municipal Authority’s Second Amended Responsible Contractor Resolution No. 24-1. As a result, journeyperson worker(s) who have successfully completed a Class A Apprenticeship Program or apprentices registered in such a program of the craft labor are required to construct the project. Prospective bidders are required to demonstrate these required qualifications with their bid. Failure to submit fully completed and executed Forms may be considered justification for rejection of the bid.
The bidder’s attention is called to the fact that the Pennsylvania Prevailing Wage Act and the Pennsylvania Public Works Employment Verification Act apply to this Contract if the estimated cost of the project is in excess of $25,000.
Award of Contract, if a contract be awarded, will be to the lowest responsible bidder, but the Authority reserves the unqualified right to reject any or all bids and to waive any informalities. The Authority also reserves the right to delete any “item” or portion of an “item” contained in the Contract at its discretion, once bids are received.
Prior to awarding the Contract, bids may be held by the Authority for a period not to exceed sixty (60) days from the date of the bid opening for the purpose of reviewing the bids and investigating the qualifications of bidders. During this period, no bid may be withdrawn.

More opportunities from Pennsylvania → Bucks County

Same awarding agency

NAICS: 238210
SLED
Emergency Back-Up Generator Replacement
Solicitation # Milford Township, Bucks County
Milford Township is soliciting sealed bids for a turnkey replacement of the emergency standby power system at the Municipal Building located at 2100 Krammes Road, Quakertown, Pennsylvania. The project involves the removal and disposal of an existing 60 kW generator and manual transfer equipment, the replacement of an undersized concrete pad with a new reinforced equipment pad, and the installation of a new 130 kW diesel-fueled standby generator. The scope includes a new 400-amp automatic transfer switch, consolidated utility service entrance equipment, all necessary electrical work, and a full initial fill of ultra-low sulfur diesel fuel. The installation must meet NFPA 110 level 2 compliance or greater and be EPA-certified for stationary use. Bids must be submitted online via PennBid by October 30, 2026, at 9:00 a.m. using forms provided by the Township. Required submission documents include a non-collusion affidavit, a 10% bid bond or certified check, and 100% performance and payment bonds. Qualified bidders must demonstrate experience with comparable industrial or governmental installations and identify a factory-authorized service organization for warranty and emergency support. The award will be based on a single lump-sum turnkey price. Final acceptance is contingent upon a successful two-hour resistive load-bank test and the delivery of closeout documents, including as-built electrical diagrams and a minimum two-year manufacturer's warranty.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

10 days ago

DEADLINE

in about 20 hours
View Details
NAICS: 237110
SLED
Langhorne Manor Borough CCTV Inspection of Sewer System - Contract #LMB-1
Solicitation # LMB-1
Langhorne Manor Borough is soliciting sealed bids for Contract LMB-1, which involves the televideo inspection of approximately 33,000 lineal feet of sanitary sewers in Bucks County, Pennsylvania. The scope of work includes panning up at each lateral to witness active flow and all associated activities. Bids must be submitted electronically via PennBid by 1:00 P.M. on Tuesday, November 3, 2026. Each submission must include a bid bond or certified check for 10 percent of the bid price, and bids cannot be withdrawn within 60 days of the opening. The contract is based on a stipulated price and will be awarded to the bidder deemed to be in the best interests of the project based on compliance, qualifications, and financial ability. The project is managed by Carroll Engineering Corporation, with a substantial completion timeline revised to 120 days per Addendum No. 1. Key requirements include the submission of certified record drawings at closeout and adherence to PADEP and PennDOT standards for erosion and sedimentation control. The successful contractor must provide performance and payment bonds, comply with the Pennsylvania Prevailing Wage Act, and verify employee eligibility through the federal E-Verify Program. Payment is processed monthly via applications for payment submitted to the engineer for review. Additional technical guidance is provided through sewer TV plans and record drawings dating back to 1976.
Water and Sewer Line and Related Structures Construction

POSTED

15 days ago

DEADLINE

in 5 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS