Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Logging Road Construction and Infrastructure

Active
International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Documents

This scope was carved out of RFP26-12.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFP26-12 Harvesting of Timber on DL1661

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyProvince of British Columbia → District of Fort St James
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Constructs and maintains access roads and landings for prime contractors on District (British Columbia) forestry projects. Performs road grading, culvert installation, and landing stabilization using excavators, graders, and dozers. Requires adherence to PNG guidelines for roadwork near pipelines. Delivers functional access roads and landings capable of supporting heavy hauling equipment.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Idylwood Avenue at East Main Street Intersection Improvements
Solicitation # 8923
The City of Waterbury, Connecticut, is soliciting proposals for the Idylwood Avenue at East Main Street Intersection Improvements project. The primary objective is to realign and simplify the intersection to enhance driver understanding and overall safety. The scope of work includes upgrading pavement markings on East Main Street, adding dedicated turning lanes, reducing lane widths, and improving traffic signal design. Additionally, the project requires the reconstruction of Idylwood Avenue, involving milling and overlaying the first 120 feet and full-depth reconstruction of the final 35 feet, as well as extending the sidewalk. All work must adhere to Form 819 Standard Specifications for Roads, Bridges, Facilities and Incidental Construction. Prospective bidders must attend a mandatory on-site information session on October 13, 2026, at 10 AM to remain eligible for submission. Proposals are due by October 27, 2026, at 3:30 PM and must be submitted to the Director of Purchasing. The project has an anticipated state funding amount of $248,400.00 and includes specific SBE and MBE goals of 29.39% and 15.51%, respectively. For contracts exceeding $50,000.00, a 10% proposal security is required, along with 100% performance and payment bonds upon award. Evaluation will be based on the quality and responsiveness of the proposal, the proposer's qualifications and financial resources, and the ability to meet the required timeline. State of Connecticut prevailing wage rates and ADA compliance are mandatory.
DAS Procurement

POSTED

3 days ago

DEADLINE

in 22 days
View Details
NAICS: 237310
New
SLED
DODGE COUNTY FY 2027 LMIG PROJECTS
Solicitation # PE-64500-NONST-2027-000000020
The Dodge County Board of Commissioners is soliciting sealed bids for the FY 2027 LMIG Project, which involves road improvements across 10 county roads in Georgia. The scope of work includes traffic control, asphalt deep patching, asphalt leveling, bituminous tack coat, 9.5 mm asphalt resurfacing, 19 mm binder course, shoulder building, grassing, and restriping. Work is specifically designated for several locations, including 23rd, 24th, 25th, and 26th Avenues, as well as West Chicken Road, Amanda Drive, Saunders Drive, Pine Road, Kelly Farm Road, and Free Gift Church Road. All materials and workmanship must adhere to the latest GDOT Standard Specifications and the current Manual on Uniform Traffic Control Devices (MUTCD). Bids must be submitted in sealed envelopes to the Dodge County Board of Commissioners office in Eastman, Georgia, no later than 2:00 p.m. on Monday, November 2, 2026. Submissions must include a 5% bid bond and be signed by an authorized representative. The selected contractor will be required to provide a performance and payment bond for 100% of the contract price and a general liability insurance certificate with a combined single limit of $2,000,000 per occurrence. Once the notice to proceed is issued, work must commence within 10 days and be completed within six months. Dodge County will retain 10% of progress payments until final acceptance of the project.
Dodge County Board of Commissioners

POSTED

3 days ago

DEADLINE

in 28 days
View Details

More opportunities from Province of British Columbia → District of Fort St James

Same awarding agency

NAICS: 237110
New
International
RFP 26-13 Waterline and Curb Stop Upgrades project
Solicitation # 234620
The District of Fort St. James is soliciting proposals for the Waterline and Curb Stop Upgrades project, which involves the replacement of water service lines and associated infrastructure in British Columbia. The scope of work spans two years, with 2027 activities scheduled between May 1st and August 1st. Key deliverables include the replacement of 170 water service lines, 11 hydrants and 5 hydrant valves, and 86 sanitary sewer pipe connections across 2027 and 2028. The District will supply all primary materials, including pipes, valves, and aggregates, while the successful proponent is responsible for on-site hauling of materials and the disposal of old components. To ensure quality control, a site Superintendent or Project Manager must be present for the duration of the project, and water disruptions are strictly limited to the hours of 9:00 am and 3:00 pm. Proposals must be submitted in English by October 30, 2026, and must include a signed Submission Declaration, the completed Proposal Response Form, and proof of liability insurance and WCB/WorkSafe coverage. Mandatory criteria for consideration include meeting the minimum specifications in Appendix C and providing evidence of relevant experience and qualifications. The contract will be awarded to the proponent who meets all mandatory requirements and achieves the highest overall ranking, with reference checks conducted on a pass-fail basis. Invoicing for the project must be submitted based on actual quantities performed.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 25 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS