Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Missouri was posted on July 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Logistics and Delivery to Blue River Campus, Missouri

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves the final-mile logistics and secure delivery of radios and associated accessories to the Blue River campus in Missouri, with a strong emphasis on handling high-value electronic equipment under strict security protocols. All shipments must be tracked end-to-end to ensure accountability, prevent loss or damage, and confirm timely arrival at the designated location. The work is classified as a subcontract and falls under NAICS code 484220, indicating specialized freight transportation services for specialized cargo. The solicitation was posted on July 22, 2026, with proposals due by August 12, 2026, at 5:00 PM. The contracting entity is Metropolitan Community College in Missouri, though no specific office address or point of contact details are provided. Deliveries must be coordinated to comply with campus access procedures and security requirements unique to the Blue River campus, ensuring that sensitive communications equipment is received by authorized personnel in pristine condition.

General Info

Secure final-mile delivery of high-value radios to Blue River campus, with end-to-end tracking and strict security protocols.

Agency

Missouri → Metropolitan Community CollegeView Agency

NAICS

484220 - Specialized Freight (except Used Goods) Trucking, LocalView NAICS

Place of Performance

MO, USA

Set-Aside

NONE

Documents

This scope was carved out of 27-7753.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Fire Dept Portable Radios

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMissouri → Metropolitan Community College
ContactsNo contacts available
OfficeN/A
Organization / Agency
Missouri → Metropolitan Community College
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Final-mile delivery of radios and accessories to the Blue River campus, requiring secure handling and tracking of high-value electronic equipment.

More opportunities from Missouri → Metropolitan Community College

Same awarding agency

NAICS: 339113
New
SLED
3-AXIS CNC Mill - RESUBMITTED
Solicitation # 1011-27
Metropolitan Community College is soliciting bids for the purchase and installation of one new, unused 3-axis CNC mill for the Penn Valley Advanced Technical Skills Institute. The acquisition aims to standardize classroom machinery to improve instructional efficiency and align with industry standards, specifically focusing on lights-out manufacturing and machine tending. The selected machine must include automation packages for future robotics integration and meet strict technical specifications, including a minimum work envelope of 30.0 by 17.5 by 17.5 inches, a 15,000 RPM CAT 40 Big+ dual contact spindle, a minimum 32-tool changer, and Renishaw Set and Inspect software. The vendor is responsible for providing the machine, freight, rigging, installation by qualified technicians, and on-site training, with a final delivery and installation deadline of March 15, 2027. The contract will be awarded on an all-or-nothing basis to the lowest bidder who complies with all bidding conditions, with evaluation factors including the bidder's prior experience, financial status, and proposed subcontractors. Required submissions include a variety of affidavits, including non-collusion and E-Verify certifications, as well as M/WBE participation forms. The machine must be fully enclosed and safety interlocked in compliance with OSHA guidelines and include a two-year warranty and a 15,000 dollar Kennametal manufacturer tooling certificate. Payment is contingent upon the receipt and acceptance of the equipment, and the college reserves the right to cancel the contract with 30 days notice if adequate appropriations are not received.
Surgical Appliance and Supplies Manufacturing

POSTED

4 days ago

DEADLINE

in 17 days
View Details
NAICS: 333517
New
SLED
Vertical Machining Center
Solicitation # 1010-27
Metropolitan Community College is soliciting bids for the one-time purchase and installation of a new Okuma M460-VE Vertical Machining Center equipped with a robotic machine tending system. This acquisition is intended for the CIMM department to emulate modern machine shop environments and expand offerings to the business community through advanced robot automation and part loading. The scope of work requires the successful bidder to provide all labor, engineering, programming, hardware, and training necessary to deliver a fully functional, production-ready automation solution. All products must be delivered and installed by March 15, 2027, with goods shipped FOB Destination. Bidders must have at least five years of experience providing similar products and will be evaluated based on technical capability, proposed solutions, support capabilities, and overall value to the organization. While the contract may be awarded to the lowest bidder complying with all conditions, the college reserves the right to award based on the best interest of the organization. Required submissions include a detailed price breakdown, product warranty and return policies, and compliance with E-Verify and non-discrimination statutes. Preference will be given to materials and products manufactured in the state of Missouri. Bids are due by September 28, 2026, via the Public Purchase platform.
Machine Tool Manufacturing

POSTED

4 days ago

DEADLINE

in 16 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS