Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Logistics and In-Country Delivery Coordination (Japan)

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of Defense → Navsup Flt Logistics Ctr YokosukaView Agency

NAICS

488510 - Freight Transportation ArrangementView NAICS

Place of Performance

SASEBO, JP-42, JPN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Flt Logistics Ctr Yokosuka
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → Navsup Flt Logistics Ctr Yokosuka
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Coordinate final delivery to Sasebo, Japan including customs clearance, local transport, and FOB Destination compliance.

Similar Contracts

Same NAICS industry code

NAICS: 488510
New
Federal
Battery Energy Storage System (BESS) RelocationThe contract solicitation W50S8D26QA015, titled Battery Energy Storage System (BESS) Relocation, is a first-time requirement with no incumbent contractor and is set aside entirely for small businesses under FAR 19.5. The scope involves relocating a single Generac Model SBE500 BESS unit weighing 27,062 pounds from a contractor-owned storage lot near Dover Air Force Base, Delaware, to Hangar 101 at Stewart Air National Guard Base in Newburgh, New York, with a firm performance period from August 17 to September 30, 2026. The contractor is solely responsible for all aspects of the move, including visual inspection and documentation of the unit’s condition before and after transport, secure loading and offloading using contractor-provided equipment, and placement on dunnage to protect the ground surface—no government-provided cranes, forklifts, or lifting devices will be available. The contractor must also ensure compliance with UN 38.3 transport standards and provide supporting documentation including the Safety Data Sheet and emergency response information, all while adhering to Wage Determination 2015-4159, Revision 32, for labor compensation. Packaging, preservation, and marking are not prescribed by the government, leaving the contractor to determine appropriate methods capable of supporting the load and safeguarding the lithium-ion battery system during transit, with an implied expectation of adherence to DOT and IATA hazard communication standards. Proposals must be submitted via email to Kevin Fenner by August 6, 2026, and are evaluated against the detailed requirements in the attached Performance Work Statement and technical exhibits including the BESS image and manufacturer spec sheets. The place of performance is officially listed as Newburgh, NY, with no CLINs or pricing structure provided, meaning contractors must propose complete pricing for the full scope without government-furnished cost estimates. Payment details, accounting codes, invoicing procedures, and formal evaluation factors are not specified, and no COR, COTR, or PCO is named, though Kevin Fenner serves as the primary point of contact for all submissions and inquiries.
W7NR Uspfo Activity Nyang 105

POSTED

about 24 hours ago

DEADLINE

in 9 days
View Details

More opportunities from Department Of Defense → Navsup Flt Logistics Ctr Yokosuka

Same awarding agency

NAICS: 336611
New
Federal
USS SHOUP (DDG-86) 7C1 SRA BUNDLE-2The contract is for the ship repair, maintenance, and overhaul of the USS SHOUP (DDG-86) under a Surface Restricted Availability (SRA) at Commander, Fleet Activities Yokosuka in Japan, with a fixed-period performance from March 22, 2027, to August 31, 2027. The scope encompasses fifteen distinct Task Group Instructions (TGIs) focused on repair, preservation, and replacement work primarily targeting onboard tanks and critical structural components, including potable water tanks, lubricating oil sump tanks, GTM exhaust ducts, corrosion-damaged areas, FOD screens, and radome mounting surfaces. The contractor is responsible for providing full labor, equipment, materials, supervision, coordination, and management of subcontractors, as well as implementing robust quality control, quality assurance, safety, and environmental management systems. A Growth CLIN will be utilized to accommodate anticipated additional work through a Growth Management Request process, ensuring flexibility for evolving requirements. To qualify, offerors must hold an active U.S. Navy Master Ship Repair Agreement (MSRA) or Agreement for Boat Repair (ABR) and be duly authorized to conduct business in Japan under DFARS 252.225-7042. Compliance with hazardous material reporting under FAR 52.223-3 and sea transportation declarations under DFARS 252.247-7023 is mandatory during proposal submission. Access to technical drawings and proposal breakdowns requires a prior request via DoD SAFE and submission of a drop-off request to specified Navy email addresses by August 13, 2026. Proposals must be submitted electronically through SAM.gov no later than August 20, 2026, at 10:00 AM Japan Standard Time, and no socio-economic set-asides will apply. The contract type is Firm-Fixed-Price, and award will be based on the Government’s determination of technical acceptability and price without disclosed evaluation weights. The contracting officer is Peter Jommel Arrieta, with Miwa Takahashi serving as the Contract Specialist, and all work must comply with U.S. Navy standards and oversight conducted at the performance location. No packaging, preservation, or marking standards are specified, and only MSRA/ABR authorization serves as the mandatory eligibility criterion, with no additional representations, certifications, or security clearance requirements referenced.
Ship Building and Repairing

POSTED

about 24 hours ago

DEADLINE

in 23 days
View Details
NAICS: 336611
New
Federal
USS RUSHMORE (LSD-47) 7C1 SRA 52pkgThe contract amendment revises the Production Completion Date for all 52 Item Control Numbers across the requirement package for the USS RUSHMORE (LSD-47) 7C1 SRA project, with updated specifications and attachments accessible via DoD SAFE. Section C has been modified to include enhanced guidance on Schedule Management and Milestone PW42 Reporting, while Section J has been updated to replace Attachment (1) with the revised SRF-JRMC Det. Sasebo Work Specifications covering all 52 ICNs and Attachment (5) with its revised version labeled RUS 7C1 SRA PERL (Rev. 1). Proposals must be submitted electronically by 10:00 hrs on July 29, 2026, to the designated point of contact, with submission via DoD SAFE permitted only if file sizes exceed email limitations. The contract is firm-fixed-price, with evaluation based on Technical acceptability as a gate, followed by Past Performance and Price, where trade-offs may lead to selection of a higher-priced or lower-rated offeror if overall value is superior. Performance is to occur at Sasebo Naval Base, Japan, with a period of performance from October 12, 2026, to July 31, 2027, and delivery governed by F.O.B. Destination terms. Contract administration requires invoicing through WAWF with the Invoice 2in1 document type, and payment routing is handled via designated DoDAACs. Quality and inspection standards include ISO 9001:2015 and NAVSEA 009-04, with contractor responsibility to provide Test and Inspection Plans and Objective Quality Evidence, and to notify the Government 24 hours in advance of inspections. Packaging and marking must comply fully with MIL-STD-129 and MIL-STD-130, including Unique Item Identifier (UII) encoding via Data Matrix symbols following ISO/IEC 15434 and ANSI MH10.8.2 standards. Special requirements mandate compliance with 29 CFR 1915 for shipyard safety, mandatory extension of commercial warranties at no additional cost, and strict limitation on dissemination of Controlled Unclassified Information to authorized Navy and DoD personnel only. All offerors must complete mandatory representations and certifications, including those related to executive compensation, prohibited payments, and covered telecommunications equipment, though no completed submissions are contained within the provided documentation.
Ship Building and Repairing

POSTED

about 24 hours ago

DEADLINE

in 6 days
View Details
NAICS: 336611
New
Federal
6A1 Preventive Maintenance for Puget Sound Naval Shipyard (PSNS)Barge YR-85 and YR-95This solicitation, numbered N6264926RA054, is for preventive maintenance on the Puget Sound Naval Shipyard barges YR-85 and YR-95, to be performed at Yokosuka Naval Base in Japan under a firm fixed price job order issued under an existing Master Agreement for Repair and Alteration of Vessels (MARAV), specifically requiring offerors to hold an active Master Ship Repair Agreement (MSRA) or Agreement for Boat Repair (ABR) with the U.S. Navy. Only vendors currently certified under one of these agreements are eligible; those without an active MSRA or ABR must apply well in advance as certification can take up to a year. Offerors must be authorized to operate and conduct business in Japan as mandated by DFARS 252.225-7042 and must be registered in the System for Award Management (SAM.gov) with all representations and certifications current, including compliance with FAR clauses 52.204-7 and 52.215-1 under deviation 2026-O0038. The work performance period is from 15 August 2026 to 15 October 2026, aligned with the overall contract period of 1 September 2026 to 30 October 2026, and the full scope of required tasks is detailed in Attachment I, accessible only through DoD SAFE after a formal request submitted by 31 July 2026. Proposals must be submitted by 10 August 2026 in English, using the SF-33 form with completed Sections K and attachment II, along with attachments III, V, and other required documents, all in formats compatible with Microsoft Office 2016 or Adobe Reader 2017. The selection process follows a Lowest Price Technically Acceptable (LPTA) model, where proposals must pass all mandatory gates—technical acceptability, past performance, responsibility per FAR 9.104, and fair and reasonable pricing—to be considered; no tradeoffs will be made for higher-priced, technically superior bids. The successful contractor must adhere to stringent quality standards including NAVSEA Standard Item 009-04, implement a Government-approved Quality Assurance Surveillance Plan, submit Condition Found Reports electronically within 24 hours of discovery, and meet all occupational safety requirements under 29 CFR 1
Ship Building and Repairing

POSTED

2 days ago

DEADLINE

in 13 days
View Details
NAICS: 541512
New
Federal
IT Security and Data Safeguarding ComplianceThe contract requires full compliance with Department of Defense safeguarding standards for contractor information systems, focusing on the protection of sensitive data and the secure operation of software and connected systems. All work must align with DoD cybersecurity requirements to ensure that information systems handling sensitive or controlled unclassified information meet rigorous security controls, including access management, encryption, audit logging, and vulnerability mitigation. The effort is specifically tied to operations at Yokosuka, Japan, and is structured as a subcontract under the NAICS code 541512 for computer systems design services. Submission must be completed by the deadline of August 3, 2026, with performance expected to support the Naval Supply Systems Command Fleet Logistics Center Yokosuka, a Department of Defense entity. While the solicitation does not specify a set-aside category or point of contact, the location of performance and the nature of the work indicate a critical need for secure, locally executed IT infrastructure management that adheres to strict federal defense protocols. Noncompliance with DoD safeguarding standards will constitute a material breach, and the successful offeror must demonstrate proven capability in implementing and maintaining compliant systems in a military operational environment.
Computer Systems Design Services

POSTED

4 days ago

DEADLINE

in 6 days
View Details