This Solicitation opportunity from California was posted on August 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The City of Lompoc has issued Request for Proposal No. 3077 for the Lompoc Library HVAC Units Replacement Project. This public works project involves the removal of existing HVAC equipment and the installation of new rooftop and basement heating and cooling systems, including all related ductwork, electrical components, controls, testing, commissioning, and training. The project is funded by the Building Forward Library Facilities Improvement grant and city improvement funds, with a required completion timeline of 90 days from the Notice to Proceed. Bids are due by September 4, 2026, at 2:00 pm.
Qualified bidders must submit a comprehensive package including a technical proposal detailing methodology and staffing, a financial proposal with itemized costs, and a total bid price. Mandatory compliance documentation includes a bid bond, performance and labor/materials bonds, a non-collusion affidavit, conflict-of-interest disclosure, and proof of California contractor licensing. Because this is a public works project, contractors must adhere to California prevailing wage laws and provide certified payroll records. Submissions require two hard copies and an electronic upload via OpenGov. Evaluation will be based on the technical approach, bidder references, and total cost.
General Info
City of Lompoc seeks HVAC replacement proposals for Lompoc Library by September 4, 2026.
HighAI Summary for A-100 M-3 Tower Plant Picture: Technical drawing sheet titled "Tower Plant Picture" for A-100 M-3. Includes tower and front elevations at 1:20 scale, references, notes, annotations, and chamber dimension labels A through P. The document appears to provide design and layout details rather than solicitation or award information.
PDF
PDF, High priority: read this first2 pages · wage-determination
HighAI Summary for B Attachment - Public Work Prevailing Wage Job: This document is an attachment related to a public works project under the City of Lompoc, specifying prevailing wage requirements for contractors and subcontractors. It references compliance with California Labor Code Sections 1720 et seq., including registration with the Department of Industrial Relations (DIR) and submission of certified payroll records. The document outlines wage payment obligations, labor classifications, and recordkeeping requirements for public works contracts exceeding $1,000. It also includes a section for listing subcontractors and requires contractor acknowledgment of prevailing wage laws and insurance provisions. The document serves as a binding agreement to comply with prevailing wage laws and is intended to be completed and returned by contractors.
PDF
PDF, High priority: read this first1 page · bid-bond
HighAI Summary for Bid Bond for City of Lompoc 2026: This bid bond document for the City of Lompoc, dated 2026, serves as a financial guarantee from the Principal and Surety to the City. It obligates the Surety to pay 10% of the aggregate bid amount if the Principal fails to enter into the contract or provide required bonds within 30 days of award. The bond ensures compliance with the bid and contract terms, including furnishing materials per specifications. It requires notarized signatures and corporate seals from both Principal and Surety, with an attached power of attorney for the attorney-in-fact.
DOCX
DOCX, High priority: read this first2 pages · checklist
HighAI Summary for Bid Submission Checklist for Public Works Project: This Bid Submission Checklist outlines all required documents and forms bidders must submit for a public works procurement. It includes instructions for submitting hard copies and electronic uploads, and lists essential items such as bidder information, total bid price, conflict of interest disclosure, non-collusion affidavit, financial proposal, bid bond, licenses, prevailing wage documentation, references, insurance, technical proposal, and addenda acknowledgments. Additional documents like commercial registration, classification certificates, safety programs, bonding, and workers' compensation certificates may also be required. The checklist ensures compliance with submission requirements and supports evaluation of bids.
PDF
PDF, High priority: read this first1 page · bid-price-form
HighAI Summary for City of Lompoc Total Bid Price Form: This document is the City of Lompoc's Total Bid Price form for a procurement. It requires bidders to provide the total bid price including all labor, materials, services, insurance, equipment, and incidentals. The form also requests the bid amount spelled out in words, proposed start and completion dates, warranty period, and any discount offered for early payment. This single-page form is essential for submitting a complete bid package.
DOCX
DOCX, High priority: read this first1 page · specifications
HighAI Summary for Indemnity and Insurance Requirements: Indemnity and Insurance Requirements document addressing required contractor indemnification and insurance coverage provisions. The file appears to be a requirements/specifications attachment rather than a solicitation or award document. It likely outlines insurance limits, liability expectations, and related compliance obligations for contract performance. The content provided is largely a logo/image with no readable text beyond the filename, so the document is identified based on the title and procurement context.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Library Print A-100 E-3 Floor Power Plans: A plan index or schedule page from Library_Print:_A-100_E-3.pdf listing floor power and communications plan sheets, floor power plan sheets, and designated areas (A through J). The content appears to be a drawing or plan reference sheet rather than a solicitation or contract award. No date, version, submission instructions, or pricing information is shown.
PDF
PDF, High priority: read this first5 pages · special-notice
HighAI Summary for P-07-22 EO N-6-22 Russia Sanctions Additional Guidance Bulletin: This document, dated June 21, 2022, is a Broadcast Bulletin and 3rd Joint Memo providing additional guidance on Executive Order N-6-22 issued March 4, 2022, regarding economic sanctions against Russia. It instructs California state agencies to incorporate specific contract and solicitation language to comply with EO paragraphs #2 and #6, which mandate termination of contracts with sanctioned entities and prohibition of new contracts with such entities. The bulletin updates general provisions for IT and non-IT contracts and provides procedural guidance for implementation, including legal consultation and record-keeping. It is intended for procurement and contracting officers to ensure compliance with state and federal sanctions in future agreements and solicitations.
PDF
PDF, High priority: read this first14 pages · construction-drawings
HighAI Summary for Public Library HVAC Retrofit Project - Final Construction Documents: Final construction documents for the Public Library HVAC Retrofit Project at 501 East North Avenue, City of Lompoc, City Project No. FY-10-LB-1. The file includes cover and schedule of drawings, special inspection requirements, record drawing certification, city approvals, consultant and code references, project location maps, general notes, and multiple architectural/mechanical/electrical plan sheets and details. It appears to be a set of design/construction drawings rather than a solicitation.
PDF
PDF, High priority: read this first29 pages · rfp
HighAI Summary for RFP NO. 3077 Lompoc Library HVAC Units Replacement Project: This Request for Proposal (RFP NO. 3077) issued by the City of Lompoc solicits bids for the replacement of HVAC units at the Lompoc Public Library. The document, dated for a bid closing on September 4, 2026, outlines the project scope including removal of existing HVAC equipment and installation of new rooftop and basement heating and cooling systems. It specifies contractor responsibilities such as procurement, installation, testing, and training, with a completion timeline of 90 days from the Notice to Proceed. The project is funded by the Building Forward Library Facilities Improvement grant and subject to state and federal regulations. The RFP includes submission instructions, contact information, and emphasizes compliance with specifications and safety standards.
PDF
PDF, High priority: read this first29 pages · rfp
HighAI Summary for RFP No. 3077 - Lompoc Library HVAC Units Replacement Project: Request for Proposal No. 3077 issued by the City of Lompoc for the Lompoc Library HVAC Units Replacement Project, with bid closing on September 4, 2026 at 2:00 pm. The document provides submission instructions, contact rules, question deadline, project background, scope of work, and performance requirements. Work includes removal of existing HVAC equipment and furnishing/installing new rooftop and basement heating and cooling systems, related duct, electrical, controls, testing, TAB, commissioning, training, and all incidental work. The project is funded by grant and city improvement funds and is subject to state and federal requirements.
PDF
PDF, Low priority1 page · bidder-references
LowAI Summary for Bidder References Form: This document is a Bidder References form intended for bidders to list and describe their last three contracts that demonstrate their ability to provide the supplies, equipment, or services relevant to the proposal specifications. It includes fields for customer name, address, contact individual, phone number, email, contract amount, year, and description of services provided. The City reserves the right to contact the references for additional information regarding the firm's qualifications.
PDF
PDF, Low priority2 pages · other
LowAI Summary for City of Lompoc Contractor's License and Subcontractor Designation Form: This document is a Contractor's License and Subcontractor Designation form for the City of Lompoc. It requires bidders to provide their valid California Contractor's License details, company information, and subcontractor designations. The form includes indemnification language and instructions for submitting with bids. It serves as a compliance and administrative attachment rather than a primary solicitation or technical specification.
LowAI Summary for City of Lompoc No Conflict-of-Interest Declaration Form: This document is the City of Lompoc's No Conflict-of-Interest Declaration Form. It requires individuals to declare that they have no financial, personal, or other interests that could be perceived as conflicts of interest related to their professional duties. The form includes statements confirming no direct or indirect financial interests, no compromising personal relationships, and a commitment to disclose future conflicts. It references City ordinance § 3.36.080 regarding employee participation in procurement processes. The form requires a wet signature and includes contact information for the Purchasing Department.
PDF
PDF, Low priority1 page · contractors-affidavit
LowAI Summary for Contractors Affidavit for City of Lompoc Bid Submission: This Contractors Affidavit certifies that the bid submitted is genuine, not collusive, and made without any undisclosed agreements or attempts to fix prices. It requires an original signature from an authorized representative to validate the bid for the City of Lompoc. The affidavit confirms compliance with ethical bidding practices and agreement to all terms in the invitation document.
PDF
PDF, Low priorityother
LowAI Summary for KODAK Safety Film Inspection Received: Unreadable non-procurement document titled "KODAK SAFETY FILM" with repeated inspection/received markings and alphabetized open/closed entries. No solicitation, contract, SOW, award, or procurement instructions are evident. Treated as an unrelated or archival form/image document.
PDF
PDF, Low priority1 page · bond
LowAI Summary for Labor and Materials Bond for City of Lompoc Contract 2025: This document is a Labor and Materials Bond associated with a contract awarded by the City of Lompoc, California, in 2025. It binds the Principal and Surety to pay for labor and materials under the contract referenced by an Invitation to RFP number. The bond ensures payment to laborers, subcontractors, and compliance with California's Unemployment Insurance Code. It includes provisions waiving notice of contract changes and stipulates attorney's fees if suit is brought on the bond. The document is signed and sealed in 2025.
PDF
PDF, Low priorityother
LowAI Summary for Library_Print A-100 E-1: Unreadable document.
PDF
PDF, Low priority1 page · affidavit
LowAI Summary for Non-Collusion Affidavit for City of Lompoc Solicitation: This Non-Collusion Affidavit is addressed to the City of Lompoc Purchasing Department. It is a sworn statement by an authorized representative of a bidding company affirming that the bid submitted is genuine and not collusive. The affidavit declares no collusion, conspiracy, or agreement with other bidders to submit sham bids or restrain competition, and that no fees or considerations were exchanged for such purposes. It includes spaces for company and project details, signature, and notarization. The document supports procurement integrity but does not contain solicitation or technical details.
PDF
PDF, Low priority1 page · performance-bond
LowAI Summary for Performance Bond for City of Lompoc Contract 2026: This document is a Performance Bond related to a contract awarded by the City Council of the City of Lompoc, California, in 2026. It binds the Principal and Surety to ensure faithful performance of the contract as per the terms and conditions specified. The bond guarantees indemnification and holds the City harmless against any failure to perform. It includes provisions for changes or extensions to the contract without affecting the bond obligations. The document requires proper execution and acknowledgment by the Principal and Surety.
PDF
PDF, Low priority1 page · other
LowAI Summary for Registered Proposer Information Sheet for RFP: This document is a Registered Proposer Information Sheet associated with a Request for Proposal (RFP). It is a form intended for bidders to provide company and contact information, including attendance confirmation for a mandatory pre-bid job walk. The document includes instructions for submission via fax or email and contact details for the City of Lompoc purchasing office. No specific solicitation number or dates are filled in.
PDF
PDF, Low priorityother
LowAI Summary for Reznor HVU-3 Unit Pictures: Unreadable or non-procurement document content. The file appears to contain only a product/unit label ('HVU-3 REZNOR') and no procurement terms, solicitation details, or contractual information.
PDF
PDF, Low priorityother
LowAI Summary for S223091 York Diamond 80 unit photo page: Document appears to be a product/asset photo page for a York Diamond 80 heater/air handling unit. It includes safety warnings, an order number S223091, model number PAHU202L10401A, serial number WMLM046898, and indicates Unit 1 of 75 with an accepted mark. No procurement solicitation or contract terms are present.
The City of Lompoc is located where California Hwy 1 and Hwy 246 meet: Fifty-five miles Northwest of Santa Barbara and ten miles Southeast of Vandenberg Air Force Base. Rolling hills surround the Lompoc Valley in the north, south, and east. The Pacific Ocean is 9 miles to the west. The Santa Ynez River (dry most of the year) runs east to west through the valley. A chaparral forest with sandy soil, named Burton Mesa, runs to the north. Lompoc weather is broadly defined as a cool Mediterranean climate that is typical to most coastal areas in Southern California. In Lompoc, the summers are short, comfortable, dry, and mostly clear and the winters are cold, wet, windy, and partly cloudy. Over the course of the year, the temperature typically varies from 40°F to 72°F and is rarely below 32°F or above 82°F .
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award