Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

LOWER BEARING ASSY

Active
N0010426QYA7KFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract is for the manufacture and delivery of the Lower Bearing Assembly #1, a specialized component for use on U.S. Navy submarines, under a 100% small business set-aside solicitation identified as N0010426QYA7K. The requirement demands strict adherence to specific engineering drawings and a comprehensive set of technical standards including MIL-STD-973, MIL-STD-130N, MIL-STD-2035A, ISO 9001, ISO/IEC 17025, and multiple NAVSEA technical publications. The contractor must implement a robust quality inspection system, submit and obtain prior government approval for detailed test plans, welding procedures, nondestructive testing protocols, and first article inspection reports. All production units require 100% dimensional and nondestructive inspection, including visual and liquid penetrant testing of welds, thread inspections to ASME B1.3 systems, and certification of material composition through mill reports. Each component is subject to permanent marking per MIL-STD-130 with traceability by heat, lot, batch, and serial number. The contract requires full documentation of objective quality evidence for all materials and processes, including certified mill data, weld rod certifications, heat treatment records, material compliance certificates, and welder and inspector qualification records. Mercury contamination is strictly prohibited, and any use of mercury or mercury-bearing materials requires explicit written approval from the Procurement Contracting Officer with detailed protective measures and warning labeling. All deliveries must be accompanied by a Mercury Exclusion Certification. The contract uses FOB destination terms, requires electronic submission of invoices and receiving reports through WAWF/IRAPT, and sets a 1-year warranty after delivery with a 45-day defect discovery window. The Naval Surface Warfare Center, Philadelphia Division (NSWCPD), serves as the accepting activity with DODACC N64498 and is responsible for reviewing and approving all contractual data items, technical submissions, and final inspections. The government reserves the right to inspect at any point during manufacturing, and contract compliance is mandatory throughout the supply chain, including subcontractors. The solicitation closes on July 30, 2026, with evaluation based on balanced consideration of price and non-price factors such as delivery lead time and verified past performance.

General Info

Manufacture and deliver Lower Bearing Assembly #1 for U.S. Navy subs under strict MIL-STD, ISO, and NAVSEA specs with 100% inspection and mercury exclusion.

Agency

Department Of Defense → Navsup Weapon Systems Support MechView Agency

NAICS

332991 - Ball and Roller Bearing ManufacturingView NAICS

Place of Performance

PA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

1 update
PhaseSolicitation
Posted

Solicitation

Amendment 1

Contract was updated

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support Mech
Contacts1 person available
OfficeMECHANICSBURG, PA, 17050-0788, USA
Organization / Agency
Department Of Defense → Navsup Weapon Systems Support Mech
View Agency Profile
Office AddressMECHANICSBURG, PA, 17050-0788, USA

Full Description

Show more
CONTACT INFORMATION|4|N741.P12|3120|771-229-0455|jessica.l.harpel2.civ@us.navy.mil | ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|6|X|||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26||||||||||||||||||||||||||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and receiving reports (combo)||N/A|N00104|N/A|N/A|N/A|N/A|||N/A|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS Mechanicsburg | WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|1 year after date of delivery |45 days after discovery of defect||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2||| OPTION FOR INCREASED QUANTITY (MAR 1989)|1|365| LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020)|1|| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| This is an EAF SPARES requirement for the items listed in this solicitation. This requirement is 100 Percent set-aside for small businesses. The Government will issue an award resulting from this Request for Quotation (RFQ) to the responsible offeror whose quotation, conforming to the solicitation, results in the best value to the Government, considering both price and non-price factors. The following factors will be used to evaluate competitive offers received in response to this RFQ: 1. Price 2. Non-Price Factors a. Delivery Lead Time. The proposed delivery lead times and schedules will be evaluated and the proposed delivery lead time considered to be in the best interest of the Government will be rated higher than other delivery lead times proposed. b. Past Performance. The offeror's past performance on related contracts will be evaluated to determine, as appropriate, successful performance of contract requirements, quality and timeliness of delivery of goods and services, cost management, communications between contracting parties, proactive management, and customer satisfaction. All non-price evaluation factors, when combined, are approximately equal to price. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. \ 1. SCOPE 1.1 ;This procurement specification contains the requirements for manufacture and the contract quality requirements for ;Lower Bearing Assembly #1; for use on Navy submarines.; 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.1.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.1.3 The "Document Changes" section provides supersessions/changes to referenced documents. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DRAWING DATA=6853520 |53711| L| |D| | | | DRAWING DATA=7094231 |53711| K| |D| | | | DRAWING DATA=7094232 |53711| B| |D| | | | DRAWING DATA=7094233 |53711| B| |D| | | | DRAWING DATA=8627964 |53711| A| |D| | | | DOCUMENT REF DATA=FF-S-86J | | | |250401|A| | | DOCUMENT REF DATA=FF-S-92E | | | |250505|A|1 | | DOCUMENT REF DATA=MIL-STD-973 | | | |950113|A| |03| DOCUMENT REF DATA=MIL-STD-130N | | | |121116|A| | | DOCUMENT REF DATA=FF-S-200E | | | |250403|A| | | DOCUMENT REF DATA=QQ-N-281D | | | |851023|A|2 | | DOCUMENT REF DATA=L-P-535E | | | |790427|A| | | DOCUMENT REF DATA=EIA-649C | | | |190201|A| | | DOCUMENT REF DATA=NASM8846 | | | |240830|A| | | DOCUMENT REF DATA=ISO 9001 | | | |240201|A|1 | | DOCUMENT REF DATA=ISO 10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |171101|A| | | DOCUMENT REF DATA=MIL-STD-2035A | | | |950515|A| | | DOCUMENT REF DATA=NASM20995 | | | |190531|A| | | DOCUMENT REF DATA=NASM21209 | | | |210430|A| | | DOCUMENT REF DATA=NASM33540 | | | |260130|A| | | DOCUMENT REF DATA=SAE AMS5845L | | | |250701|A| | | DOCUMENT REF DATA=MIL-DTL-18240F | | | |970602|A| | | DOCUMENT REF DATA=FED-STD-H28/20B | | | |941221|A| |01| DOCUMENT REF DATA=MS35311A | | | |180926|A| | | DOCUMENT REF DATA=MIL-I-45208A | | | |810724|A|1 | | DOCUMENT REF DATA=A-A-59588B | | | |180727|A| | | DOCUMENT REF DATA=ASTM A240/A240M | | | |250601|A| | | DOCUMENT REF DATA=ASME B46.1 - 2019 | | | | |A| | | DOCUMENT REF DATA=POLYETHYLENE UHMW LIGHT BLUE | | | | |A| | | DOCUMENT REF DATA=NYLATRON GSM BLUE PA6 (COML) | | | | |A| | | DOCUMENT REF DATA=TECH PUB S9074-AR-GIB-010/27 | | | |130214|A| | | DOCUMENT REF DATA=POLYETHYLENE UHMW 1900 (COML) | | | | |A| | | DOCUMENT REF DATA=TECH PUB S9074-AQ-GIB-010/248 | | | |950801|A| | | DOCUMENT REF DATA=TECH PUB T9074-AS-GIB-010/271 | | |1 |140911|A| | | 3. REQUIREMENTS 3.1 ;DESIGN AND MANUFACTURING - The ;Lower Bearing Assembly #1; furnished under this contract/purchase order shall meet the material, mechanical, physical, welding and test requirements as specified on Drawings 6853520, Item No. 1 (consisting of items 2 thru 10), 7094231, Item No. 1 (consisting of 2 thru 7, 13), 7094233, Item No. 1 (consisting of Items 2 and 3), and 7094232, Item No. 1 including associated specifications mentioned in this procurement.; 3.1.1 ;The Self-Locking Element (Nylok, Configuration "A") furnished under this order shall be in accordance with MIL-DTL-18240 and shall be products which are qualified on the applicable qualified products list (QPL).; 3.1.2 ;The supplier shall perform all welding and nondestructive testing and inspection on Weldment Assembly #1 in accordance with the requirements of NAVSEA Technical Publications S9074-AR-GIB-010/278, T9074-AS-GIB-010/271, and MIL-STD-2035 specified on Drawing 7094231, Note 7.; 3.1.3 ;The supplier welders performing welding on Weldment Assembly #1 shall be qualified in accordance with NAVSEA Technical Publication S9074-AQ-GIB-010/248 specified on Drawing 7094231, Note 7.; 3.2 ;MARKING REQUIREMENTS - The supplier shall permanently mark each first article and production lot unit ;Lower Bearing Assembly#1; in accordance with Notes 11 and 15 of Drawing 6853520 per MIL-STD-130 and shall mark ;tag or bag; each unit with contract and assembly serial number.; 3.2.1 ;The supplier shall permanently mark each first article and production lot unit Item #2 of drawing 7094233 per Note 7, Item #1 of drawing 7094232 per Note 7 and Item #1 of drawing 8627964 per Notes 4 and 5 per MIL-STD-130, and shall mark ;tag or bag each item with contract, lot or batch and serial number until installed in the dsignated assembly.; 3.2.2 ;The supplier shall permanently mark and identify each first article and production lot unit Screw on the top surface per MIL-STD-130 for Drawing 6853520, Item #5 with material symbol "MP35N", manufacture's symbol and lot number, and Item Nos. 6 and 7 with material symbol "NI-CU", manufacture's symbol and lot number, and shall mark ;tag or bag; each item with contract and drawing/item until installed in the designated assembly.; 3.2.3 ;The supplier shall permanently mark and identify each first article and production lot unit ;tag or bag; drawing 6853520, items 8, 9, and 10 with contract, drawing/item, heat, lot or batch number, and drawing 7094231, items 2 thru 7 respectively including serial number per MIL-STD-130 until installed in the designated assembly.; 3.3 ;FIRST ARTICLE TESTING/INSPECTION - (Supplier Testing/Inspection). The first article testing/inspection procedure and approval are required for ;Lower Bering Assembly #1;. Government approval is required prior to commencement of first article unit.; 3.4 ;NOTIFICATION - The supplier shall notify Naval Surface Warfare Center, Philadelphia Division, (NSWCPD), 5001 S. Broad Street, Philadelphia, PA 19112-1403 by email matthew.j.ogilvie.civ@us.navy.mil, Code 242MO after award of contract.; 3.4.1 ;The NSWCPD is the acceptance activity for the Contract Data Requirements List (DD1423) Data Items. NSWCPD WAWF/IRAPT ;Acceptor; DODACC is ;N64498;.; 3.5 Configuration Control - MIL-STD-973 entitled "Configuration Management", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated. The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973, Paragraph 5.4.8.2 and Appendix D. Requests for Deviations shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.3 and Appendix E. Requests for Waivers shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.4 and Appendix E. (Original and two copies shall be submitted to Contracting Officer, NAVICP-MECH, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.) 3.5.1 Configuration Control - When the Contractor has received authorization on a prior contract for the same NSN for the use of a drawing of a later revision status, that authorization is hereby extended to all succeeding contracts/purchase orders until another drawing revision is approved. The Contractor will notify the PCO of this occurrence in each instance, in the response to the solicitation. Such notification shall be in writing setting forth the contract under which the prior authorization was granted, the date of the granting of the authorization, and the name of the granting authority. Contractors shall also refer technical inquiries (other than those covered by MIL-STD-973) on company letterhead signed by a responsible company official, with copies distributed as stated below. The original and two copies of all Contractor generated correspondence regarding configuration shall be submitted to Contracting Officer, NAVICP-MECH, P.O. Box 2020, Mechanicsburg, PA 17055-0788. Contractors are cautioned that implementing engineering changes, waivers, deviations or technical inquiries into the contract/purchase order without approval of the Contracting Officer will be at the sole risk of the Contractor. 3.6 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection. If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part. The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are located so as not to constitute a contamination hazard. If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the requirements of this contract are concerned. These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements. Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided: Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface ship atmosphere. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 4.4 ;INSPECTION SYSTEM - The supplier's Quality Inspection System shall be in accordance with MIL-I-45208 or ISO 9001 and ISO/IEC 17025 or ISO 10012. The supplier shall develop and submit their written Quality Inspection and Test Plan as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the supplier's written Quality Inspection and Test Plan is required by the contract. CDRL: QUALITY INSPECTION & TEST PLAN per MIL-I45208, ISO/IEC 17205 and DI-QCIC-81110; 4.5 ;SURFACE ROUGHNESS - All surface finishes are in RMS measurements. Where the degree of surface roughness is indicated, the surface shall be free from all visible imperfections as defined by Standard ASME B46.1.; 4.6 ;FINISHED EDGES - Finished edges shall be in accordance with the applicable drawing requirements.; 4.7 ;THREADS - Threads shall bee inspected in accordance with FED-STD-H28/20 System 21 requirements, except for drawing 6853520, Item #7 threads shall be inspected to System 22 as required by FF-S-86 (in accordance with ASME B1.3). Thread inspection shall include the measurement and recording of the major diameter for external threads and the minor diameter for internal threads.; 4.8 ;MATERIAL CONTROL - The supplier shall have an effective material control system that provides for certified quantitative mill or industrial laboratory reports of chemical and physical analysis by heat, lot or batch for raw material ordered for first article and production units. If the material is subsequently heat-treated, a certification of physical analysis after heat treatment is also required for each heat lot or batch. Also, where the applicable material specification calls out (eg., corrosion resistance test, macro-etch test, etc.) these test results shall also be reported on the applicable mill or industrial laboratory report. The physical analaysis shall establish the following properties for metallic parts: Ultimate Tensile Strength, Yield Strength and Elongation including Reduction of Area and Hardness required by the material specification.; 4.9 ;FIRST ARTICLE TESTING/INSPECTION - (Supplier Testing/Inspection). The supplier shall perform first article testing/inspection on ;Lower Bearing Assembly #1; in accordance with the applicable drawings, specifications and their approved first article procedure and nondestructive testing (visual inspection and liquidpenetrant testing) procedures.; 4.9.1 ;The first article inspection hsall be made by the cognizant DCMA-QAR at the supplier's and/or subcontractor facility. The supplier shall notify NSWCPD, Code 242MO two weeks in advance prior to the scheduled first article testing/inspection, so an NSWCPD representative has the option of being present during the first article testing/inspection.; 4.10 ;FIRST ARTICLE APPROVAL FOR TESTING/INSPECTION PROCEDURE AND ACCEPTANCE - (Supplier Testing/Inspection). The supplier shall prepare and submit their First Article Testing/Inspection Procedure for ;Lower Bearing Assembly #1; in accordance with the requirements of DI-NDTI-80603, the applicable drawings and specifications as indicated on teh Contract Data Requirements List (DD Form 1423). Government approval of teh procedure is required prior to commencement of first article unit. CDRL: FIRST ARTICLE TESTING/INSPECTION PROC per DI-NDTI-80603A; 4.11 ;FIRST ARTICLE TESTING/INSPECTION - The supplier shall perform 100% examination, inspection and testing on the first article ;Lower Bearing Assembly #1; unit (component parts/assembly) in accordance with the applicable drawings, their approved first article procedure and nondestructive testing (visual inspection and liquid penetrant testing) procedures. The supplier shall record the actual measurements and results of each dimension, threads, examination, inspection and test identified on the applicable drawings.; 4.11.1 ;The supplier shall visually and physically inspect 100% the (component parts/assembly) dimensions and threads (including of teh major diameter for external threads and the minor diameter for internal threads) identified on the applicable drawings. Threads shall be inspected 100% and results recorded.; 4.11.2 ;The supplier shall perform visual inspection and liquid penetrant testing 100% on all weld joints shown on Drawing 7094231 for Weldment Assembly #1 in accordance with their approved nondestructive inspection and testing procedures.; 4.12 ;FIRST ARTICLE TESTING/INSPECTION REPORTS AND ACCEPTANCE - (Supplier Testing/Inspection). The supplier shall submit for completed first article unit ;Lower Bearing Assembly #1; testing/inspection report in compliance with the requirements of DI-NDTI-80603, the applicable NAVSEA Technical Publications, drawings, and specifications. The report shall also include a copy of ;Certified Mill Certification; Weld Rod Certification; Heat Treatment Certification; Certificate of Conformance for Material; Certificate of Compliance for Material; Visual/Dimensional Inspection Report; NDT Visual Inspection and Liquid Penetrant Testing Report; Welder's Qualification Certification; NDT Visual Inspector and Liquid Penetrant Inspector Qualification Certification; identified in the Objective Quality Evidence Records Section of this document, and as indicated on the Contract Data Requirements List (DD Form 1423. Government approval of the first article testing/inspection report is required prior to commencement of production units. CDRL: FIRST ARTICLE TESTING/INSPECTION REPORT per DI-NDTI-80809B; 4.13 ;PRODUCTION LOT - The supplier shall perform 100% examination, inspection and testing on each production lot ;Lower Bearing Assembly #1; unit (component parts/assemblies) in accordance with the applicable drawings and their approved nondestructive testing (visual inspection and liquid penetrant testing) procedures. The supplier shall record the actual measurements and results of each dimension, threads, examination, inspection and test idetified on the applicable drawings.; 4.13.1 ;The supplier shall visually and physically inspect 100% on each (component parts/assemblies) dimensions and threads (including of the major diameter for external threads and the minor diameter for internal threads) identified on the applicable drawings. Threads shall be inspected 100% and results recorded.; 4.13.2 ;The supplier shall perform visual inspection and liquied penetrant testing 100% on all weld joints shown on Drawing 7094231 for Weldment Assembly #1 in accordance with their approved nondestructive inspection and testing procedures.; 4.14 ;PRODUCTION LOT TESTING/INSPECTION REPORTS AND ACCEPTANCE - (SupplierTesting/In spection). The supplier shall submit for the completed production units ;Lower Bearing Assembly #1; testing/inspection reports in compliance with the applicable Data Item Descriptions (DIDs), NAVSEA Technical Publications, drawings and specifications. The Production Lot Testing/Inspection report shall consist of ;Certified Mill Certification; Weld Rod Certification; Heat Treatment Certification; Certificate of Conformance for Material; Certificate of Compliance for Material; Visual/Dimensional Inspection Report; NDT Visual Inspection and Liquid Penetrant Testing Report; Welder's Qualification Certification; NDT Visual Inspector and Liquid Penetrant Inspector Qualification Certification and Mercury Exclusion Certification; identified in the Objective Quality Evidence Records Section of this document, and as indicated on the Production Lot Test/Inspection (PLT) Contract Data Requirements List (DD Form 1423). Government approval of the production lot testing/inspection report is required prior to shipment of production lot units. CDRL: PRODUCTION LOT TESTING/INSPECTION REPORT per DI-NDTI-80809B; 4.15 ;PROCEDURES.; 4.15.1 ;WELDING PROCEDURE - The supplier shall prepare and submit a written welding procedure and welding procedure qualification test data for performing welding in accordance with NAVSEA Technical Publications S9074-AR-GIB-010/248 and S9074-AQ-GIB-010/248 including welder's qualification per Tech S9074-AQ-GIB-010/248 as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the Welding and Welding Qualification Test Data Procedure is required prior to commencement of first article unit. CDRL: WELDING AND WELDING QUALIFICATION TEST DATA PROCEDURE per NAVSEA TECH PUB S9074-AR-GIB-010-/278 AND S9074-AQ-GIB-010/248; 4.15.2 ;NONDESTRUCTIVE TESTING (NDT) PROCEDURE - The supplier shall prepare and submit a written nondestructive testing procedure for Visual Inspection and Liquid Penetrant Testing in accordance with NAVSEA Technical Publication T9074-AS-GIB-010/271 and Acceptance Standard MIL-STD-2035 including nondestructive test personnel qualifications per Tech Pub T9074-AS-GIB-010/271 as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the applicable nondestructive inspection testing procedures is required prior to commencement of first article unit. CDRL: NDT VISUAL INSPECTION and LIQUID PENETRANT TESTING PROC per NAVSEA TECHNICAL PUB T9074-AS-GIB-010/271 and MIL-STD-2035; 4.16 ;PRODUCTION LOT INSPECTION/ACCEPTANCE - (Supplier Testing/Inspection). The supplier shall submit for the production lot units, the inspection and test reports identified in the Objective Quality Evidence Records Section of this document and as indicated on the Production Lot Testing/Inspection (PLT) Contract Data Requirements List (DD Form 1423). Government approval is required prior to shipment of production units.; 4.17 ;FINAL INSPECTION AND ACCEPTANCE - Final inspection and acceptance of production lots shall be made by the cognizant DCMA-QAR in conjunction with the Specific Government Inspection Instructions (SGIIs) furnished by NSWCPD. In addition to the normal DCMA surveillance, the production unit(s) shall be under the surveillance of NSWCPD Quality Assurance Specialist as required.; 4.18 ;OBJECTIVE QUALITY EVIDENCE RECORDS - The supplier shall maintain Objective Quality Evidence Data (OQEDs) of materials used in the fabrication of ;Lower Bearing Assembly #1;. Records shall be traceable by drawing/item, heat, lot or batch, serial and contract number. All OQEDs shall be clearly legible including name and title. The supplier may provide exact (quality) photocopies of objective quality evidence records being delivered under this purchase order instead of originals.; 4.18.1 ;The supplier shall furnish a copy of the following OQEDs listed below and as indicated on the Contract Data Requirements List (DD Form 1423) for acceptance. The reports shall be correlated to the drawing/item, heat, lot or batch, serial and contract number. Supplier format is acceptable for the below listed CDRLs. a. Certified Quantitative Mill or Industrial Laboratory Certification (chemical and physical analysis) for Items 5, 6 and 7 of drawing 6853520; Items 2 thru 6 of drawing 7094231. CDRL: CERTIFIED QUANTITATIVE MILL CERTIFICATION per DI-MISC-82386 b. Certification of Weld Rod used in manufacturing Weldment Assembly #1 of drawing 7094231 in accordance with NAVSEA Technical Publication S9074-AR-GIB-010/278. CDRL: WELD ROD CERTIFICATION per DI-MISC-82386 c. Heat Treatment Certification in accordance with SAE AMS5845 requirements for Item #5 of drawing 6853520. CDRL: HEAT TREATMENT CERTIFICATION per DI-MISC-82386 d. Certificate of Conformance for Material (certifying Self-Locking Element, Configuration "A" in accordance with drawing 6853520, Item #6 and MIL-DTL-18240 requirements). CDRL: CERTIFICATE OF CONFORMANCE per DI-MISC-82386 e. Certificate of Compliance for Materials: (1) Drawing 6853520 (certifying: Item #8 to drawing and the applicable manufacturer part number requirements, and Item Nos. 9 and 10 to drawing requirements). (2) Drawings 7094232, Item #1 and 7094233, Items #2 & #3 (certifying: Item #1 and #2 material Poyethylene UHMW 1900 Color "Light Blue" to their applicable drawing Notes 8., 8.1, 8.2, and 8.3 requirements; and Item #3 material and dimension to the applicable drawing requirements). (3) Drawing 7094231, Item #7 (certifying material Polyethylene UHMW 1900 to Notes 14., 14.1 and 14.2 of drawing requirements). (4) Drawing 862964, Item #1 (certifying material Nylatron GSM Blue PA6 to Note 6 of drawing requirements). CDRL: CERTIFICATE OF COMPLIANCE per DI-MISC-82386 f. Visual/Dimensional Inspection Reports shall show all the characteristics, the actual measurement and results of each dimension inspection (component parts/assemblies), including threads (also major diameter for external threads and the minor diameter for internal threads), contract number, name of supplier, drawing/item number, drawing revision letter, heat, lot or batch, (material symbol and manufacture's symbol for dwg. 6853520, Items 5, 6 & 7), serial of finished parts and assembly, item nomenclature and inspector's acceptance signature and date. CDRL: VISUAL/DIMENSIONAL INSPECTION REPORT per DI-NDTI-80809B g. NDT Visual Inspection and Liquid Penetrant Testing Reports for Weldment Assembly #1 of drawing 7094231 in accordance with NAVSEA Technical Publication T9074-AS-GIB-010/271 CDRL: NDT VISUAL INSPECTION and LIQUID PENETRANT INSPECTION TESTING REPORT per NAVSEA TECH PUB T9074-AS-GIB-010/271 h. Welder's Qualification Certification of personnel performing welding in accordance with NAVSEA Technical Publication S9074-AR-GIB-010/278. CDRL: WELDER'S QUALIFICATION CERTIFICATION per NAVSEA TECHNICAL PUBLICATION S9074-AR-GIB-010/278 i. NDT Inspector Qualification Certification of personnel performing visual inspection and liquid penetrant testing on Weldment Assembly #1 of drawing 7094231 in accordance with NAVSEA Technical Publication T9074-AS-GIB-010/271. CDRL: NDT VISUAL INSPECTION and LIQUID PENETRANT INSPECTOR CERTIFICATION per NAVSEA TECH PUB T9074-AS-GIB-010/271 j. Mercury Exclusion Certification (representing the contract units shipment). CDRL: MERCURY EXCLUSION CERTIFICATION per DI-MISC-82386; 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. A. Availability of Cancelled Documents - The DODSSP offers cancelled documents that are required by private industry in fulfillment of contractual obligations in paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. They may be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government Contract Number, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVICP-MECH Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered from: Commanding Officer NAVICP-MECH Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Naval Inventory Control Point Code 1 Support Branch 700 Robbins Avenue Phildelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications shall be obtained by submitting a request on DD Form 1425 to NAVICP-MECH. DATE OF FIRST SUBMISSION=ASREQ ;;APPROVAL OF THE QUALITY INSPECTION PLAN BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO FIRST ARTICLE.;; ;;NSWCPD IS THE ACCEPTANCE ACITVITY FOR CDRL DATA ITEM A001. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;; DATE OF FIRST SUBMISSION=ASREQ ;;APPROVAL OF THE PROCEDURE BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO COMMECEMENT OF FIRST ARTICLE.;; ;;NSWCPD IS THE ACCEPTANCE ACITVITY FOR CDRL DATA ITEM A002. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;; DATE OF FIRST SUBMISSION=ASREQ ;;APPROVAL OF THE REPORT BY NSWC PHILADELPHIA DIVISION IS REQURIED PRIOR TO COMMENCEMENT OF PRODUCTION LOT UNITS.;; ;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A003. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;; DATE OF FIRST SUBMISSION=ASREQ ;;PROCEDURE SHALL BE IN ACCORDANCE WIHT NAVSEA TECHNICAL PUBLICATION S9074-AR-GIB-010/278.;; ;;APPROVAL OF THE PROCEDURE BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO COMMENCEMENT OF FIRST ARTICLE UNIT.;; ;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A004. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;; DATE OF FIRST SUBMISSION=ASREQ ;;PROCEDURE SHALL BE IN ACCORDANCE WIHT NAVSEA TECHNICAL PUBLICATION S9074-AQ-GIB-010/248.;; ;;APPROVAL OF THE PROCEDURE BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO COMMENCEMENT OF FIRST ARTICLE UNIT.;; ;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A005. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;; DATE OF FIRST SUBMISSION=ASREQ ;;VISUAL INSPECTION AND LIQUID PENETRANT TEST PROCEDURE SHALL BE IN ACCORDANCE WITH NAVSEA TECH PUB T9074-AS-GIB-010/271.;; ;;APPROVAL OF THE PROCEDURE BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO COMMENCEMENT OF FIRST ARTICLE UNIT.;; ;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A006. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;; DATE OF FIRST SUBMISSION=ASREQ ;;SUPPLIER FORMAT IS ACCEPTABLE.;; ;;PLT REPORT SHALL CONSIST OF OQED RECORDS LISTED IN CONTRACT SECTION E: CERTIFIED MILL CERT; WELD ROD CERT; HEAT TREATMENT CERT; CERT OF CONFORMANCE MATERIAL; CERT OF COMPLIANCE MATERIAL; VISUAL/DIMENSIONAL INSPECTION RPT; NDT VISUAL INSP & LIQUID PENETRANT TEST RPT; WELDER'S QUAL CERTFICATION; NDT INSPECTOR QUAL CERTIFICATION AND MERCURY EXCLUSION CERT.;; ;;APPROVAL OF THE REPORT BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO SHIPMENT OF PRODUCTION LOT UNITS.;; ;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A007. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;;

Similar Contracts

Same NAICS industry code

NAICS: 332991
New
Federal
BEARING,ROLLER,NEEDLE
Solicitation # SPE4A626Q1293
The U.S. Department of Defense, through DLA Aviation, is conducting market research under solicitation number SPE4A626Q1293 to identify potential sources for the Needle Roller Bearing identified by NSN 3110-00-455-6188, with approved CAGE codes for RBC Bearings Incorporated, Leonardo Spa Helicopters Division, and Industrial Tectonics Bearings. This is a sources-sought notice, not a formal solicitation or procurement action, and is intended to gather information on manufacturers capable of supplying the item, which is classified as commercial and will be acquired under FAR 13.5 procedures. Respondents are requested to submit manufacturer details including CAGE codes, part numbers, production locations, and points of contact voluntarily, with no formal proposals or pricing required at this stage. The notice does not commit the government to award a contract, nor does it contain evaluation criteria, contract clauses, or binding terms. The requested item is specified with a QCC of QCJ, requires Contractor First Article Testing, and has a projected delivery timeline of 350 days after receipt of order. All supply must originate from approved manufacturers and be delivered FOB Origin with inspection and acceptance also occurring at origin, with first destination transportation applying. The solicitation is open to surplus dealers, small business dealers, and distributors who can provide either government surplus material with a completed DLAD 52.211-9000 certificate or adequate traceability documentation. Responses must be submitted via email to Matthew Diefes at matthew.diefes@dla.mil by August 26, 2026, with no formal submission portal or structured format required. The contracting office is located in Richmond, Virginia, with no specified contract value, invoicing procedures, packaging requirements, or COTR/COR assigned since this action is purely for market research purposes under FAR 12 and 13.5, and no formal competitive award will result from this notice.
DLA Aviation

POSTED

about 6 hours ago

DEADLINE

in 29 days
View Details
NAICS: 332991
New
Federal
BALL, SCREW ASSEMBLY
Solicitation # SPMYM326Q8023
This solicitation, identified as SPMYM326Q8023, is a combined synopsis and solicitation for commercial items issued under FAR Part 12 and Simplified Acquisition Procedures, with no paper copies available and all information posted exclusively on SAM.gov. The requirement is for two Ball, Screw Assemblies, specifically OEM part number B15125C Rev-D manufactured by Beaver Aerospace & Defense Inc., furnished as a fully machined and assembled unit in compliance with proprietary technical data. This is a sole-source procurement due to the proprietary nature of the drawing and OEM status, and quotations from any other manufacturer will be rejected outright. Offerors must be registered and active in SAM.gov, possess a valid CAGE code, and submit complete responses via email to sam.j.aiguier.civ@us.navy.mil and DLA-KME-QUOTATIONS@DLA.MIL by the deadline of July 28, 2026, at 12:00 PM EST. Evaluation will be conducted using the Lowest Price Technically Acceptable method, with technical acceptability determined by strict adherence to specifications, including the requirement for quality certifications, test results, and supply chain traceability documentation. Responsibility screening will be conducted through PPIRS and FAR 9.104 criteria. All respondents must complete and include with their offer the signed Security Agreement for Protection of Naval Nuclear Propulsion Information and DD Form 2345 to obtain proprietary drawings. Proposals must include pricing, FOB Destination terms, business size under NAICS 332991, and payment preference between Government Commercial Purchase Card (GCPC) or Wide Area Workflow (WAWF). If GCPC is selected, a receiving report must be submitted via WAWF. Offerors not the original manufacturer must disclose the manufacturer’s name, location, and business size. The contract incorporates a comprehensive array of FAR, DFARS, DLAD, and local clauses related to cybersecurity (including NIST SP 800-171 and DFARS 252.204-7012), prohibitions on covered telecommunications equipment, trafficking in persons, labor standards, environmental controls, Buy American restrictions, and export control requirements. Items must be delivered to Kittery, Maine, by September 28, 2026, with inspection and acceptance occurring at destination per QA-4 terms and constructive acceptance extended to 45 calendar days. Packaging must conform to
DLA Maritime - Portsmouth

POSTED

about 6 hours ago

DEADLINE

in 7 days
View Details
NAICS: 332991
New
DIBBS
BEARING, ROLLER, AIRFRAME
Solicitation # SPE4A6-26-R-XC13
The contract is for one roller bearing, airframe model DAS6-25C, identified by NSN 3110-00-143-3010, under solicitation SPE4A6-26-R-XC13. The item is classified as a critical application component and must be manufactured entirely in the United States, its outlying areas, or Canada, with over 50% of the total cost of all bearing components—rolling elements, retainer, inner race, and outer race—originating from these regions. A signed contractor’s declaration confirming the domestic origin of materials is required and must be submitted upon request; failure to provide this will disqualify the quote. The solicitation is subject to cancellation if no compliant offers are received, with potential reinstatement only after a formal waiver is approved. Pricing is firm fixed, with no variance allowed in quantity, and delivery is due 177 days after award. Inspection and acceptance occur at destination, with FOB terms also at destination. Packaging and preservation must follow MIL-STD-2073-1E, MIL-DTL-197M, and all DLA packaging requirements, including specific preservation methods determined by bearing type and closure, approved lubricants, and stringent quality verification controls. Marking must comply with MIL-STD-129 using special marking code ZZ-ZZ and no government identification may be removed from non-accepted supplies. Unit of issue is each, and no item unique identification is required per the service customer’s request. Measuring and test equipment must be calibrated and traceable, and documentation for source approval is governed by RC001. All technical and quality requirements referenced by R or I numbers are incorporated from the DLA Master List of Technical and Quality Requirements. The solicitation was issued on August 5, 2026, with responses due by August 19, 2026.
ASC COMMODITIES DIVISION

POSTED

1 day ago

DEADLINE

in 13 days
View Details

More opportunities from Department Of Defense → Navsup Weapon Systems Support Mech

Same awarding agency

NAICS: 332919
New
Federal
ADAPTER ASSEMBLY CM
Solicitation # N0010426QBC08
The contract pertains to the procurement of an ADAPTER ASSEMBLY CM under solicitation N0010426QBC06, with a closing date extended to June 18, 2026, and pricing valid for 60 days after submission unless otherwise specified. All technical requirements are governed by the Individual Repair Part Ordering Data (IRPOD), which dictates the order of precedence for conflicting documents, with contract amendments and schedules taking priority over drawings, specifications, and standards. Contractors must comply strictly with the revision levels cited in the IRPOD and may not mix revisions without written approval from the contracting officer. The IRPOD is mandatory and accessible via the BPMI e-Commerce portal, requiring pre-registration and password authentication; vendor review of the IRPOD is compulsory. Technical documentation is marked NOFORN and subject to export controls, with distribution restricted to U.S. entities unless prior approval is obtained from Naval Sea Systems Command. Packaging must adhere to MIL-PRF-23199 and MIL-STD-2073 where applicable, with green poly bags permitted only when cleanliness controls from MIL-STD-767, MIL-STD-2041, or similar standards are invoked, and fire-retardant materials are no longer required. Mercury or mercury-containing compounds are prohibited from direct contact with supplied hardware. Quality assurance responsibilities are defined entirely within the IRPOD, requiring contractors to maintain complete inspection records available to the government throughout performance and beyond. Pre-manufacturing submissions, including procedures and drawings, must be submitted within 45 days after contract award and certified according to DI-QCIC-8871, while post-production test and inspection reports must be submitted at contract end per DI-QCIC-8872, both in separate packages keyed to each unique contract line item. All contractual documents are deemed issued upon electronic transmission or mail delivery, and submissions must follow WAWF or alternative electronic means. Pricing must be clearly stated with validity period, and deviations or delays require formal justification including technical evaluation of impact on form, fit, function, and quality, reviewed by the Government Quality Assurance Representative before forwarding to the post-award contracting officer. Compliance with cybersecurity maturity certification, small business set-aside, priority rating for national defense, and security prohibitions under recent deviations is mandatory.
Other Metal Valve and Pipe Fitting Manufacturing

POSTED

about 6 hours ago

DEADLINE

in 29 days
View Details
NAICS: 332919
New
Federal
VALVE,BALL
Solicitation # N0010426QZB70
This contract pertains to the procurement of a Compartment Salvage Ball Valve for critical shipboard use, designated as SPECIAL EMPHASIS Level I material due to its direct impact on vessel safety, where failure could result in catastrophic loss of life or ship. The valve and its components must strictly conform to specific Navy drawings including 4558705, 4558706, and others, with precise material requirements for parts such as the body, tube, ball, stems, studs, nuts, and seats, each governed by military and industry standards like QQ-N-281, MIL-T-16420, ASTM-B150, SAE AMS 6931, and MD71-GG Mearthane. All materials require traceable certification, with chemical and mechanical tests verified through Objective Quality Evidence, and mandatory certifications including Liquid Penetrant, Ultrasonic, and Dye Penetrant Inspections as specified. Material traceability is enforced from raw stock to finished component via permanent, legible markings meeting MIL-STD-792, with strict controls to prevent commingling and ensure documentation integrity. Non-metallic components such as elastomeric seats must meet exact hardness, tensile, and absorption properties per ASTM standards and be sourced exclusively from approved suppliers. All manufacturing and assembly processes must adhere to detailed specifications including welding and brazing requirements under S9074-AQ-GIB-010/248 and 0900-LP-001-7000, with procedure and welder qualification data subject to prior government approval. Thread forming is restricted to cutting, and lubricants containing molybdenum disulfide are prohibited due to seawater degradation risks; instead, Anti-galling compound A-A-59004 is mandated. The Contractor must maintain an ISO-9001-compliant quality system with calibration procedures aligning to ISO-10012 or ANSI-Z540.3, and is subject to Government Quality Assurance at source. Final acceptance requires 100% inspection of certification documents, traceability markings, and non-destructive test results, with zero defect tolerance for lot acceptance. All fasteners must be uniquely marked with material symbol, manufacturer ID, and traceability number, while Teflon coatings and seat dimensions must comply with specific drawing notes and CSD references. The contract mandates full compliance with Buy American provisions, Small Business set-asides
Other Metal Valve and Pipe Fitting Manufacturing

POSTED

about 6 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 334412
New
Federal
59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF
Solicitation # N0010426QDB44
This contract pertains to the repair and modification of a circuit card assembly under a firm-fixed-price arrangement, requiring strict adherence to technical specifications and quality standards mandated by the U.S. Navy. The solicitation mandates a Repair Turnaround Time of 53 days, measured from the physical receipt of the asset at the contractor’s facility as recorded in the Commercial Asset Visibility system, with final government inspection and acceptance essential before completion. All repairs must comply with MIL-STD-130 Rev N for marking and follow the original manufacturer’s technical directives, drawings, and approved repair procedures. The contractor is responsible for all inspections and testing, maintaining complete records for at least 365 days post-delivery, and must not substitute components without prior written approval from the contracting officer, with specific code classifications governing any design or part number changes. The contract enforces mandatory compliance with Federal Acquisition Regulation clauses including Buy American, cybersecurity maturity certification, small business subcontracting, and security prohibitions, while also requiring the use of Workflow Pro for payment and invoice processing. Freight is FOB Origin and handled by the Navy under CAV guidelines, with all quotes required to specify unit price, total price, and RTAT, or explain capacity limitations if unable to meet the 53-day requirement. The solicitation applies only to authorized distributors of the original manufacturer, and proof of authorization must be submitted with the offer. All documents and data are subject to distribution restrictions as defined by OPNAVINST 5510.1, and any requests for controlled documents must follow formal government channels. The award will be bilateral, contingent upon the contractor’s written acceptance, and pre-populated subcontract clauses define maximum RTAT, throughput capacity, and induction expiration dates not exceeding 365 days.
Bare Printed Circuit Board Manufacturing

POSTED

about 6 hours ago

DEADLINE

in 15 days
View Details
NAICS: 335931
New
Federal
ADAPTER
Solicitation # N0010426QEC52
The contract pertains to the procurement of an ADAPTER under solicitation N0010426QEC52, issued by the Navsup Weapon Systems Support Mech under the Department of Defense, with a NAICS code of 335931. The solicitation mandates strict compliance with technical and quality requirements outlined in the Individual Repair Part Ordering Data (IRPOD), which contractors must review prior to submission, as access is mandatory and requires pre-registration via the BPMI e-Commerce website. Delivery and performance are subject to stringent document control, where the IRPOD, drawings, technical data, and referenced military specifications form the basis of contractual obligations, with a defined order of precedence that prioritizes contract amendments, schedules, and terms in descending order. All technical documentation is marked with distribution restrictions, including NOFORN designations, requiring explicit government approval for any transmission to foreign nationals. Contractors must adhere to specified revision levels of referenced documents and may not mix revisions without written approval, and any deviations or waivers, particularly for critical repair parts, require detailed justification including technical data, impact assessments, and coordination with the Government Quality Assurance Representative. Pricing is valid for 60 days after the closing date, with clear instructions to specify alternative validity periods if applicable. Packaging must conform to MIL-PRF-23199 and other invoked standards, especially where cleanliness controls from MIL-STD-767, MIL-STD-2041, or similar documents apply, allowing only heat-sealed envelopes for components under such controls; the use of fire-retardant packaging is expressly prohibited. The contract includes mandatory compliance with cybersecurity maturity certification, small business set-aside requirements, priority ratings for national defense, and prohibitions against the intentional use of mercury. All contractual documents are deemed issued upon electronic transmission, and acceptance of the proposal constitutes bilateral agreement. Technical data delivery is governed by DD Form 1423 requirements, with specific codes dictating inspection and acceptance authority, submission frequency, deadlines, and data classification, including mandatory submission of a Certificate of Compliance per DI-MISC-81356 with each delivery. Data pricing categories are defined, with most items expected under Group I or II, requiring cost calculations based on direct labor, overhead, G&A, and profit, and no charge may be indicated only where data is commercial in nature and trivial in cost. All submissions must be made through the designated electronic portal, and failure to meet procedural and technical requirements will result in rejection without review
Current-Carrying Wiring Device Manufacturing

POSTED

about 6 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 334412
New
Federal
59--GPI-MBS CCA
Solicitation # N0010426QEA78
The contract pertains to the procurement of five units of NSN 7H-5998-017261855, identified as 59--GPI-MBS CCA, to be delivered to DLA Distribution Norfolk, Virginia. The Government intends to award this contract on a sole-source basis under FAR 6.302-1 due to the exclusive nature of the part, as the rights to the data required for its purchase or repair are not owned by the Government and cannot be acquired, developed, or obtained through any other means, and reverse engineering is deemed uneconomical. While the notice is not a solicitation for competitive bids, responsible sources may submit statements of capability or proposals within 45 days of the notice, or 30 days if award is made under an existing Basic Ordering Agreement, and all submissions will be evaluated to determine whether competition is feasible. The Government retains full discretion to decide whether to proceed without competition based on responses received. Award depends on the offeror, product, or manufacturer meeting all qualification requirements at time of award, as stipulated by FAR clause 52.209-1, and the solicitation will specify where to obtain further qualification details. Market research has determined that FAR Part 12 commercial item acquisition policies will not apply, but interested parties may still indicate if they can provide a commercial item equivalent within 15 days of the notice. The solicitation is managed by the Naval Supply Systems Command Weapon Systems Support, with primary point of contact Rebecca Aglow in Mechanicsburg, Pennsylvania.
Bare Printed Circuit Board Manufacturing

POSTED

about 6 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 335931
New
Federal
CABLE ASSEMBLY,MAIN
Solicitation # N0010426QQB84
This contract solicits repairs for the CABLE ASSEMBLY,MAIN and POWER SUPPLY under solicitation N0010426QQB84, with a response deadline of July 27, 2026. The Navy requires a Repair Turnaround Time of 90 days, measured from physical receipt of the defective asset at the contractor’s facility as recorded in the Commercial Asset Visibility system, with delivery to be FOB Origin. All repairs must conform to manufacturer specifications, MIL-STD-130 marking standards, and approved technical documentation, with no substitutions permitted without prior written approval from the NAVICP-MECH Contracting Officer. The contractor is responsible for all inspection, testing, and quality control activities and must maintain complete records for 365 days after delivery. Government Source Inspection is mandatory, and the Navy handles all freight under the CAV Statement of Work. The contract is a firm-fixed-price arrangement, and failure to meet the 90-day RTAT will result in monthly price reductions per unit, up to a specified maximum, without limiting the Government's right to terminate for default. The solicitation is restricted to authorized distributors of the original manufacturer, requiring proof of authorization to be submitted with the offer. Pricing must be justified, especially if exceeding historical rates or if the item is new to NAVSUP WSS, with supporting documentation such as prior invoices or commercial pricing data required. An option exists to increase the quantity to 28 units within 365 days of order receipt, at the same unit price. Both items are subject to Buy American and cybersecurity maturity certification requirements, and all documents provided by the Government carry distribution restrictions under OPNAVINST 5510.1, including potential NOFORN status. The award will be issued bilaterally upon the contractor’s signed acceptance, and all quotes must include unit price, total price, and RTAT, with separate T&E fees specified if an item is deemed beyond repair. The point of contact is Jacob Davis at N7M2.9 with email JACOB.T.DAVIS18.CIV@US.NAVY.MIL.
Current-Carrying Wiring Device Manufacturing

POSTED

about 6 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 335312
New
Federal
28--MOTOR ASSY
Solicitation # N0010426QEC86
This contract is for the manufacture of eight motor assemblies, identified by NSN 1H-2895-016280105-PP and part number N0010426X7547, to be produced in full compliance with the IRPOD and technical data package, version 003. The deliveries are due 180 days after contract award and must be shipped to two designated DLA distribution locations: New Cumberland, Pennsylvania, and Tracy, California. The solicitation number is N00104-26-Q-EC86, and all proposals must be submitted fully completed and signed before the response deadline of September 21, 2026. Government source inspection and Reports of Test Inspection are mandatory requirements for acceptance. This acquisition is entirely set aside for small business concerns under FAR clause 52.219-6, and only responsible small business entities are eligible to respond. Technical documents including drawings, IRPOD, and STRS are accessible only through a secured online portal at logistics.unnpp.gov, requiring prior registration and password access, and hard copies will not be mailed. Military and federal specifications and qualified product lists can be obtained via the DOD Single Stock Point or assist-online.gov. The offer must be submitted in English and in U.S. dollars, and the procurement is not conducted under commercial item acquisition policies. The contract is managed by the Naval Supply Systems Command Weapon Systems Support, with Blake V. Barrick as the primary point of contact, and interest is open to all qualified small business suppliers meeting the stated criteria.
Motor and Generator Manufacturing

POSTED

about 6 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 335311
New
Federal
CBL ACTR/LOCK PWR
Solicitation # N0010426QNE12
This contract pertains to the manufacture and quality assurance of the CBL ACTR/LOCK PWR component, governed by specific engineering drawings and technical standards including MIL-STD-129 for marking, MIL-STD-973 for configuration control, and NAVSEA S9320-AM-PRO-020/MLDG for manufacturing certification. The item is intended for use on submarines or surface ships, mandating strict mercury-free requirements to prevent contamination of sensitive systems, with any proposed use of mercury requiring prior written approval and detailed safety protocols. Suppliers must maintain an ISO 9001 quality system and are responsible for all inspections, records, and compliance, with government oversight reserved at any stage. Configuration changes, deviations, or waivers must be formally approved and documented through specified channels to NAVICP-MECH in Mechanicsburg, PA. The solicitation, issued under N0010426QNE12 by the Naval Supply Systems Command Weapon Systems Support in Mechanicsburg, Pennsylvania, is subject to emergency acquisition flexibilities and will be awarded as a rated order under the Defense Priorities and Allocations System. It is a total small business set-aside with mandatory compliance with Buy American Act provisions, Small Business Subcontracting Plans, and cybersecurity maturity certification requirements. All contractual documents are deemed officially issued upon electronic transmission, and award requires bilateral acceptance. Vendors must adhere to stringent packaging standards under MIL-STD-2073, provide certified test reports for each assembly, and ensure subcontractors meet all terms. Proposals are due by September 8, 2026, and technical inquiries must be directed to the designated point of contact, James E. Lewis, via official email.
Power, Distribution, and Specialty Transformer Manufacturing

POSTED

about 6 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332722
New
Federal
NUT,HEX,SELF-LOCKIN
Solicitation # N0010426QFE05
This contract mandates the supply of self-locking heavy hex nuts designated as Special Emphasis Level I material, critical to shipboard systems where failure could result in catastrophic consequences including loss of life or vessel. The material must conform to MIL-DTL-32258 with specific chemical and mechanical requirements tied to QQ-N-281 Class A or B, and the self-locking element must comply with ASTM-D6456 or ASTM-D4066 depending on temperature rating. Traceability is strictly enforced through unique heat-lot markings on each component and mandatory certification documentation that must directly link to the physical item, with no transcription permitted. All certifications must include full compliance statements signed by authorized personnel, with disclaimers strictly prohibited. Quality assurance systems must comply with ISO-9001, ISO-10012, and ISO/IEC 17025 or an acceptable alternative including MIL-I-45208 and MIL-STD-45662, subject to government audit at source. First Article Testing requirements are satisfied through prior qualification data or letters from qualified sources, and all material must undergo 100% inspection for traceability marking, certification completeness, and nondestructive testing results. Delivery is governed by a strict schedule requiring certification data submission 20 days prior to shipment and formal acceptance by Portsmouth Naval Shipyard via the WAWF system before any material may be shipped. Final delivery must occur no later than 365 days after contract award, with the order rated DO for national defense priorities. Materials must be mercury-free, marked in accordance with MIL-STD-792, and all internal threads must be cut, not cold-formed. Subcontractor oversight, material handling procedures, and re-certification after processing are tightly controlled, and any deviation or waiver requires prior written approval from the Contracting Officer. All documentation must be submitted electronically through ECDS and WAWF, with notifications sent to designated Navy email addresses, and compliance is monitored under emergency acquisition flexibilities.
Bolt, Nut, Screw, Rivet, and Washer Manufacturing

POSTED

about 6 hours ago

DEADLINE

in 12 days
View Details
NAICS: 314999
New
Federal
CLOTH,FIBERGLASS
Solicitation # N0010426QED21
The contract pertains to the procurement of fiberglass cloth under solicitation N0010426QED21, issued by the Naval Supply Systems Command Weapon Systems Support, Mechanical, located in Mechanicsburg, Pennsylvania. Pricing is valid for 60 days after the closing date, with submission required via email or NECO specifying the validity period if different. All contractual documents are deemed issued upon electronic transmission, and acceptance of the proposal constitutes bilateral agreement. The scope prioritizes Section C over Section D in case of conflict, and compliance is mandatory with all referenced technical documents obtained via the BPMI e-Commerce site, which requires pre-registration and password access. The Individual Repair Part Ordering Data (IRPOD) is central to defining requirements and must be thoroughly reviewed by the vendor. Applicable documents include MIL-I-45208 for quality requirements, MIL-PRF-23199 for packaging with specific clarifications on cleanliness controls and poly bag usage, and MIL-STD-2073 for general packaging, with fire-retardant materials no longer required. Technical data packages must be submitted per DD Form 1423 instructions, with clear delineation of deliverables and inspection codes. All technical documentation is marked NOFORN, requiring strict control and prior approval for any foreign dissemination. Quality assurance is governed by the IRPOD, requiring the contractor to establish and maintain an inspection system acceptable to the government, with all inspection records retained throughout contract performance and beyond. The contractor must comply with specified revisions of drawings and specifications cited in the IRPOD and may not mix revisions unless approved in writing by the contracting officer. Deviations or waiver requests must include detailed justification, technical data supporting functional equivalence, and must be submitted through the Government Quality Assurance Representative within five working days. Mercury and mercury-containing compounds are strictly prohibited. All deliveries must meet the delivery schedule, with authorization to ship requiring prior PCO approval. Test reports under MIL-DTL-24244 must be submitted in two formats: a comprehensive package to the PCO within 45 days after award, and one copy attached to each delivered item. The contract mandates full compliance with small business program representations, veteran and disability equal opportunity policies, cybersecurity maturity model certification, priority rating for national defense, and security prohibitions as outlined in applicable federal deviations. The place of performance and delivery location is undefined, with payment governed by Wide Area Workflow instructions and invoicing via combined invoice and receiving reports.
All Other Miscellaneous Textile Product Mills

POSTED

about 6 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 336310
New
Federal
PUMP, FUEL INJECTIO
Solicitation # N0010426QJB72
This contract, issued under Emergency Acquisition Authority, pertains to the procurement of a PUMP, FUEL INJECTION with a solicitation number N0010426QJB72 and a response deadline of September 8, 2026. It is a firm-fixed-price procurement requiring strict adherence to military specifications, including MIL-STD-130 Rev N for marking, and mandates compliance with naval quality assurance standards that place full responsibility on the contractor for inspection, records retention for 365 days post-delivery, and total conformity of all delivered items. The contract includes a mandatory option to increase quantities within 365 days of award, with pricing locked at the original unit rate unless otherwise agreed, and enforces strict traceability requirements: distributors must provide official authorization from the original equipment manufacturer, and all pricing must align with historical or commercial benchmarks—failure to do so requires justification. Delivery is FOB Origin, and the Government retains the right to conduct inspections at any point. The contract incorporates several critical administrative and compliance components including the mandatory use of Workflow Pro Assist Module, prohibition against unauthorized substitutions without written approval, and detailed codes governing design or part number changes. Security exclusions and classified document handling procedures are strictly enforced, with special controls on NOFORN and Official Use Only materials. The contractor must comply with DoD small business subcontracting requirements and annual certifications, while also accepting performance penalties—up to a specified maximum per unit per month—for delays exceeding the required turnaround time, with unexcused delays potentially leading to termination for default. All documentation must reference the correct Cage Code (1Y875 and 0VP52) and associated reference numbers, and any change to the item must be formally approved by the NAVICP-MECH Contracting Officer. The contract is bilateral, requiring the contractor’s signed acceptance prior to execution, and is issued under a Deviation that modifies standard FAR provisions, particularly regarding representations, inspections, and payment procedures, all administered through the Navy Supply Systems Command in Mechanicsburg, Pennsylvania.
Motor Vehicle Gasoline Engine and Engine Parts Manufacturing

POSTED

about 6 hours ago

DEADLINE

in about 1 month
View Details