Lower Snake River Navigation Lock Tainter Valve System Upgrades

Awarded
W912EF24R0010Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The US Army Corps of Engineers, Walla Walla District, is awarding a firm-fixed-price hybrid construction and supply contract for the Lower Snake River Navigation Lock Tainter Valve System Upgrades. The project involves replacing sixteen culvert valve bodies, four at each of the following sites: Ice Harbor (HLD), Lower Monumental (LMA), Little Goose (LGA), and Lower Granite (LLA) in Washington. The estimated construction magnitude is between $10,000,000 and $25,000,000. The scope of work includes the fabrication, removal of existing equipment, and installation of new tainter valves, along with the replacement of associated mechanical equipment such as trunnion yokes, pins, bushings, keeper plates, linkages, hydraulic cylinders, and hydraulic power units. Additionally, electrical systems for power and control will be updated, including the integration of Cisco managed network switches for cybersecurity and interoperability. To ensure operational continuity, only one pair of valves will be replaced at a time at each project site. The contractor or fabricator must hold American Institute Steel Construction (AISC) certification in one of several bridge or hydraulic categories and possess a Fracture Critical Endorsement. Strict safety and quality standards are mandated, requiring compliance with EM 385-1-1, the presence of a certified Site Safety and Health Officer, and a qualified CQC System Manager. Performance and payment bonds are required for the construction portion of the contract. The project also necessitates the use of the Government-furnished Resident Management System for recording and submitting project data and documentation.

General Info

Contract Value

$64,622,881

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Walla Walla, WA, 99362, USA

Set-Aside

NONE

Award Issued Date

Documents

46

24R0010 LSR Navigation Lock Tainter Valve System Upgrades Technical Specifications

PDF, High priority: read this firstspecifications
High

24R0010 - Miscellaneous Metal Fabrication and Welding (Amend-0002)

PDF, High priority: read this firstspecifications
High

24R0010 Plans V1 Amendment 002 - Cylinder Assembly

PDF, High priority: read this firstspecifications
High

24R0010 Plans V1 Amendment 004

PDF, High priority: read this firstspecifications
High

24R0010 Plans V1 Amendment 005

PDF, High priority: read this firstspecifications
High

24R0010 Plans V1 Amendment 006

PDF, High priority: read this firstspecifications
High

24R0010 Plans V2 Amendment 002

PDF, High priority: read this firstamendment
High

24R0010 Plans V2 Amendment 004

PDF, High priority: read this firstamendment
High

24R0010 Plans V2 Amendment 005

PDF, High priority: read this firstamendment
High

24R0010 Plans V2 Amendment 006

PDF, High priority: read this firstamendment
High

24R0010 Plans V3 Amend 004

PDF, High priority: read this firstspecifications
High

24R0010 Plans V3 Amendment 002

PDF, High priority: read this firstamendment
High

24R0010 Plans V3 Amendment 005

PDF, High priority: read this firstamendment
High

24R0010 Plans V3 Amendment 006

PDF, High priority: read this firstamendment
High

24R0010 Plans V4 Amend 006 - Tainter Valve Machinery

PDF, High priority: read this firstspecifications
High

24R0010 Plans V4 Amendment 002

PDF, High priority: read this firstamendment
High

24R0010 Plans V4 Amendment 004

PDF, High priority: read this firstamendment
High

24R0010 Plans V4 Amendment 005

PDF, High priority: read this firstspecifications
High

24R0010 Section 05 50 03.00 28 - Miscellaneous Metal Fabrication and Welding

PDF, High priority: read this firstspecifications
High

24R0010 Section 35 20 16.46 28 - Tainter Valve Seals and Linkages

PDF, High priority: read this firstspecifications
High

24R0010v1 Supplemental Drawings LMA

PDF, High priority: read this firstspecifications
High

24R0010v2 Supplemental Drawings - LGA

PDF, High priority: read this firstspecifications
High

24R0010v3 Supplemental Drawings

PDF, High priority: read this firstspecifications
High

24R0010v4 Supplemental Drawings HLD

PDF, High priority: read this firstspecifications
High

W912EF24R0010 Amend-0001 - Measurement and Payment

PDF, High priority: read this firstamendment
High

W912EF24R0010 Amend-0003 - General Electrical Work

PDF, High priority: read this firstspecifications
High

W912EF24R0010 Amend-0005 - Hydraulic Power Systems Specifications

PDF, High priority: read this firstspecifications
High

W912EF24R0010 Amendment 0001

PDF, High priority: read this firstamendment
High

W912EF24R0010 Amendment 0002

PDF, High priority: read this firstamendment
High

W912EF24R0010 Amendment 0003

PDF, High priority: read this firstamendment
High

W912EF24R0010 Amendment 0004

PDF, High priority: read this firstamendment
High

W912EF24R0010 Amendment 0005

PDF, High priority: read this firstamendment
High

W912EF24R0010 Amendment 0006

PDF, High priority: read this firstamendment
High

W912EF24R0010 Amendment 0007

PDF, High priority: read this firstamendment
High

W912EF24R0010 - Ice Harbor Lock and Dam Tainter Valve System Upgrade Plans

PDF, High priority: read this firstspecifications
High

W912EF24R0010 - Little Goose Lock and Dam Tainter Valve System Upgrade Plans

PDF, High priority: read this firstspecifications
High

W912EF24R0010 - Lower Monumental Lock Tainter Valve System Upgrade Plans

PDF, High priority: read this firstspecifications
High

W912EF24R0010 - Lower Snake River Navigation Lock Tainter Valve System Upgrades

PDF, High priority: read this firstrfp
High

W912EF24R0010 Offeror Experience Form

PDF, High priority: read this firstpast-performance
High

W912EF24R0010 - Project Site Restrictions (Amend-0004)

PDF, High priority: read this firstspecifications
High

W912EF24R0010 Submittal Register Amendment 0001

PDF, High priority: read this firstspecifications
High

W912EF24R0010 Submittal Register - LSR Navigation Lock Tainter Valve System Upgrades

PDF, High priority: read this firstspecifications
High

W912EF24R0010 - Tainter Valve System Upgrade Plans

PDF, High priority: read this firstspecifications
High

Cisco Brand Name Determination - NWW Navigation Lock Tainter Valve System Upgrades

PDF, Low priorityjustification-and-authorization
Low

NAVFAC/USACE Past Performance Evaluation Questionnaire (Form PPQ-0)

PDF, Low prioritypast-performance
Low

W912EF24R0010 Contractor Attendance List

XLSX, Low priority2 pages · industry-day
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

12 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Aug 30, 2024 to Sep 6, 2024. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → US Army Engineer District Walla Wal
Contacts2 people available
OfficeWALLA WALLA, WA, 99362-1876, USA
Office AddressWALLA WALLA, WA, 99362-1876, USA

Full Description

Show more
The US Army corps of Engineers, Walla Walla District is planning to award a Hybrid Construction with Supply project entitled Lower Snake River Navigation Lock Tainter Valve System Upgrades. The work is located at the Ice Harbor Project (HLD) in Burbank Washington; Lower Monumental Project (LMA) in Kahlotus, Washington; Little Goose Project (LGA) in Starbuck, Washington; and Lower Granite Project (LLA) in Pomeroy, Washington. The North American Industry Classification System (NAICS) code for this project is 237990-Other Heavy and Civil Engineering Construction with $45,00,000 in annual receipts. The scope of work includes replacing four culvert valve bodies with new valves (four at each site, sixteen total) at HLD, LMA, LGA and LLA. This will be a firm-fixed-price hybrid construction with supply contract. The construction portion has an estimated magnitude of the construction between $10,000,000 and $25,000,000. Performance and payment bonds will be required for the construction portion of the contract only. The tainter valves are located in the navigation lock at the referenced projects, inside the fill/drain culverts, at varying depths below the spillway deck. The main access is down the valve shaft via crane and basket. The tainter valves have an approximate size of 15 feet tall, 12 feet wide, and 19.5 foot in radius. The weight of each tainter valve is approximately 54,000 lbs. This project also includes the replacement of the associated mechanical equipment, including linkages, hydraulic cylinders, and hydraulic power units. The trunnion yokes, pins, bushing, and keeper plates shall also be replaced. The electrical systems will also be updated, which includes power and control for each of the valves. The work described herein involves the repair of four tainter valves and associated operating assemblies at each of the above referenced locks and dams. The contractor or their subcontractor who will be responsible for fabrication shall be certified under American Institute Steel Construction (AISC) quality certification program with one of the following certifications: Major Bridge Fabricator (CBR), Certified Bridge Fabricator - Advanced (ABR), Certified Bridge Fabricator - Intermediate (IBR), or Certified Hydraulic Fabricator (HYD). In addition to the above required certifications, the fabricator shall be certified with the Fracture Critical Endorsement (F). There are three major actions included in this contract scope of work: 1. Fabrication of the replacement parts 2. Removal of the existing equipment 3. Installation of the replacement equipment Only one pair of the tainter valves will be replaced at a time at each project, such that the other pair of valves on the project will remain fully operational to allow normal navigation movement through the lock. HLD-LMA-LGA-LLA Tainter Valves Combined Requirements Summary Scope of Work: Replace tainter valve trunnions for each replaced valve, including the bases, pins, bushings, anchor bolts and epoxy backing Rehabilitate the stainless-steel sealing surfaces in the culverts by performing weld repair and machining. Replace the lifting eyes for each tainter valve. Replace the entire linage assembly that connects each valve with its hydraulic operating cylinder. This includes the connecting rod and pin assemblies, crosshead assemblies, push rods and push rod guides. Replace both hydraulic operating cylinders. Replace the hydraulic power unit (HPU) for each tainter valve. This includes the motor, pump, tank and associated piping connections to the operating cylinder and electrical controls. Replace electrical components including the motor cables, thermal overloads, motor starter and circuit breaker, transformer, auxiliary relay, pressure and temperature switch, and time delay relays. Provide commissioning services to test the entire tainter valve system to verify satisfactory installation and operation. All on-site work shall be performed in accordance with the Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1) The contractor will be responsible for establishing and managing an effective on-site Safety and Health program in accordance with EM 385-1-1 that will require the development and submission of a comprehensive project specific Accident Prevention Plan for Government acceptance. In addition, the contractor will be required to develop and submit for Government acceptance, and Activity Hazard Analyses for each phase of work and a project specific Fall Protection Plan that complies with EM 385-1-1. A site Safety and Health Officer (SSHO) employed by the prime contractor shall be required for each shift of the contractor'385-1-1s on-site operations. The SSHO shall possess a minimum of 5-years experience in construction safety on similar projects, shall have completed the 30-hour OSHA Construction Safety training within the last 5-years, and shall have completed at least 24-hours of formal safety training each year for the past 5-years. A qualified Fall Protection Competent Person shall be provided by the contractor for each shift of the contractor's on-site operations that involves work that exposes workers to fall hazards. This contract will require the contractor to furnish mobile crane equipment, crane operators, and rigging equipment that comply with the certification and testing requirements of EM 385-1-1. The contractor will be responsible for establishing and managing an effective Contractor Quality Control (CQC) System A CQC System Manager employed by the prime contractor shall be required to be on-site for each shift of the Contractor's operations. The CQC System Manager must possess a minimum of 5-years relevant experience in a supervisory or management position such as Quality Control Manager, Quality Assurance Manager, or Construction Manager directly involved in the management of construction quality at the project site. In addition, the CQC System Manager shall have completed the course entitled - Construction Quality Management for Contractors within the last 5-years. The Contractor will be required to use the Government-furnished Construction Contractor Module (referred to as QCS) of the Resident Management System (RMS) to record, maintain, and submit various information throughout the contract period. QCS is a Windows-based program that can be run on a stand-alone personal computer or on a network. The Government will make the QCS software available to the Contractor after contract award. The project will involve the development and management of Contractor furnished submittals for items such as pre-construction plans, product data, test reports, and contract close-out documentation as required by the technical specifications of the contract. Miscellaneous work within the project includes the delivery of Record Drawings to the customer. ATTACHED IS AMENDMENT 0001 ATTACHED IS AMENDMENT 0002 ATTACHED IS AMENDMENT 0003 ATTACHED IS AMENDMENT 0004 ATTACHED IS AMENDMENT 0005 ATTACHED IS AMENDMENT 0006 ATTACHED IS AMENDMENT 0007

More opportunities from Department Of Defense → US Army Engineer District Walla Wal

Same awarding agency

NAICS: 332812
New
Federal
Dworshak Skeleton Bay Draft Tube Bulkhead Rehabilitation
Solicitation # W912EF27QA0020001
The US Army Corps of Engineers, Walla Walla District, is soliciting offers for the rehabilitation of twelve draft tube bulkheads and associated seal keeper bars at the Dworshak Dam. This small business set-aside project requires the contractor to provide all personnel, materials, equipment, and transportation to move the bulkheads from Dworshak Dam to a repair facility and back. The scope of work includes existing coating removal, weld inspection and repair according to AWS D1./D1.M standards, and the application of new coatings in compliance with SSPC SP 5/NACE No. 1 and Section 09 97 02.00 28 for hydraulic structures. The government provides the bulkheads as government furnished property, with each unit having an estimated value of 850,000 dollars. The project is structured in three phases, with each phase involving two top and two bottom bulkheads. Performance is scheduled between November 23, 2026, and July 5, 2027, with specific pickup and return windows for each phase. Deliveries and retrievals must be coordinated 15 days in advance and occur Monday through Thursday. Key requirements include a one-year warranty on the coating system, the submission of general inspection reports within five business days of each inspection, and the provision of manufacturer safety data sheets and CERL Lab certification for all paint materials. The contractor must also ensure all paint is stored and packaged according to strict safety and stability guidelines to prevent degradation.
Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers

POSTED

1 day ago

DEADLINE

in 1 day
View Details
NAICS: 811310
New
Federal
LLA Fish Pump - Motor Rewind
Solicitation # W912EF27QA006
Solicitation W912EF27QA006 is a combined synopsis and request for quotation issued by the US Army Engineer District Walla Walla for motor rewind and asbestos abatement services at the Lower Granite Dam in Pomeroy, Washington. The scope of work involves the rewinding, refurbishing, and addition of eight resistance temperature detectors to three polyphase AC squirrel cage induction motors used for fish pumps. This includes one Hitachi dual winding motor and two Ideal Electric single-winding motors. To ensure operational continuity, the project will be executed by rewinding one motor per year, with a total performance period extending through December 2029. The contract is a firm-fixed-price acquisition and is not set aside for small business concerns, although evaluation preferences are provided for HUBZone small businesses. Key technical requirements include the use of a minimum class F motor insulation system and strict adherence to core loss and hot spot specifications. Deliverables include the refurbished motors, final operation and maintenance manuals, and on-site commissioning support. The government has established a seven-business-day window for the acceptance or rejection of services following delivery. Liquidated damages are specified for delays, with daily rates increasing annually from FY28 through FY30. Offerors must comply with various federal regulations, including the Buy American and Balance of Payments Program, E-Verify personnel screening, and DFARS cybersecurity reporting standards.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

7 days ago

DEADLINE

in 26 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS