Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Defense was posted on April 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

LPS Component Supply (Air Terminal, Conductors, Ground Rods)

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 335999
New
DIBBS
TAPE, INSULATION, ELECTR
Solicitation # SPE4A6-26-T-27CU
Solicitation SPE4A6-26-T-27CU, issued by the DLA Aviation ASC Commodities Division, is a request for quotations for electrical insulation tape under NSN 5970-00-480-1329. The requirement consists of multiple line items with varying quantities, including orders for 1, 2, 10, and 20 rolls. Delivery is required within five days of order, with various required delivery dates ranging from August 28, 2026, to September 8, 2026. Shipments are destined for multiple locations, including the USS SHOUP DDG 86, the DLA LMP Zone 1 depot in Texas, the Lockheed Martin Distribution Center in Georgia, ASD Oceana in Virginia, and the Base Naval de Rota in Spain. Terms are FOB Destination, with both inspection and acceptance occurring at the destination. The contractor must adhere to strict packaging and marking standards, including sealing each tape in a waterproof polyfilm bag and packing 10 to 12 rolls per intermediate container. All marking must comply with MIL-STD-129, specifically using Special Marking Code 32 for Type I shelf-life items, which have a non-extendable shelf life of 18 months. Palletization must follow RP001 requirements, and the use of mercury or mercury compounds in preservation, packaging, and marking is strictly prohibited. Technical compliance requires adherence to the DLA Master List of Technical and Quality Requirements and basic CID A-A-59163B. Offers produced using additive manufacturing are ineligible for award. The solicitation includes a price evaluation preference for certified HUBZone Small Business Concerns and requires compliance with the Buy American Act and the Berry Amendment. Invoicing must be processed electronically through the Wide Area WorkFlow system.
ASC COMMODITIES DIVISION

POSTED

about 22 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The contract calls for the supply of UL-listed lightning protection system components including air terminals, down conductors, bonding clamps, and ground rods to be installed across 35 sun shelters. All materials must meet UL certification standards to ensure compliance with safety and performance requirements. This is a small business set-aside subcontract under the SBA’s Total Small Business Set-Aside program, reserved exclusively for small businesses as defined by the FAR, with the NAICS code 335999 covering other electrical equipment and component manufacturing. The opportunity was posted on April 28, 2026, with a strict response deadline of April 29, 2026, at 3:00 PM. Performance is required at a location in Goulds, Florida, with a zip code of 32542. The contracting activity is under the Department of Defense, specifically FA2823 AFTC PZIO, though no point of contact details are provided and the full office address is unavailable. Suppliers must submit proposals through the SAM.gov portal prior to the deadline to be considered.

General Info

Small business subcontract for UL-listed lightning protection components at 35 sun shelters in Goulds, Florida, due April 29, 2026.

Agency

Department Of Defense → FA2823 Aftc PzioView Agency

NAICS

335999 - All Other Miscellaneous Electrical Equipment and Component ManufacturingView NAICS

Place of Performance

GOULDS, FL, 32542, USA

Set-Aside

SBA

Documents

This scope was carved out of FA2823-25-Q-A047.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Lightning Protection System for Sunshades

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA2823 Aftc Pzio
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → FA2823 Aftc Pzio
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply of UL-listed lightning protection components including air terminals, down conductors, bonding clamps, and ground rods for 35 sun shelters.

More opportunities from Department Of Defense → FA2823 Aftc Pzio

Same awarding agency

NAICS: 561621
New
Federal
AA/ACS LENEL REPLACEMENT
Solicitation # FA282326Q3007
Solicitation FA282326Q3007 is a total small business set-aside for a firm-fixed-price delivery order to replace the end-of-life Access Control System (ACS) in Building 351 at Eglin Air Force Base, Florida. The scope of work includes the installation of a high-performance desktop workstation, upgrading to the latest Lenel OnGuard software and licensing, and installing a CAC/PIN-capable HID Prox reader. Additionally, the contractor must integrate the existing main entry reader into a new standalone ACS panel and provide an operational badge printer. The project requires full database programming, user profile setup, and on-site system validation testing. The period of performance is estimated at 45 to 60 calendar days from award to final government acceptance, with a project kickoff meeting scheduled within seven days of award. Work must be performed during standard duty hours. Award will be based on the lowest price, technically acceptable (LPTA) basis, with technical acceptability and risk assessments, including DFARS provision 252.204.7024, serving as pass/fail gates. Final acceptance is contingent upon the delivery of signed system test reports and closeout documentation. A site visit is scheduled for September 8, 2026, requiring advance personnel information for base pass processing by September 4, 2026, and adherence to REAL ID requirements.
Security Systems Services (except Locksmiths)

POSTED

4 days ago

DEADLINE

in 2 days
View Details
NAICS: 238210
Federal
Bldg. 696, Network Wiring Upgrade (LAN Drops)
Solicitation # FA282326Q0084
The Air Force Test Center, Operational Contracting Division at Eglin Air Force Base, is soliciting quotations for a firm-fixed-price contract to perform a network wiring upgrade at Building 696. This project involves the engineering, furnishing, installation, and testing of 166 NIPR drops on the first floor of the south end of the building, including CAT6A data cabling, patch panels, and associated telecommunications room work. The acquisition is a 100 percent small business set-aside under NAICS code 238210, with a size standard of 19.0 million dollars. The period of performance is 120 calendar days after award, and all deliverables are provided FOB Destination. Award will be granted to the responsible offeror providing the lowest-priced, technically acceptable solution. Technical evaluations are based on a strict acceptable or unacceptable basis regarding the Performance Work Statement and 96th Communications Squadron Cyber Infrastructure Standards. Key requirements include the use of BICSI Registered Cabling Installers at the technician level and adherence to ANSI/TIA, NEC, and UFC standards. Offerors must submit their quotations electronically via the PIEE Solicitation Module by September 17, 2026, including their business size status, UEI, CAGE code, and a detailed list of proposed products with part numbers and quantities. Final acceptance is contingent upon the submission of copper to fiber test reports and as-built drawings, verified by the 96 CS/SCXP Project Manager.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

12 days ago

DEADLINE

in 5 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS