Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Virginia was posted on January 16, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Lynn Camp Paving

Closed
A409DMME:56440State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica's Public Works Engineering Division. The project involves addressing civil, mechanical, structural, and electrical deficiencies for four water reservoirs located at the Mt. Olivette Reservoir and the San Vicente Reservoir. With a project estimate of $27,344,000, the work requires a contractor holding a Class A General Engineering license. The estimated contract duration is 730 calendar days, although some contract documents reference a term of 520 days from the notice to proceed. Liquidated damages for delays are set at $13,200 per day. Bids must be submitted electronically via the OpenGov Procurement portal, with a final deadline of October 29, 2026, at 3:00 PM PT. Submission requirements include a bid guarantee of at least 10 percent of the bid amount and certification of a mandatory pre-bid job walk. Awarded contractors must provide Labor and Material Payment and Performance Bonds for 100 percent of the contract sum. The scope of work includes strict adherence to local noise ordinances, prevailing wage requirements, and technical specifications for potable water materials and electrical labeling. Performance is subject to inspection by the City and its designated engineers at both the project site and the place of manufacture.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 10 hours ago

DEADLINE

in 9 days
NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 16 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The Lynn Camp Paving project involves the provision of all necessary equipment, labor, materials, and resources to perform temporary patching on a section of roadway impacted by the Lynn Camp Project Phase II. The targeted area is situated at the intersection of State Route 655 and Birch Road, near Grundy, Virginia, with precise coordinates provided for location accuracy. The contract is managed by the Virginia Department of Energy, which is seeking responses by January 25, 2024, under solicitation number A409DMME:56440. The scope of work emphasizes quick and effective patching to restore roadway integrity, ensuring safety and usability during the project duration. The contract falls under the NAICS code 237990, indicating a focus on other heavy and civil engineering construction. The project is open for response through a designated online portal, with Jillian Bullock serving as the primary contact for inquiries. The overall aim is to facilitate timely completion of temporary repairs, supporting ongoing infrastructure improvements in the area. The contract’s details and further information can be accessed via the provided online link, ensuring interested parties have comprehensive project specifics to prepare their proposals.

General Info

Documents

7

Additional Special Conditions - Federal Requirements (May 2022)

DOCX, High priority: read this firstspecifications
High

Additional Terms & Conditions - AML Projects (June 2023)

PDF, High priority: read this firstspecifications
High

General Terms and Conditions (Revised November 2022)

PDF, High priority: read this firstspecifications
High

Lynn Camp Paving Memorandum #1

PDF, High priority: read this firstamendment
High

Lynn Camp Paving Project Bid Schedule (12-21-23)

PDF, High priority: read this firstspecifications
High

Lynn Camp Paving Project Scope of Work

DOCX, High priority: read this firstsow
High

Special Terms and Conditions (7-2021)

DOCX, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVirginia Department of Energy
Contacts1 person available
OfficeN/A
Organization / AgencyVirginia Department of Energy
Office AddressN/A
Contacts
Jillian BullockEnergy Department Official

Full Description

Show more
The selected Contractor shall furnish all equipment, labor, materials, and resources for temporary patching of a section of road impacted by the Lynn Camp Project Phase II. The area is located at the intersection of State Route 655 and Birch Road. The Project coordinates are 37°19’50.05” N, 82˚08’47.29” W in area located near Grundy, VA.

More opportunities from Virginia Department of Energy

Same awarding agency

NAICS: 237990
SLED
Pen Hollow Landslide
Solicitation # 27AML05
Solicitation 27AML05, issued by the Virginia Department of Energy, seeks a contractor for the Pen Hollow Landslide Project located in Wise County, Virginia. The scope of work includes landslide stabilization, construction of drainage controls, relocation of a water line in accordance with Wise County PSA specifications, road upgrades for off-road trucks, and site revegetation. The contract will be awarded to the lowest responsive and responsible bidder, with award priority given to DSBSD-certified micro or small businesses. Bidders must submit their proposals electronically via eVA by October 30, 2026, and must include a Small Business Subcontracting Plan and a signed Abandoned Mine Lands Contractor Information Form to be considered responsive. The project requires the contractor to commence work within five calendar days of the Notice to Proceed, with a total performance period of 240 calendar days. Key compliance requirements include adherence to the Davis-Bacon Act, the Build America Buy America Act, and various occupational safety and health regulations. The contract mandates the provision of standard performance and labor and material payment bonds. Financial penalties for delays are set at $1,902.82 in liquidated damages per calendar day. Invoicing must be based on documented actual costs and actual units used, as the agency reserves the right to verify all quantities prior to payment. Materials must be delivered in original manufacturer packaging with legible identification, and any non-complying or damaged materials must be replaced at no cost to the owner.
Other Heavy and Civil Engineering Construction

POSTED

19 days ago

DEADLINE

in 2 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS