Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on October 8, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Magnuson Bldg 2 and 138 Roof and Structural Repair

Closed
PW#2025-003State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 4 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

The project involves comprehensive roof repairs and structural enhancements at Warren G. Magnuson Park, specifically targeting Building 2 and Building 138. The scope includes replacing the entire roof of Building 138, which covers approximately 7,173 square feet, and repairing the roof of Building 2 with the exception of the northern addition housing the Seattle Conservation Corps. Additionally, seismic improvements will be incorporated to meet current code requirements, and new fall protection systems, including fall arrest restraint devices, anchors, and horizontal lifelines, will be installed to ensure safety during maintenance activities. Building 406 will undergo select demolition and modifications to existing horizontal lifelines, with new anchors and lifelines installed as per the project plans. The project also features two additive components: overlaying the North Hangar Clerestory Roof and repairing the South Hangar Roof, with respective estimated costs of $364,107 and $603,633. The base bid is valued at approximately $1.5 million, with the total project located at Magnuson Park in Seattle, Washington. The solicitation was posted on October 8, 2025, with a response deadline of November 5, 2025, and is managed by the Washington Public Works agency.

General Info

Place of Performance

WA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Public Works
Contacts1 person available
OfficeN/A
Organization / AgencyWashington → Public Works
Office AddressN/A
Contacts

Full Description

Show more
Project Description: Repair the entire roof of Building 2 with the exception of the northern addition that houses the Seattle Conservation Corps. Install appropriate fall protection to allow for safe roof maintenance. Replace the entire roof on Building #138 (7173 sq ft.). Seismic improvements will also be incorporated into the project per code requirements. Fall arrest restraint devices will be included in the project. Building #406 will include select demolition and modification of existing horizontal lifelines. Installation of new fall protection anchors and horizontal lifelines per plan. Additive #1: North Hangar Clerestory Roof Overlay. Additive #2: South Hangar Roof Repairs. Engineer's Estimate: Base Bid: $1,503,110.00, Additive#1: $364,107.00, Additive#2: $603,633.00Project Location: WARREN G. MAGNUSON PARK, 7727 63rd Ave NE, Seattle, WA 98115 

More opportunities from Washington → Public Works

Same awarding agency

NAICS: 541330
New
SLED
2026 AC Water Main Replacement
Solicitation # 2026-RFQ-042
Solicitation 2026-RFQ-042 is a request for qualifications from the City of Mercer Island Public Works department for professional engineering services to design water system upgrades. The project focuses on replacing approximately 5,000 linear feet of aging asbestos cement water mains with ductile iron mains along SE 40th St and E Mercer Way. The scope is divided into two phases: Phase 1 involves water system and PRV vault replacement on SE 40th St from Greenbrier Ln to 97th Ave SE, and Phase 2 extends the replacement to 97th Ave SE and the 3700 and 3800 blocks of East Mercer Way. Additional components for replacement include fire hydrants and water services. The design must comply with the Reduction of Lead in Drinking Water Act and the City of Mercer Island Standard Details Water. The project follows a goal-based timeline with bid-ready plans for Phase 1 due by Q2 2027 and Phase 2 by Q3 2027, with overall construction completion targeted for Q2 2028. Qualified firms must be licensed in the State of Washington and submit a Statement of Qualifications limited to 12 pages, including a proposed timeline and three references from the last five years. Selection is at the sole discretion of the City, and the awarded firm will negotiate a scope and fee schedule using the City's standard professional services agreement. Administration is managed by the City Manager, with payments issued via City warrant within 45 days of receiving a proper monthly invoice.
Engineering Services

POSTED

3 days ago

DEADLINE

in 11 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS