Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Michigan was posted on March 13, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Mahany Fitness Center Gymnasium Divider

Closed
RFP #13-159State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
Demolition of Connex Box Structures and Removal of Debris
Solicitation # ACFD 26-03
The Alameda County Fire Department (ACFD) is soliciting sealed bids for solicitation number ACFD 26-03, focused on the demolition of Connex Box Structures and the removal of debris at 890 Lola Street in San Leandro, California. This is a stipulated sum, single-prime contract with a total project duration of 120 calendar days. Bids must be submitted by 2:00 pm on December 10, 2026, at 6363 Clark Ave., Dublin, California. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid amount. Required submission documents include a bid bond or security of 10 percent of the total bid price, a non-collusion declaration, a debarment form, and a designated subcontractors list. The successful contractor must provide 100 percent performance and payment bonds and adhere to California Public Works Contract requirements, including the payment of prevailing wages. Key operational requirements include the submission of a site security and logistics plan addressing tool control and working around inmates, as well as strict adherence to soil dust mitigation and hazardous materials procedures. Project milestones range from the initial kick-off meeting and equipment delivery to final site clearance. The contractor is also required to comply with the Americans with Disability Act and Title VII of the Civil Rights Act of 1964. All work is subject to inspection and potential rejection by the ACFD and the Construction Manager to ensure conformity with technical specifications and industry standards.
AC Fire Department

POSTED

about 6 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The project involves procuring and installing a new gymnasium divider curtain at the Mahany Fitness Center, with a focus on durability, safety, and operational efficiency. The curtain will measure approximately 70 feet in width and 45 feet in height at the center pitch, featuring a combination of solid vinyl material on the lower section for robustness and mesh on the upper part to facilitate visibility and airflow. Custom graphics will be incorporated into the design in collaboration with the City. The installation includes an electric winch system powered by a 2-3 HP motor, enabling smooth and quiet operation, complemented by a Power Touch Display relay panel that allows remote control from the front desk, enhancing convenience and safety. Safety features such as a lock system will prevent accidental movement when the curtain is raised, with all safety components adhering to relevant standards. The scope also covers the safe demolition and removal of the existing curtain, ensuring environmentally responsible disposal of debris. The new curtain will be securely installed, followed by comprehensive testing of all systems to confirm proper and safe operation. The contractor will provide training to City personnel on operating and maintaining the new system. All work must meet industry standards, with necessary permits obtained and coordination with the City to minimize disruptions. Upon completion, detailed documentation and as-built drawings are required. The project is valued between $50,000 and $150,000, with a response deadline of April 17, 2025, and is managed by the City of Roseville in California.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMichigan → City of Roseville
ContactsNo contacts available
OfficeN/A
Organization / AgencyMichigan → City of Roseville
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The purpose of this project is to procure and install a new gymnasium divider curtain, including all associated demolition, disposal, and electrical work as required. The scope of services for this project includes the following: 1. Design and Fabrication of Divider Curtain o Supply and install a gymnasium divider curtain with approximate dimensions of 70'-0" in width and a height of 45'-0" at the center pitch. o The curtain should feature an 8’-10’ solid vinyl material on the lower section for durability, with the upper section composed of mesh to allow visibility and airflow. o Curtain design should incorporate custom graphics as specified, with the graphics placement and design to be determined in collaboration with the City. 2. Electrical and Mechanical Specifications o Provide an electric winch system with a 2-3 HP motor for raising and lowering the divider curtain. The winch should be capable of smoothly operating the curtain with minimal noise and efficient performance. o Install a Power Touch Display electronic relay panel that enables operational control from the facility’s front desk. This will allow staff to raise or lower the divider remotely, ensuring user convenience and enhancing safety. 3. Safety and Security Features o Incorporate a safety lock feature in the winch system to prevent unintentional movement of the curtain when it is in the raised position. o Ensure that all safety components meet applicable standards and guidelines to prevent accidental lowering or potential hazards to facility users. 4. Demolition and Disposal of Existing Curtain o Safely dismantle and remove the existing gymnasium divider curtain, including any associated materials and components. o Dispose of all demolition debris in accordance with local regulations, ensuring an environmentally responsible removal process. 5. Installation and Testing o Install the new divider curtain, ensuring it is securely affixed and operates as designed. o Conduct thorough testing of the curtain system, including the winch, relay panel, and safety lock, to verify smooth and safe operation. o Provide training to designated City personnel on operating and maintaining the divider curtain and related control systems. Additional Requirements: • All materials and workmanship shall meet or exceed applicable industry standards. • The awarded contractor shall be responsible for obtaining any necessary permits and coordinating with the City for work scheduling to minimize disruptions. • Documentation and as-built drawings must be provided upon completion.

More opportunities from Michigan → City of Roseville

Same awarding agency

NAICS: 238210
New
SLED
Roseville Electric Utility - Electrical Maintenance
Solicitation # 07-133
The City of Roseville is soliciting proposals for Electrical Maintenance Services to support its power plant sites, specifically the Roseville Energy Park and the Roseville Sunset Energy Center. The selected contractor will provide qualified personnel, supervision, tools, and technical support to inspect, maintain, test, troubleshoot, repair, and replace electrical equipment. This is a prevailing wage project requiring adherence to California general safety orders and the provision of all necessary personal protective equipment. The initial contract term is five years, with a not-to-exceed amount and provisions for price renegotiation based on market fluctuations or catastrophic circumstances. The award will be based on a formal evaluation process weighing the proposed cost at 40 percent, the project plan and understanding at 35 percent, and the experience and qualifications of the firm and staff at 25 percent. Successful proposers must provide a 100 percent Faithful Performance Bond and a 100 percent Labor and Materials Bond. Key submission requirements include proof of registration with the California Secretary of State, DIR registration, and various certifications including the Levine Act Disclosure and a Non-collusion Declaration. Proposals are due by December 16, 2026, and must be submitted to the City Clerk via email or physical delivery in a sealed container.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

about 5 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 811310
New
SLED
RFP 07-135 Roseville Electric Utility – Air Compressor Maintenance
Solicitation # 07-135
The City of Roseville is soliciting proposals under RFP 07-135 for a consultant to provide comprehensive scheduled preventive and corrective maintenance for air compressors and auxiliary systems, including Ingersoll Rand equipment. The services will be performed at the Roseville Energy Park and Sunset Energy Center in California. The selected consultant will be responsible for providing all necessary labor, technical expertise, specialized tooling, and materials. This is a prevailing wage project with an initial contract duration of five years, estimated to commence in April or May. Proposals must be submitted by December 16, 2026, via email to the City Clerk or through physical delivery in a sealed container with the required Attachment H label. The award will be based on a formal evaluation panel process considering the firm's experience and qualifications (25 points), the proposed project plan (35 points), and cost (40 points), with potential interviews for top candidates. Requirements for the successful bidder include obtaining a City of Roseville business license, providing 100% faithful performance and labor and materials bonds, and maintaining specific insurance policies. Consultants must also disclose any conflicts of interest and adhere to the Levine Act regarding political contributions.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

about 5 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 238220
New
SLED
RFP 07-134 Roseville Electric Utility – Heat Exchange Maintenance
Solicitation # 07-134
The City of Roseville is soliciting proposals for heat exchange maintenance services for the Roseville Electric Utility, specifically covering equipment such as Alfa Laval, Tranter, and CPK shell and tube exchangers. The work will be performed at the Roseville Energy Park and Sunset Energy Center, with services estimated to commence in April or May. This is a competitive negotiation process where the award will be granted to the responsible proposer deemed most advantageous based on a formal evaluation of their experience and qualifications, project plan, and proposed cost. The resulting contract will span five years and requires the successful contractor to provide 100% Faithful Performance and Labor and Materials bonds. This is a prevailing wage project, and for contracts exceeding $25,000.00, certified payroll must be submitted with monthly invoices. Proposers must be registered with the California Secretary of State and the Department of Industrial Relations. Submission requirements are strict, requiring a sealed proposal by December 16, 2026, including several mandatory certifications and disclosures such as the Proposer's Certification, Levine Act Disclosure, and Non-collusion Declaration. Proposals may be submitted physically to the City Clerk or electronically via email, provided they adhere to a 25MB file size limit and do not use compressed formats.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 5 hours ago

DEADLINE

in about 2 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS