Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on September 17, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Maintenance Dredging Saco River

Awarded
W912WJ18B0023Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Agricultural INNOVATION Farm Project for San Marcos Unified SD
Solicitation # 2026-21
The San Marcos Unified School District is soliciting bids for the Agricultural INNOVATION Farm Project (Solicitation 2026-21) located at 99 Cassou Rd, San Marcos, California. The project scope involves the demolition of an abandoned electrical pole, water pump, and fencing, followed by the installation of underground water and electrical utilities, irrigation lines, a gravel service road, shade structures, storage containers, arbors, and designated planting areas. Work must be performed in strict accordance with the technical specifications, project drawings, and soil report. The estimated period of performance begins December 1, 2026, with a required completion date of April 1, 2027. The contract will be awarded to the lowest responsible bidder. Qualified bidders must hold a valid California Contractor's License and be registered with the California Department of Industrial Relations (DIR), as the project is subject to prevailing wage requirements. Submission requirements include a bid bond for 10 percent of the contract amount, a non-collusion declaration, and references, all submitted via the OpenGov e-procurement portal by November 2, 2026. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract value and adhere to a 3 percent Disabled Veteran Business Enterprise (DVBE) participation goal. All materials must be delivered in original packaging and comply with UL 969 marking and labeling standards.
Curriculum and Instruction

POSTED

about 10 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Water Treatment Plant Maintenance Package ‘A’ Degasifier Package (Project No. 25-4261A)
Solicitation # IFB-395-26-JM
The City of Hollywood, Florida, is soliciting bids for the Water Treatment Plant Maintenance Package A Degasifier Package (Project No. 25-4261A). The scope of work involves the replacement of packing media in three degasifiers (units 2, 3, and 4) at the Water Treatment Plant located at 3441 Hollywood Boulevard. Key deliverables include power washing the vessels, replacing media support grids and differential pressure gauges, performing vessel disinfection, and resealing access doors. To ensure continuous plant operation, the contractor must work on only one unit at a time. The project requires a contractor with a project manager possessing at least five years of experience and a track record of at least five similar degasifier servicing projects, as well as the provision of a factory-trained service technician for performance testing. Bids must be submitted electronically via the OpenGov portal by November 4, 2026, at 3:00 PM. The contract will be awarded to the lowest responsive and responsible bidder. Financial requirements include a bid guarantee of 5 percent of the bid amount and the provision of performance and payment bonds. Comprehensive insurance coverage is mandated, including general liability, pollution liability, and vehicle liability, with the City of Hollywood named as an additional insured. The project timeline specifies substantial completion within 180 days and final completion within 210 days, with liquidated damages set at 500 dollars per day. Additionally, the contractor must comply with federal prevailing wage requirements for Broward County and provide a twelve-month warranty against poor workmanship and faulty materials.
Public Utilities

POSTED

about 12 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, New England District, issued an unrestricted competitive solicitation, number W912WJ18B0023, for the maintenance dredging of the Saco River Federal Navigation Project in Biddeford and Saco, Maine. With an estimated construction cost between 1,000,000 and 5,000,000 dollars and falling under NAICS code 237990, the project requires both hydraulic and mechanical dredging to restore authorized dimensions. The primary scope involves hydraulically dredging approximately 41,000 cubic yards of material from an 8-foot deep entrance channel and three 6-foot deep anchorages, with sandy shoal material being pumped roughly 8,000 feet north to Camp Ellis Beach. An additional contract option includes the mechanical dredging of approximately 22,000 cubic yards from the 8-foot deep channel and 6-foot deep maneuvering basin in Saco city center, with material hauled 1.25 miles south to an in-river disposal site. To comply with environmental time of year restrictions, all operations were scheduled to be performed between November 15, 2018, and March 15, 2019. Due to the tight window and tidal influences, the government established strict responsibility criteria requiring contractors to demonstrate a proven track record of hydraulic dredging at a mean average of 28,000 cubic yards per 30-calendar day period and successful beach placement of sand within an intertidal area within the last seven years. The solicitation process began in August 2018, with bids opened on September 17, 2018, and included detailed technical specifications, geotechnical data, and comprehensive dredging plans.

General Info

Contract Value

$3,982,718.8

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Saco River, SACO, ME, 04072, USA

Set-Aside

NONE

Award Issued Date

Documents

7

Maintenance Dredging Saco River - Construction Solicitation and Specifications

PDF, High priority: read this firstspecifications
High

Maintenance Dredging Saco River Construction Solicitation and Specifications

PDF, High priority: read this firstspecifications
High

Saco River Maintenance Dredging Plans - Solicitation W912WJ18B0023

PDF, High priority: read this firstspecifications
High

Saco River Maintenance Dredging Plans - W912WJ18B0023

PDF, High priority: read this firstspecifications
High

Solicitation W912WJ18B0023 - Maintenance Dredging Saco River

PDF, High priority: read this firstifb
High

W912WJ18B0023 Amendment 0001

PDF, High priority: read this firstamendment
High

Abstract of Offers - W912WJ18B0023

PDF, Low priorityabstract-of-offers
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Response deadline added: Sep 17, 2018. The point of contact changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist New England
Contacts1 person available
OfficeCONCORD, MA, 01742-2751, USA
Office AddressCONCORD, MA, 01742-2751, USA
Contacts
Heather SkorikContract Specialist

Full Description

Show more
The U.S. Army Corps of Engineers, New England District will be issuing an Invitation for Bids for Maintenance Dredging of the Saco River Federal Navigation Project, Biddeford & Saco, ME. This will be an unrestricted competitive solicitation requiring a hydraulic and mechanical dredge to perform the work. The NAICS code for this procurement is 237990. The estimated construction cost is between $1,000,000.00 and $5,000,000.00. Any responsible source meeting this standard may submit a bid to be considered by the New England District. The proposed project consists of hydraulically dredging a portion of the Federal navigation project (FNP) at the mouth of the Saco River which includes an 8-foot deep entrance channel, and three 6-foot deep anchorages (below Mean Lower Low Water). Approximately 41,000 cubic yards (CY) of required dredging, with another 36,000 CY of 1-ft allowable over depth dredging would bring these areas back to their authorized dimensions. Sandy shoal material dredged from the mouth of the river will be pumped approximately 8,000 ft. north to Camp Ellis Beach. The work in this area will require significant coordination around the tide cycles. Additionally a contract option to mechanically dredge a portion of the FNP's 8-foot deep channel, and 6-foot deep maneuvering basin at the city center of Saco is included. Approximately 22,000 CY of required, and another 13,000 CY of 1-ft allowable over depth of predominantly fine grain sand and silty shoal material will be completed by mechanical dredge and hauled 1.25 mile south to a previously used in-river placement site for disposal. Dredging and disposal operations will be performed between November 15, 2018 and March 15, 2019 to meet environmental time of year (TOY) restrictions. In order to accomplish all dredging requirements within the specified dredging window the Government will include definitive responsibility criterion requiring the Contractor to demonstrate experience dredging at least a mean average of 28,000 cy in a 30-calendar day period via hydraulic dredge on at least one (1) project in a tidal-influence area in the last seven (7) years, and demonstrate successful completion of beach placement of sand material within an intertidal area within the last seven (7) years. Failure to meet these criterion will result in the low bidder being found not responsible, and award will be made to the next low bidder who is found to be responsive and responsible. The low bidder shall be asked to provide documentation of its ability to meet this definitive responsibility criterion via self-performance or acceptable business arrangement. Environmental coordination and permitting have been completed by the U.S. Army of Engineers, New England District. This is not an invitation for bids at this time. The solicitation requirements and contract documents to include instructions for submission and the response date will be available on or about Aug 10, 2017 and will be available for downloading by accessing the Federal Business Opportunities website (http:/www.fbo.gov). Please note this solicitation will be UNRESTRICTED. In order to view this solicitation, prospective contractors are required to self-register their firm with federal Business Opportunities (go to http:/www.fbo.gov and register under Vendor/Citizen). Amendments, if any, to the solicitation will be made available at the http:/www/fbo.gov website. Neither telephonic, mailed nor fax requests will be accepted. Registrants are responsible for the accuracy of the information on the FEDBIZOPPS Registration List.

More opportunities from Department Of Defense → W2SD Endist New England

Same awarding agency

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between 80 million and 100 million dollars, with a solicitation expected around March 15, 2027. Construction is slated to begin in September 2027 and span approximately two years, divided into two dredging seasons ending August 31, 2029. The scope involves the mechanical dredging of approximately 5.5 million cubic yards of material using closed clamshell buckets. The work is divided into two primary sequences. First, the contractor must construct a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, which includes digging an access channel and excavating 3.2 million cubic yards of material for disposal at four designated sites. Second, the contractor will perform maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth, removing approximately 2.3 million cubic yards of material to be placed in the newly constructed CAD cell. Strict operational requirements include maintaining a production rate of 300,000 cubic yards every 30 calendar days, working 24 hours a day, 7 days a week. All activities must adhere to prescribed environmental windows to protect aquatic wildlife, and extensions to these windows are not permitted. Interested firms must demonstrate experience with mechanical dredging at the required production rate and open water placement in New England during winter months. Capabilities packages are due by December 3, 2026.
Other Heavy and Civil Engineering Construction

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS