Manufacture of floating docks and steel components – Malbay St-George, QC
Closed
30007077CanadaSubmission Closed
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
Government of Canada → Department of Fisheries and OceansView Agency
NAICS
N/A
Place of Performance
*Quebec (except NCR) *Canada, CANSet-Aside
NONE
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
PhaseClosed
Submission Closed
Organization & Contact Information
Show more
AgencyGovernment of Canada → Department of Fisheries and Oceans
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Full Description
Show more
Manufacture of floating docks and accessories for the fishing harbour of Malbay St-George in the Gaspesia Region includes, without limitation, the supply of all materials and labor for the manufacture of the various types of floating dock and galvanized steel accessories according to the indications in drawings and specs, the manufacture of concrete blocks to fix anchor arm and the delivery of materials to the Malbay St-George fishing harbor in the Gaspesia Region.
Familiarization with Site:
Before submitting a bid, it is recommended that bidders visit the site and its surroundings, at their own expense and schedule, to review and verify the form, nature and extent of the work, materials necessary for the completion of the works, the means of access to the site, severity, exposure and uncertainty of weather, soil conditions, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies and other circumstances which may influence or affect their bid. No allowance shall be made subsequently in this connection on account of error or negligence to properly observe and determine the conditions that will apply.
Take all appropriate safety measures before any visit to site, either before or after acceptance of bid.
The Contractor must perform and complete the Work by December 19, 2025.
Security Requirement:
There is no security associated with this requirement.