Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Martinez Refinery Renewable Fuels Project Final Revised EIR

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Martinez Refinery Renewable Fuels Project, managed by Marathon Petroleum Corporation and overseen by Contra Costa County, involves repurposing the Martinez refinery to produce renewable diesel, propane, naphtha, and potentially aviation fuel from renewable feedstocks instead of crude oil. The project scope includes the installation of new equipment and storage tanks, the modification of existing units, and the decommissioning of crude oil processing equipment that cannot be repurposed. Upon completion, the facility is expected to process approximately 48,000 barrels per day of fresh renewable feeds. The project is governed by the California Environmental Quality Act (CEQA), with a Final Revised Environmental Impact Report certified on June 24, 2025, and a Notice of Determination filed on August 12, 2025. Key regulatory oversight is provided by the Contra Costa County Department of Conservation and Development and the Bay Area Air Quality Management District. Performance requirements focus on emissions reduction, compliance with BAAQMD and EPA AP-42 standards, and the implementation of a Mitigated Monitoring Reporting Program. Administrative activities, including the payment of EIR and filing fees, are processed through the Contra Costa County Clerk-Recorder’s Office.

General Info

Modify flare routing for foul water strippers, update oxidizer heating value, maintain emissions within permits under regional air rules.

Agency

California → Contra Costa County

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

Arnold Industrial Way, Martinez, CA, 94553

Set-Aside

NONE

Documents

(3)

Notice of Determination for Martinez Refinery Renewable Fuels Project CDLP20-02046

PDFnotice-of-determination

Addendum to Final EIR for Martinez Renewable Fuels Facility

PDFenvironmental-impact-report-addendum

Notice of Determination for Martinez Refinery Renewable Fuels Project - Application 720986

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Contra Costa County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Contra Costa County
Office AddressN/A
Contacts
Joseph LawlerSenior Planner
Bao TrinhSenior Air Quality Engineer

Full Description

Show more
This permit action is to issue an Authority to Construct (ATC) to Tesoro Refining & Marketing Company LLC for changes in permit conditions at S-1600 Foul Water Strippers/A-2000 Thermal Oxidizer, at the Martinez Renewable Fuels Facility. Page 2 of 3 Tesoro proposes to allow for alternative control scenarios for the S-1600 Foul Water Strippers (FWS) to route the gas stream to the existing flare header system when the FWS’s A-2000 Thermal Oxidizer (TO) is not available as a control device. Additionally, Tesoro is applying to update the A-2000 Thermal Oxidizer potential to emit (PTE) representations to reflect the current as-built specifications of the TO’s higher heating value. Increases in criteria pollutants for nitrogen oxides (NOx), carbon monoxide (CO), precursor organic compounds (POC), sulfur dioxide (SO2), and particulate matter (PM10 and PM2.5) and toxic air contaminant (TAC) emissions are expected as a result of this project. The routing of FWS offgas to the fuel gas is an alteration and the maximum 500 hours per year of operation is not expected to result in an increase in emissions. The facility has sufficient flare gas recovery compressor capacity to recover the additional flow rate from the FWS when the TO is offline. The changes do not result in an increase in potential to emit emissions at each process heater and boiler within the fuel gas system because all equipment within the fuel gas system were evaluated at the max firing rate capacity for each unit. To ensure the equipment all remain altered, daily and annual nitrogen oxide (NOx) and sulfur dioxide (SO2) emission limits will be imposed for each unit.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS