Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Marysville Boulevard Vision Zero Safety Project (115216301)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Sacramento is advancing safety enhancements along Marysville Boulevard between Arcade Boulevard and Los Robles Boulevard under its Vision Zero initiative, focusing on reducing traffic-related fatalities and injuries. The project includes transforming the corridor from four lanes to two travel lanes with protected bicycle lanes, closing gaps in existing bike infrastructure, and installing video and loop detection systems at the intersections of Marysville Boulevard with South Avenue and Grand Avenue. Minor median curb adjustments will be made at Roanoke Avenue, the roadway will receive a full slurry seal, and new signage and pavement markings will be implemented. The work is being executed by city personnel under the Department of Public Works, with no external contractor involved, and is supported by state-level environmental exemptions under CEQA Sections 15301(c) and 15304(h), which classify the project as a minor alteration to existing facilities and the addition of bicycle infrastructure within an established right-of-way. All performance occurs within Sacramento, California, at the specified locations along Marysville Boulevard and its intersecting streets. While the project has been formally posted with a date of September 12, 2025, and is associated with a project identifier and environmental exemption documentation, there is no published solicitation number, contract value, or formal procurement structure. No federal contracting clauses, evaluation factors, invoicing systems, packaging requirements, or standard contract types such as FFP or IDIQ are present, as this is a local public works initiative administered under California law. The primary point of contact is Luke Fuson, Senior Engineer, who oversees the project alongside Charlie Tschudin from the Planning Division. A $50 environmental filing fee was paid to the California Department of Fish and Wildlife, but no other financial details, accounting codes, or payment procedures for the project’s construction budget are disclosed. The project relies on state statutory and regulatory exemptions rather than federal procurement standards, with no UEI, CAGE, socioeconomic certifications, or federal reporting obligations applicable due to its nature as a municipal improvement.

General Info

Sacramento adds bike lanes, traffic sensors, and slurry seal on Marysville Blvd under Vision Zero, using city staff and state exemptions.

Agency

California → City of Sacramento

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Marysville Boulevard between Arcade Boulevard and North Avenue, Sacramento, CA

Set-Aside

NONE

Documents

(1)

Marysville Boulevard Vision Zero Safety Project Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Sacramento
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Sacramento
Office AddressN/A
Contacts
Luke FusonSenior Engineer

Full Description

Show more
This project proposes safety improvements along Marysville Boulevard between Arcade Boulevard and Los Robles Boulevard, in accordance with its Vision Zero program. Improvements include a road diet from four to two lanes, bicycle lane gap closures, upgrading existing bike lanes to protected bike lanes, installing video and loop detection modifications and associated equipment at the intersection of Marysville Boulevard at South Avenue and Grand Avenue, minor median curb modifications at the intersection of Marysville Blvd at Roanoke Ave; slurry sealing the roadway; and installing signing and striping improvements.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
LACSD Surface Water PFAS Removal Project No. 251, CA
Solicitation # lacsd-surface-water-pfas-removal-project-no-251-ca
The contract involves the design and construction of PFAS treatment facilities at the Bernina and Cedar Glen Water Treatment Plants in California, encompassing comprehensive civil, structural, mechanical, electrical, instrumentation, and process system upgrades to remove per- and polyfluoroalkyl substances from surface water. The scope requires integrated engineering solutions to meet evolving regulatory standards for drinking water safety, with specialized focus on advanced filtration and extraction technologies tailored to the existing infrastructure at both sites. Work will include site-specific modifications to ensure seamless operational integration while maintaining continuous water service during implementation. This solicitation, issued by Pyramid Building & Engineering, Inc., is designated for Disadvantaged Business Enterprises under the Department of Transportation set-aside program and falls under NAICS code 237310 for Water and Wastewater Pipeline and Related Structures Construction. Proposals must be submitted by September 3, 2026, with primary point of contact John Garrison available for inquiries via phone or email. The project is located entirely within California, with no specified city or zip details provided in the public record, and all contractual obligations are tied to performance at the two designated treatment plants. Participation is open to qualified firms seeking to support critical public health infrastructure improvements in compliance with state and federal water quality mandates.
Pyramid Building & Engineering, Inc.

POSTED

about 5 hours ago

DEADLINE

in 26 days
View Details