Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on December 28, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Material Supply for Water/Sewer Construction

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 423330
SLED
FPCM-COR-I-001054-118-309A-RS Roof Replacement
Solicitation # FPCM-COR-I-001054-118-RS
The California Department of Corrections and Rehabilitation is soliciting bids for solicitation number FPCM-COR-I-001054-118-RS for a materials-only purchase of a complete roofing system for the California State Prison, Corcoran, specifically focusing on Building 309A Central Kitchen Phase 1. This is a product-only procurement where the State will handle all installation. The required system must feature a thermoplastic Polyvinyl-Chloride (PVC) roofing membrane, extruded polystyrene (XPS) insulation, and necessary adhesives and sealants. All proposed assemblies must be FMGI approved with a current RoofNav report and include a standard ten-year full system manufacturer warranty. Bids are due by December 17, 2026, at 2:00 PM and must be submitted using the State's official bid forms to Roberta Sanchez. Required documentation includes a detailed materials list, product cut sheets, and a completed Roof System Review Checklist. Prospective bidders must attend a mandatory walk-thru and ensure they can obtain necessary security clearances for delivery within the secure perimeter of the facility. The contract will be awarded to the lowest responsible bidder, with specific preferences available for California Certified Small Businesses and Disabled Veteran Business Enterprises. Materials must be delivered FOB Destination to the project site in original, undamaged manufacturer containers.
California Department of Corrections & Rehabilitation

POSTED

about 1 month ago

DEADLINE

in about 1 month
NAICS: 423330
SLED
FPCM-SVSP-I001020-103-KM COMPLETE ROOFING SYSTEM
Solicitation # FPCM-SVSP-1001020-103-KM
The California Department of Corrections and Rehabilitation is soliciting bids for a product-only purchase of complete roofing systems for Buildings 420 and 461 at Salinas Valley State Prison. This procurement is for materials only, as the state will handle installation. The required system consists of an 80 mil adhered polyvinyl chloride (PVC) thermoplastic membrane with factory-applied felt backing, XPS tapered insulation, gypsum sheathing, membrane flashings, fasteners, anchors, and protection walk pads. The project covers approximately 6,165 square feet for Building 420 and 31,329 square feet for Building 461. All materials must meet FM Global standards for wind uplift and insulation adhesive, and the supplier must provide a manufacturer's standard ten-year full system warranty with no dollar limit. Bids are due by December 2, 2026, and must be submitted as F.O.B. Destination. Prospective bidders are required to attend a mandatory walk-through and must provide a detailed materials list, product cut sheets, and a completed Roof System Review Checklist. Award will be made on an all-or-none basis, with preferences given to California certified Small Businesses and Disabled Veteran Business Enterprises. Due to the location of performance, the supplier must obtain necessary security clearances for gate access to the prison. Final delivery, inspection, and acceptance will take place at Salinas Valley State Prison in Soledad, California.
California Department of Corrections & Rehabilitation

POSTED

2 months ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The City of San Diego is seeking a subcontractor for the supply of pipes, valves, fittings, and other materials essential for water and sewer construction. All provided materials must be ASTM-compliant, and the selected vendor is required to provide certified submittals and formal notice regarding any material substitutions. This subcontract opportunity falls under NAICS code 423330 and was posted on December 28, 2023. Interested parties must submit their responses by the deadline of February 14, 2024.

General Info

San Diego seeks ASTM-compliant water and sewer materials subcontractor by February 14, 2024.

Documents

This scope was carved out of K-24-2238-DB1-3.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Normal Heights Improv 1

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Roof Decking for Habitat StructuresOpen now, due in 15 days
  • TPO Roofing Materials SupplierOpen now, due in 11 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Diego
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply pipes, valves, fittings, and other ASTM-compliant materials for water and sewer construction with certified submittals and substitution notice.

More opportunities from California → City of San Diego

Same awarding agency

NAICS: 237110
SLED
Pump Station 2 Improvements And Modernization
Solicitation # K-27-2502-DBB-3-C
The City of San Diego is soliciting bids for the Pump Station 2 Improvements and Modernization project, identified as solicitation K-27-2502-DBB-3-C. This phase-funded construction contract focuses on enhancing the station's reliability and operability through the replacement of eight pumps, six motor controllers, and associated instrumentation and monitoring systems. The scope of work includes the installation of Variable Frequency Drives and reduced voltage soft starters, rehabilitation of suction and discharge piping, and structural repairs to Wet Wells 1 and 2, influent channels, and discharge header systems. Additional requirements involve HVAC and ventilation upgrades, architectural modifications to the VFD room, and the repair of exterior building elements. The project must be completed within 1,452 working days, with construction activities for each phase commencing only upon receipt of a separate Notice to Proceed. The contract will be awarded to the lowest responsible and reliable bidder based on the base bid and any proposed alternates. Bidders must adhere to the 2024 editions of the Greenbook and the City of San Diego Whitebook, as well as Build America Buy America requirements and prevailing wage rates. The project is subject to a Project Labor Agreement and requires a drug-free workplace certification. Payment for major equipment is structured across six milestones, ranging from purchase order and fabrication to final performance verification. Awardees must provide payment and performance bonds, as well as insurance certificates, within ten working days of the Notice of Intent. Evaluation of the apparent low bidder includes a review of electronic bid documents, corporate existence evidence, and compliance with subcontractor listing requirements for any entity performing more than 0.5 percent of the total bid.
Water and Sewer Line and Related Structures Construction

POSTED

18 days ago

DEADLINE

in 23 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS