Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Specialized Fastener Supply

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Specialized Fastener Supply subcontract involves the provision of specific hardware for prime contractors working on County of San Mateo projects. The scope of work requires the supply and delivery of Simpson Strong Tie MSTA series strap ties and hot dipped galvanized steel carriage bolts directly to the project site in Redwood City, California. This opportunity was posted on November 4, 2026, with a response deadline of December 10, 2026. Classified under NAICS code 423330, the contract focuses on the procurement of specialized fasteners to support regional infrastructure or construction efforts managed by the agency.

General Info

Supply Simpson Strong Tie straps and galvanized bolts for San Mateo County projects.

Place of Performance

Redwood City, CA, 94063, USA

Set-Aside

NONE

Documents

This scope was carved out of 2027-RFP-00200.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

(RFP) for Roofing Job Order Contracts (JOC 2710 and 2711) - Class C39 License

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → County of San Mateo
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies galvanized strap ties and carriage bolts for prime contractors on County of San Mateo projects. Provides Simpson Strong Tie MSTA series strap ties and Hot Dipped Galvanized Steel carriage bolts. Delivers hardware to the project site.

Similar Contracts

Same NAICS industry code

NAICS: 423330
SLED
FPCM-COR-I-001054-118-309A-RS Roof Replacement
Solicitation # FPCM-COR-I-001054-118-RS
The California Department of Corrections and Rehabilitation is soliciting bids for solicitation number FPCM-COR-I-001054-118-RS for a materials-only purchase of a complete roofing system for the California State Prison, Corcoran, specifically focusing on Building 309A Central Kitchen Phase 1. This is a product-only procurement where the State will handle all installation. The required system must feature a thermoplastic Polyvinyl-Chloride (PVC) roofing membrane, XPS extruded polystyrene insulation, and necessary adhesives and sealants. All proposed assemblies must be FMGI approved with a current RoofNav report and include a standard ten-year full system manufacturer warranty. Bids are due by December 17, 2026, at 2:00 PM and must be submitted using the State's official bid forms to avoid being deemed non-responsive. Prospective bidders are required to attend a mandatory walk-thru and must provide a detailed materials list, product cut sheets, and a completed Roof System Review Checklist. Delivery is FOB Destination to the prison site, with a general delivery window of 90 days following the Notice to Proceed and submittal approval. Due to the nature of the facility, suppliers must obtain necessary security clearances for personnel entering the secure perimeter. The contract will be awarded to the lowest responsible bidder, with specific preferences and incentives available for California Certified Small Businesses and Disabled Veteran Business Enterprises. All materials must be delivered in original, undamaged manufacturer containers and meet strict ASTM, UL, and FM Global standards.
California Department of Corrections & Rehabilitation

POSTED

22 days ago

DEADLINE

in about 1 month
View Details
NAICS: 423330
SLED
FPCM-SVSP-I001020-103-KM COMPLETE ROOFING SYSTEM
Solicitation # FPCM-SVSP-1001020-103-KM
The California Department of Corrections and Rehabilitation is soliciting bids for a material-only purchase of complete roofing systems for Buildings 461 and 420 at Salinas Valley State Prison. The scope of work involves providing all necessary materials and fabrication, including 80 mil adhered white PVC thermoplastic membranes with factory-applied felt backing, XPS tapered insulation, gypsum sheathing, and various flashing and sheet metal products. Building 461 covers approximately 31,329 square feet, while Building 420 covers approximately 6,165 square feet. The state will handle the installation, but the supplier must provide a manufacturer's standard ten-year full system warranty with no dollar limit, which will be finalized upon installation and acceptance by a manufacturer's representative. Bids are due by November 10, 2026, and must be submitted on an all-or-none basis. Prospective bidders are required to attend a mandatory walk-thru and must provide a detailed materials list, product cut sheets, and a completed Roof System Review Checklist. All materials must meet FM Global listings for wind uplift and insulation adhesive standards. Deliveries are FOB Destination to Salinas Valley State Prison in Soledad, California, and require proper security clearances for personnel entering the secure perimeter. Preference in award may be given to California certified Small Businesses and Disabled Veteran Business Enterprises.
California Department of Corrections & Rehabilitation

POSTED

about 2 months ago

DEADLINE

in 5 days
View Details
NAICS: 423330
SLED
FPCM-HDSP-I001066-PH2-148-KR Roof Replacement for HDSP
Solicitation # FPCM-HDSP-I001066-PH2-148-KR
The California Department of Corrections and Rehabilitation is soliciting bids for a product-only purchase of a complete roofing assembly for Building 352 at High Desert State Prison in Susanville, California. This procurement is strictly for materials and fabrication, with the state handling all installation. The required system consists of an 80 mil adhered polyvinyl chloride PVC thermoplastic roofing membrane with factory-applied felt backing to cover approximately 31,000 square feet, along with necessary insulation, sheet metal, and adhesives. Key technical requirements include compliance with CCR Title 24 fire hazard standards, FM Global listings for wind uplift, and a 10-year full system warranty. The successful bidder must also provide technical assistance, including on-site inspection, testing, training, and certification of staff by a manufacturer's representative. Bids must be submitted by November 5, 2026, at 2:00 PM via email to Kirsten Ruesch or through the US Postal Service. All responses must use the state's official bid forms and quote F.O.B. Destination terms; any reference to a supplier's own terms and conditions will result in the bid being rejected as non-responsive. Required documentation includes a detailed materials list, product cut sheets, a completed Roof System Review Checklist, and various certifications regarding non-discrimination and small business status. Award will be made on an all-or-none basis. Additionally, the supplier is responsible for obtaining necessary security clearances for site access and must provide Material Safety Data Sheets upon delivery.
California Department of Corrections & Rehabilitation

POSTED

about 2 months ago

DEADLINE

in about 3 hours
View Details

More opportunities from California → County of San Mateo

Same awarding agency

NAICS: 238330
New
SLED
(RFP) for Flooring Job Order Contracts (JOC 2712 and 2713) - Class C15 License
Solicitation # 2027-RFP-00201
The County of San Mateo is soliciting proposals under RFP No. 2027-RFP-00201 to award up to two Job Order Contracts (JOC 2712 and 2713) for flooring services. Eligible bidders must hold an active Class C15 License and maintain a staffed office within the County of San Mateo or within 55 miles of Redwood City. The scope of work encompasses a broad range of construction tasks across CSI Divisions 01-09, specifically focusing on the installation and remediation of wood, resilient, carpet, terrazzo, brick, and stone flooring, as well as concrete work and hazardous material remediation. Each contract has a one-year term with a maximum value of 2,000,000 dollars per JOC. Work is issued via separate Job Orders, and contractors must adhere to OSHA safety requirements and straight-time prevailing wage rates. Award selection is based on the lowest Evaluation Criteria Figure (ECF), which considers weighted adjustment factors. Bidders must provide a 25,000 dollar bid security and are required to maintain performance and payment bonds starting at 250,000 dollars, with increases required if total Job Orders exceed 1,000,000 dollars. Technical requirements include strict adherence to California Department of Public Health VOC emission standards and various ASTM and ACI specifications for materials and formwork. Proposals must be submitted electronically in PDF format by the specified deadline, including confirmation of SAM registration and a Unique Entity ID.
Flooring Contractors

POSTED

1 day ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS