This Solicitation opportunity from Florida was posted on September 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The City of Lakeland is soliciting proposals for the replacement of the cooling water distribution system at the McIntosh Power Plant's eight-cell, back-to-back counterflow cooling tower. The project involves the demolition and removal of existing header piping, lateral piping, and spray nozzles, as well as the removal and reinstallation of drift eliminators. All work must be completed during a strict window of the Spring 2027 outage, with the cooling tower released on April 30, 2027, and required to be fully operational by May 17, 2027. Contractors are expected to provide all labor, supervision, materials, and equipment, ensuring all installations align with provided technical drawings and site safety standards.
Proposals are due by 4:00 pm on October 14, 2026, via the OpenGov portal. Award selection is based on a 100-point scale evaluating qualifications and relevant experience (30%), pricing (30%), technical approach (20%), and project schedule and staffing. Mandatory submission requirements include a signed and notarized indemnification agreement, a human trafficking affidavit, a drug-free workplace certification, and proof of insurance. Special operational requirements include strict adherence to OSHA 1910.180 for crane operations, mandatory lift plans for critical loads, and a safety audit process focusing on an EMR below 1.0. The contract is governed by Florida law with jurisdiction in Polk County.
General Info
Lakeland seeks proposals for McIntosh Power Plant cooling system replacement by May 2027.
HighAI Summary for 2026 RFP120: McIntosh Power Plant Cooling Tower Distribution System Replacement: Request for Proposal (RFP No. 2026 RFP120) issued by the City of Lakeland on September 18, 2026, for the replacement of the McIntosh Power Plant Cooling Tower Distribution System. The document outlines the scope of work, submission requirements via the OpenGov portal, and selection criteria. The deadline for questions is October 6, 2026, and the final response deadline is October 14, 2026, at 4:00 pm.
PDF
PDF, High priority: read this first45 pages · rfp
HighAI Summary for 2026 RFP120: McIntosh Power Plant Cooling Tower Distribution System Replacement: The City of Lakeland is soliciting sealed proposals for the replacement of the McIntosh Power Plant Cooling Tower Distribution System. Released on September 18, 2026, the RFP requires electronic submissions via the OpenGov portal by October 14, 2026, at 4:00 pm. The document outlines the scope of work, selection criteria, insurance and safety requirements, and includes various technical attachments and pricing proposal requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 25-0801-4001 - Ceramic Cooling Tower Specifications: Technical specifications and engineering drawings for a Ceramic Cooling Tower, including plan views, elevations, cylinder ejection punch details, and a schedule of delay penalties. Document is attributed to Ceramic Cooling Tower Corporation (2000).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Ceramic Cooling Tower Corporation - Distribution Installation (P-00028B): Technical installation and distribution drawing/specification for a cooling tower system by Ceramic Cooling Tower Corporation. The document includes plan views, plate details (A-G), skew rod specifications, and stand pipe details under document number P-00028B.
PDF
PDF, High priority: read this first6 pages · contract-document
HighAI Summary for City of Lakeland Purchase Order Terms and Conditions: This document contains the City of Lakeland Purchasing Division's Terms of Agreement for purchase orders. It outlines seller warranties, inspection rights, indemnity clauses, compliance with laws, transportation charges, change orders, cancellation rights, governing law, payment terms under the Florida Prompt Payment Act, public records requirements under Florida Statutes Chapter 119, and FEMA required contract clauses. The document serves as a binding contract specifying the terms and conditions governing purchase orders issued by the City, ensuring legal compliance and protection for both parties.
PDF
PDF, High priority: read this first7 pages · contract-document
HighAI Summary for City of Lakeland Standard Contract Form 2026: This document is the City of Lakeland's Standard Contract Form for 2026, establishing an agreement between the City and a contractor for specified services. It outlines terms including scope of services, contract duration with renewal options, amendment procedures, assignment and subcontracting restrictions, cancellation rights, compensation terms, ownership of documents, permit requirements, record access and audit rights, and compliance with Florida public records laws. The contract references incorporated documents such as the Invitation to Bid or Request for Proposal, Scope of Services (Exhibit A), and cost proposal appendices. It is intended to formalize the contractual relationship and ensure compliance with applicable laws and City policies.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Distribution System Installation - Bill of Material: Technical installation document and Bill of Materials for a distribution system by Ceramic Cooling Tower Corporation. Includes dimensional data, nozzle specifications, and a parts list for XRPM fill materials.
DOC
DOC, High priority: read this first2 pages · contract-document
HighAI Summary for Indemnification Agreement 2026 Contractor: This document is an Indemnification Agreement for contractors working with the City of Lakeland, dated 2026. It outlines the contractor's obligation to defend, indemnify, and hold harmless the City and its representatives from liabilities arising from negligence or misconduct during contract performance. The agreement includes provisions for waiver of subrogation, release of liability upon final payment, and compliance with Florida laws. It specifies applicability by timeframe or project and requires signatures and notarization to validate the agreement.
PDF
PDF, Low priority1 page · contractor-audit-form
LowAI Summary for City of Lakeland Contractor Audit Form: This document is the City of Lakeland's Risk Management and Purchasing Contractor Audit Form. It is used to audit contractors on various safety and compliance items such as EMR, drug and alcohol policy, written safety plan, safety compliance program, safety records, employee training records, and onsite safety performance. The form includes fields for audit results, comments, and approval status for continued inclusion on the approved contractors list. It also requires auditor information and signature.
DOCX
DOCX, Low priority1 page · affidavit
LowAI Summary for Human Trafficking Affidavit for City of Lakeland Contract Compliance: This Human Trafficking Affidavit, compliant with Section 787.06(14) of Florida Statutes, must be completed by an officer or representative of a nongovernmental entity contracting with the City of Lakeland, Florida. The affidavit attests that the entity does not use coercion for labor or services and commits to notify the governmental entity if such practices occur in the future. It includes sections for company information, authorized signature, and notarization details. The document serves as a legal attestation under penalty of perjury to ensure ethical labor practices in contracts with the City.
DOCX
DOCX, Low priority2 pages · contract-document
LowAI Summary for Indemnification Agreement 2026 Contractor FDOT: This document is an Indemnification Agreement for contractors working with the State of Florida Department of Transportation and the City of Lakeland. It outlines the contractor's obligation to defend, indemnify, and hold harmless the State, City, and their agents from liabilities arising from negligence or misconduct during contract performance. The agreement includes provisions for waiver of subrogation, release of liability upon final payment, and compliance with Florida laws, specifically Sections 725.06 and 725.08 of the Florida Statutes. It allows the contractor to specify the applicable timeframe or project for the indemnification and requires notarized acknowledgment.
DOC
DOC, Low priority2 pages · contract-document
LowAI Summary for Indemnification Agreement 2026 Vendor: This document is an Indemnification Agreement for the year 2026 between a Vendor and the City of Lakeland. It outlines the Vendor's obligation to defend, indemnify, and hold harmless the City and its representatives against liabilities arising from the Vendor's acts related to the product or service provided. The agreement includes provisions on subrogation waiver, release of liability upon final payment, and compliance with Florida laws, specifically Sections 725.06 and 725.08 of the Florida Statutes. It allows the Vendor to specify the applicable timeframe or project(s) for the indemnification. The document requires signatures from the Vendor's authorized officer and a notary acknowledgment.
DOC
DOC, Low priority2 pages · contract-document
LowAI Summary for Indemnification Agreement for Consultant Services 2026: This document is an Indemnification Agreement for Consultant services related to contracts, purchase orders, or task authorizations with the City of Lakeland for the year 2026. It outlines the consultant's obligation to indemnify and hold harmless the City and its employees from liabilities caused by the consultant's negligence or wrongful conduct. The agreement includes provisions on subrogation waivers, release of liability upon final payment, and compliance with Florida statutes. It allows the consultant to specify the applicable timeframe or project scope for the indemnification. The document requires signatures from the consultant's authorized representative and notarization.
DOCX
DOCX, Low priority2 pages · contract-document
LowAI Summary for Indemnification Agreement for Consultant Services 2026 - City of Lakeland: This document is an indemnification agreement for consultants working with the City of Lakeland and the Florida Department of Transportation. It outlines the consultant's obligation to indemnify and hold harmless the City and its employees from liabilities arising from the consultant's negligence or wrongful acts. The agreement includes provisions on subrogation, release of liability, and compliance with Florida statutes. It specifies the timeframe or projects to which the indemnification applies and requires signatures and notarization. The document is dated for the year 2026 and is intended to govern indemnification related to contracts, purchase orders, or task authorizations with the City.
PDF
PDF, Low priorityindustry-day
LowAI Summary for Pre-Bid Meeting Sign-In Sheet - RFP 2026-RFP-120: Attendance record for the mandatory pre-bid meeting held on September 30, 2026, regarding the McIntosh Power Plant Cooling Tower Distribution System Replacement (RFP-NO. 2026-RFP-120). The document lists City of Lakeland representatives and 17 attending company representatives.
DWG
DWG
DWG
DWG
DWG
DWG
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
The existing McIntosh Power Plant cooling tower is an eight-cell, back-to-back counterflow cooling tower. The existing distribution system requires replacement to maintain the reliability and performance of the cooling tower and associated generating unit. The cooling tower is required during portions of the unit shutdown and startup process to support plant equipment. Therefore, although the Spring 2027 outage is scheduled from April 28 through May 19, 2027, the cooling tower will not be released for this work until April 30, 2027 and must be returned to an operational condition no later than May 17, 2027. Contractors should account for this limited work window when developing their staffing, equipment, material delivery, and execution plans.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award