MD 249 (Piney Point Road) from Thomas Road to Stark Drive -Drainage Improvements -Design-Build
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Contract SM1235174 is a Design-Build project managed by the Maryland Department of Transportation State Highway Administration to implement drainage improvements and living shoreline solutions along approximately 2 miles of MD 249 (Piney Point Road) between Thomas Road and Stark Drive in Saint Mary’s County. The project addresses critical vulnerabilities to tidal inundation, wave action, and shoreline erosion on Saint George Island, where low elevations make the roadway susceptible to frequent flooding. The primary objectives are to maintain roadway integrity and emergency access through targeted constructible solutions, achieving a minimum drainage asset condition rating of 4 with a service life of 25 years, and implementing restoration measures to limit shoreline migration. The procurement follows the Competitive Sealed Proposals method under COMAR 21.05.03, consisting of a two-phase evaluation. Phase One involves the submission of a Statement of Qualifications (SOQ) via the eMMA portal by November 17, 2026, to establish a Restricted Competitor List based on design-build capability, key staff expertise, and project approach. Phase Two will involve a Request for Proposal (RFP) for those on the restricted list, with the final award based on a combination of the SOQ rating, technical proposal, and price. The anticipated Notice to Proceed is August 30, 2027. Key requirements include strict adherence to environmental guidelines for erosion and sediment control due to the presence of submerged aquatic vegetation and oyster bars, as well as the provision of professional liability insurance and performance and payment bonds.
General Info
Agency
Place of Performance
MD, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
Additional Instructions: Final Date for RFQ Questions: October 20, 2026One (1) electronic copy of the SOQ as a searchable PDF shall be submitted as specified.All SOQs shall be submitted through eMMA online at https://emma.maryland.gov/. The limit to the size of each individual file that is uploaded in 300 MB. There is no limit to the number of files that can be uploaded in a single solicitation and no total limit to the size of all files uploaded in a single solicitation. eMMA accepts zipped files, but each zip file is limited in size to 300 MB. The following information must be typed in the Response Information box. In the “Project Description” type “MD 249 – (Piney Point Road) From Thomas Point Road to Stark Drive”, SOQ Due Date and Time, Firm Name, Firm Address and Contract Person for this submission. SOQs must be submitted electronically.The SOQ must be submitted no later than November 17, 2026, prior to 12 noon (prevailing local time).
Similar Contracts
Same NAICS industry code
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
