Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Mechanical Installation of EGR Hose Assembly

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the on-site mechanical installation and integration of a hose assembly connecting the surge tank to the EGR cooler, with a strict requirement for leak-free operation and full compliance with system drawings. The work must be performed in accordance with technical specifications to ensure proper functionality and integration within the existing engine emission control system. The installation is critical to maintaining system integrity and regulatory compliance, and all activities must be completed to the standards expected for heavy-duty vehicle maintenance and modification. The opportunity is classified as a subcontract under NAICS code 238290 and was posted on August 7, 2026, with a response deadline of August 12, 2026. The contracting entity is Dallas Area Rapid Transit, operating under the state of Texas, though no specific physical location for performance or point of contact is provided. Bidders must be prepared to meet rigorous installation standards and demonstrate capability in precision mechanical work under field conditions. All proposals must address adherence to system specifications and deliverables without deviation.

General Info

On-site mechanical installation of leak-free hose assembly for EGR cooler per strict technical and regulatory standards.

Agency

Texas → Dallas Area Rapid TransitView Agency

NAICS

238290 - Other Building Equipment ContractorsView NAICS

Place of Performance

TX, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → Dallas Area Rapid Transit
ContactsNo contacts available
OfficeN/A
Organization / Agency
Texas → Dallas Area Rapid Transit
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
On-site installation and integration of the hose between the surge tank and EGR cooler, ensuring leak-free performance and compliance with system drawings.

Similar Contracts

Same NAICS industry code

More opportunities from Texas → Dallas Area Rapid Transit

Same awarding agency

NAICS: 332999
New
SLED
HVAC/EGR System Hose SupplyThe contract entails the supply of a specialized hose designed to connect a surge tank to an EGR cooler, strictly adhering to original equipment manufacturer part numbers and technical specifications to ensure compatibility and performance. This component is critical to the proper operation of the vehicle’s emissions and thermal management systems, requiring precise material composition, dimensional accuracy, and durability under high-temperature and high-pressure conditions. All delivered hoses must meet rigorous quality standards to align with OEM requirements and avoid system failure or compliance issues. The opportunity is structured as a subcontract under NAICS code 332999 and is being procured by Dallas Area Rapid Transit through its Texas office. The solicitation was posted on August 7, 2026, with bids due by August 12, 2026, leaving a narrow five-day window for response. The place of performance and exact delivery location are not specified, but the supplier must be prepared to meet all logistical and timeline demands. There is no set-aside classification indicated, meaning all qualifying vendors may submit proposals regardless of business size or status. The procurement is managed through an online platform, and prospective suppliers are expected to review all technical and contractual terms directly via the provided link.
All Other Miscellaneous Fabricated Metal Product Manufacturing

POSTED

1 day ago

DEADLINE

in 4 days
View Details
NAICS: 423690
New
SLED
NEW, CONDENSER BLOWER, FAN | 2100475
Solicitation # 2100475
All bids for the condenser blower fan, item number 2100475, must strictly adhere to Dallas Area Rapid Transit Authority's purchase order terms and conditions, which govern the entire procurement process. Bids must reflect FOB Destination shipping terms with freight costs included in the total price; FOB Origin or Prepay and Add terms will not be accepted. Delivery is time-critical, and failure to meet specified delivery schedules will result in immediate rejection and potential termination for default. Payment is net 30 days from receipt of the invoice or the order, whichever is later, and invoices must be submitted in triplicate to APInvoices@dart.org, clearly indicating the purchase order number, item details, quantities, pricing, and extended totals. The authority reserves the right to terminate the contract in whole or in part if the seller fails to perform as required within the agreed timeframes, and in such cases, the seller may be held liable for reprocurement costs unless the failure was beyond their control, in which case the termination may be reclassified as for convenience. All vendor submissions must be prepared and submitted through the Bonfire platform, with access granted only after initiating the "Prepare Your Submission" process and using the in-browser BidTable window to complete vendor responses. The solicitation closes on August 13, 2026, at 7:00 PM CT.
Other Electronic Parts and Equipment Merchant Wholesalers

POSTED

2 days ago

DEADLINE

in 5 days
View Details