Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on March 25, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Median terminal systems, crash cushions, and midwest guard rail.

Closed
09-387604State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site
Solicitation # W9128F27RA056
The USACE Omaha District intends to issue Request for Proposal W9128F27RA056 in November 2026, with a planned proposal due date in January 2027. This unrestricted solicitation, open to both small and large businesses, seeks construction services for the Interim Remedial Action at the Nelson Tunnel Superfund Site located near Creede, Colorado. The project, estimated between 15 million and 30 million dollars, aims to prevent the uncontrolled release of mine-impacted water from an abandoned underground hard rock mine. The scope of work includes the installation of a new bypass adit south of the Nelson Tunnel, rehabilitation of the tunnel from the bypass connection to the bulkhead location, the installation of a flow control bulkhead within the Nelson Tunnel, and the construction of an accessible bulkhead flow control structure in the Commodore 5 level. The contract will be awarded based on a best-value approach, evaluating technical merit and price. Technical evaluation factors include project management approach and schedule, past performance, key personnel, and small business participation, with technical factors rated adjectivally and price assessed for reasonableness and realism. Performance is expected to begin within 10 days of the Notice to Proceed and must be completed within a duration not exceeding 655 days. Interested parties must be registered in SAM.gov with NAICS code 237990 and registered in the Procurement Integrated Enterprise Environment (PIEE) as a Proposal Manager to receive documents and submit proposals. Site visits are subject to safety briefings and specific equipment requirements for underground entry.
W071 Endist Omaha

POSTED

about 4 hours ago

DEADLINE

in 3 days
NAICS: 237990
New
Federal
MACH1 AOI FA8903-27-OT-001 Horizontal Airfield Infrastructure
Solicitation # FA8903-27-OT-001
Solicitation FA8903-27-OT-001 is an Area of Interest for an Other Transaction Agreement (OTA) under 10 U.S.C. § 2808a, managed by the Department of Defense. The scope focuses on the planning, design, engineering, alteration, repair, and physical construction of horizontal airfield infrastructure. This includes runways, taxiways, aircraft parking aprons, and associated visual and electrical systems such as lighting and automated control systems. Additionally, the scope covers civil, drainage, and safety infrastructure, including stormwater networks, perimeter security fencing, and subsurface utility corridors. All work must adhere to Unified Facilities Criteria (UFC) and Air Force Corporate Standards, with a strong emphasis on Anti-Terrorism/Force Protection standards. The project is structured into two Lines of Effort: LOE 1 focuses on design and planning, while LOE 2 covers final design and physical construction under negotiated commercial terms. The award process is multi-phased, beginning with a Phase 1 Solution Brief, which is a five-page white paper due by January 15, 2027. Evaluation criteria for Phase 1 include relevance to the AOI, the merit of the constructability concept, company viability, and schedule risk. To qualify, companies must demonstrate a history of completing at least three airfield pavement projects on DoW or FAA Part 139 installations within the last 10 years, each valued over $10 million. Performance will take place at DoW installations or commercial FAA Part 139 airports, primarily in the San Antonio, Texas area.
FA8903 772 Ess Pk

POSTED

about 4 hours ago

DEADLINE

in about 2 months

General Info

Documents

1
PDF, High priority: read this firstrfb
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • ADVANCE NOTICE: Rail Modernization ProgramOpen now, due in 317 days
  • Imperial Irrigation District – East Highline ReservoirOpen now, due in 21 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
Contacts1 person available
OfficeN/A

Full Description

Show more
09-Ker-58-R90.7/M111.1   ***   KERN COUNTY AT VARIOUS LOCATIONS ON ROUTE 58 FROM ROUTE 202/58 SEPARATION TO ROUTE 14/ROUTE 58 SEPARATION

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 236220
New
SLED
Building Construction In Sonoma County In And Near Santa Rosa At 224 Lincoln Street And 3251 Brickway Boulevard
Solicitation # 04-2Q5804
The California Department of Transportation has issued solicitation 04-2Q5804 for building construction projects located at 224 Lincoln Street and 3251 Brickway Boulevard in Santa Rosa, California. The primary scope of work involves the removal of existing electrical service and distribution systems at the Santa Rosa Maintenance Station and the installation of complete, operational electrical systems. Key deliverables include the provision of temporary construction power, heat, and lighting, as well as the execution of testing and commissioning. The contractor is required to maintain as-built drawings and provide comprehensive product data and shop drawings. Technical requirements mandate strict adherence to NFPA 70, ANSI, and IEEE standards, with specific packaging and marking protocols for electrical devices and wood structural panels. Quality assurance involves the use of qualified testing agencies and factory-authorized representatives, with mandatory infrared scanning of switches and circuit breakers after substantial completion. The project also requires compliance with 2008 ADA Standards for Accessibility, Buy America requirements for steel and iron, and specific cybersecurity hardening guides for the system. Administrative requirements include a unit price bid submission with a security deposit of at least 10 percent. Bidders must provide certifications for Small Business Enterprise (SBE) and Disabled Veteran Business Enterprise (DVBE) participation, with specific deadlines for commitment and confirmation. The contract emphasizes labor compliance through prevailing wage rates as determined by the California Department of Industrial Relations. Performance milestones include the energization of the Battery Energy Storage System within two weeks of delivery to the site.
Commercial and Institutional Building Construction

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Napa County Near Calistoga At No Name Creek Bridge
Solicitation # 04-2J88U4
The California Department of Transportation has issued solicitation 04-2J88U4 for construction work on the State Highway in Napa County near Calistoga at the No Name Creek Bridge. With an estimated project cost of 880,000 USD, the scope of work focuses on bridge scour repair, including the use of shotcrete for scour holes and partially grouted rock slope protection. Additional requirements include the installation of a Midwest Guardrail System, culvert cleaning, structure excavation, and extensive landscaping and erosion control involving hydroseeding, fiber rolls, and soil amendment. The project also necessitates the removal of existing guardrails and thermoplastic traffic stripes, which are handled as hazardous waste. Performance is subject to strict environmental and regulatory constraints, including a restricted work window within creek channels from June 15 to October 15. Contractors must comply with prevailing wage laws and meet a 5 percent goal for both Small Business Enterprise (SBE) and Disabled Veteran Business Enterprise (DVBE) participation. Technical standards require that temporary concrete barriers be fabricated at authorized facilities and that local materials meet specific pH and lead concentration limits. Administrative requirements include the submission of a baseline schedule, weekly working days reports, and electronic payroll records via LCPtracker Pro. Bids are due by December 15, 2026, and must be submitted on a unit price basis.
Highway, Street, and Bridge Construction

POSTED

about 3 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Lake County Near Lower Lake On Route 29 From Coyote Creek Bridge To Diener Drive/Road 543 And On Route 53 At Route 29
Solicitation # 01-0J9304
Solicitation 01-0J9304 is a construction project issued by the California Department of Transportation for state highway improvements in Lake County. The scope of work focuses on Route 29, from Coyote Creek Bridge to Diener Drive/Road 543, and Route 53 at Route 29. Key activities include cold planing of AC pavement, installation of Rubberized Hot Mix Asphalt Gap Graded overlay, and Hot Mix Asphalt Type A surfacing. The project also involves bridge work at Coyote Creek Bridge, drainage improvements, utility plans, and the installation of sinusoidal rumble strips and traffic stripe tape. The estimated cost for the project is 14.4 million dollars. Bids must be submitted via the Bid Express website by January 6, 2027, and must include bidder security of at least 10 percent of the bid. Proposed project durations must fall between 100 and 140 working days. The contract is governed by the 2025 Standard Specifications and includes strict requirements for Buy America/Build America compliance and environmental product declarations for concrete and asphalt. Contractors must adhere to rigorous environmental standards, including specific pressure washing protocols for equipment to prevent the spread of invasive species and compliance with the RWQCB basin plan. Performance must begin within 55 days of contract approval by the Attorney General, with a notice of start required 72 hours prior to activity. The project mandates the use of prevailing wages and requires a certified safety representative with specific Cal/OSHA or OSHA training and professional certifications. Quality control personnel must hold ACI Concrete Field-Testing Technician Grade 1 certification. Temporary concrete barriers must be fabricated at authorized facilities and meet MASH Test Level 3 safety standards.
Highway, Street, and Bridge Construction

POSTED

about 17 hours ago

DEADLINE

in about 2 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS