Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Defense was posted on May 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Metal Sheet Piling Installation – Pump Station

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves the installation of metal sheet piling at the Reach 4 pump station site in Cedar Rapids to support structural shoring and create a water cutoff during excavation and foundation construction activities. This work is critical to ensuring site stability and preventing groundwater intrusion while foundational elements are being installed. The project falls under NAICS code 238990, categorizing it as other heavy and civil engineering construction, and is structured as a subcontract. The solicitation was posted on May 1, 2026, with a response deadline of March 18, 2026, at 6:00 PM, indicating a forward-dated posting likely for planning or procurement cycle purposes. The contracting agency is the Department of Defense under W07V Endist Rock Island, with performance taking place exclusively at the Cedar Rapids location. No set-aside provisions or point of contact details are specified in the provided data.

General Info

Install metal sheet piling at Cedar Rapids pump station for shoring and groundwater cutoff during foundation work.

Agency

Department Of Defense → W07V Endist Rock IslandView Agency

NAICS

238990 - All Other Specialty Trade ContractorsView NAICS

Place of Performance

Cedar Rapids, IA, USA

Set-Aside

NONE

Documents

This scope was carved out of W912EK26BA001.

The full solicitation package (17 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

subcontract

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist Rock Island
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → W07V Endist Rock Island
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of metal sheet piling at the Reach 4 pump station site to provide structural shoring and water cutoff during excavation and foundation work.

More opportunities from Department Of Defense → W07V Endist Rock Island

Same awarding agency

NAICS: 237110
New
Federal
88TH RD US ARMY RESERVE CENTER ARLINGTON HEIGHTS, IL WATER INFRASTRUCTURE IMPROVEMENTS- SOLICITATION
Solicitation # W912EK26BA017
The US Army Corps of Engineers Rock Island District is soliciting competitive 8(a) bids under FAR Part 14 for water infrastructure improvements at the 88th RD US Army Reserve Center in Arlington Heights, Illinois. This firm-fixed-price construction project involves a comprehensive scope of work including demolition, directional drilling, and the installation of new water service and main lines. The base bid covers the provision of gate valves, vaults, meters, fire hydrants, and chlorination testing, as well as HMA patching, concrete sidewalk repair, and site restoration. Two additional options are included: Option A focuses on a new water connection to the Village of Arlington Heights watermain and the capping of existing connections, while Option B includes similar connection work along with the investigation of existing storm sewers under Central Road. The project is designated under NAICS code 237110 and requires a 270-day completion period. Bidders must submit all proposals electronically via the PIEE Solicitation Module by September 16, 2026, as emailed or hard copy bids will not be accepted. Key requirements include the submission of a Contractor Quality Control plan within seven calendar days of the Notice to Proceed and adherence to Davis-Bacon Act wage standards. Performance and payment bonds are required at 100 percent of the original contract price. Payment will be administered through the Resident Management System (RMS), and the project incorporates strict quality standards, including a three-phase control system and compliance with ASTM D3740 and E329 for soil and construction inspection.
Water and Sewer Line and Related Structures Construction

POSTED

2 days ago

DEADLINE

in 5 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS