Water Infrastructure Improvements Arlington Heights, IL - PRESOLICITATION
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
NAICS
Place of Performance
IL, 60005Set-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
The US Army Corps of Engineers - Rock Island District intends to solicit for competitive bids under RFO part 14 for the following requirement.
DISCLAIMER: THIS IS A PRE-SOLICITATION NOTICE. ANY INFORMATION OR SUBMITTALS RECEIVED IN RESPONSE TO THIS NOTICE WILL NOT BE EVALUATED AND WILL NOT BE CONSTRUED AS BIDS. NO COMPENSATION FOR SUCH RESPONSES WILL BE MADE.
PROJECT LOCATION
The work is located at the Arlington Heights 88th Readiness Division, COL. P. Schulstad U.S. Army Reserve Center, with a physical address of 1515 West Central Road, Arlington Heights, Cook County, Illinois, and as indicated.
SUMMARY OF WORK
Base Bid: The Base bid work includes, but is not limited to, demolition; directional drilling; trenching; installing a new water connection to the Village of Arlington Heights watermain; installing a water service and main lines; installing gate valves, vaults, meters, and boxes; chlorination testing of the new water system; removing and capping fire hydrants; installing new fire hydrants; HMA patching of ACC pavement; repairing concrete sidewalks and drives; investigating and repairing a section of leaking previously abandoned watermain; seeding disturbed areas; and site restoration.
Option A: The work for Option A includes, but is not limited to, demolition; directional drilling; excavation; installing a new water connection to the Village of Arlington Heights watermain; plugging the existing connection; installing gate valves, vaults, meters, and boxes; chlorination testing of the new water system; HMA patching of ACC pavement; repairing concrete sidewalks and drives as needed; seeding disturbed areas; and site restoration.