This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6 as supplemented with additional information included in this notice. Solicitation number is HSCG85-12-R-P45B87 is issued as a Request for Proposals. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. This Request for Proposal incorporates provisions and clauses in effect through Federal Acquisition Circular 05-56. This is a total small business set-aside. The NAICS Code is 336611 with a size standard of 1,000 employees. The contract will be awarded on a firm-fixed-price basis. The requirement is for dockside repairs aboard CGC GALLATIN consisting of the following items in accordance with the attached specification. Schedule of Supplies/Services CLIN 0001, D-01 Weather deck Exterior Preservation, one Job, tiny_mce_marker____________ CLIN 0002, O-02, Weather Deck Plating renewal, one Job, tiny_mce_marker_____________ NOTE: Optional item O-02 will be awarded if inspection reports reveal the necessity for activation, but before 30 July 2012, see contract clauses "Optional Items" and 52.217-5, Evaluation of Options. The following labor hour rate in CLIN 0003 shall be used in pricing all contract changes in accordance with the clause entitled "COMPOSITE LABOR HOUR RATE FOR CONTRACT CHANGES." CLIN 0003, Composite Labor Hour Rate, tiny_mce_marker____/hr x 300 hours = tiny_mce_marker_____________ NOTE: The estimated quantity and extended amount indicated above are for evaluation of offers only. The quoted rate will apply to all changes involving additional work under this contract regardless of the actual total hours required. Total Evaluated Price (CLINs 0001, 0002, 0003) tiny_mce_marker________________ Period of Performance: 16 July 2012 - 24 August 2012 Place of Performance: Charleston, SC Inspection of Vessel: CGC GALLATIN is available for inspection during the solicitation at the Federal Law Enforcement Training Center (FLETC) Facility, 1050 Register Street, Charleston, SC 29405. All prospective offerors are strongly encouraged to visit the vessel and visually inspect each item of work and to become acquainted with local conditions, locations of items and fixtures, removals, replacements, interference and the nature of work. Points of contact to arrange access to vessel: LT Sean Munnis, GALLATIN Port Engineer,
+1 (555) 000-0000 LCDR Hector Maldonado, GALLATIN Engineering Officer,
+1 (555) 000-0000 Offerors' personnel requiring access must provide name, date of birth and social security numbers to either one of the points of contact above prior to arrival. Proposals submitted in response to this solicitation must include: (1) Solicitation number HSCG85-12-R-P45B87; (2) CLIN number, item name, and unit/extended prices for all CLINs; (3) past performance information ; (4) Representations and Certifications, (5) Taxpayer identification and Dun & Bradstreet (DUNS) number and Central Contractor Registration (CCR) number; (6) Contractors full name, address, and telephone number. Closing date/time for submission of quotations is 21 June 2012 at 2:00 P.M., Pacific Time. Submit responses to: U.S. Coast Guard Surface Forces Logistics Center 1301 Clay Street, Suite 800N Oakland, CA 96412 Attn: Valerie Rivera-Chase Electronic offers by email to
contact@example.gov are acceptable and encouraged. It is the policy of the Coast Guard to issue solicitations and make contract awards in a fair and timely manner. The Ombudsman Program for Agency Protests (OPAP) was established to investigate agency protest issues and resolve them without expensive and time-consuming litigation. OPAP is an independent reviewing authority that is empowered to grant a prevailing protester essentially the same relief as the General Accounting Office (GAO). Interested parties are encouraged to seek resolution of their concerns within the Coast Guard as an Alternative Dispute Resolution (ADR) forum, rather than filing protest with the GAO or some external forum. Interested parties may seek resolution of their concerns informally or opt to file formal agency protest with the Contracting Officer or Ombudsman. Informal forum with the Ombudsman. Interested parties who believe that Coast Guard procurement is unfair or otherwise defective should first direct their concerns to the cognizant Contracting Officer. If the Contracting Officer is unable to satisfy the concerns, the interested party is encouraged to contact the Coast Guard Ombudsman for Agency Protests. Under this informal process, the agency is not required to suspend contract award performance. Use of an informal forum does not suspend any time requirement for filing a protest with the agency or other forum. In order to ensure a timely response, interested parties should provide the following information to the Ombudsman: solicitation/contract number, contracting office, Contracting Officer, and solicitation closing date (if applicable). Formal Agency Protest with the Ombudsman. Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the Contracting Officer through open and frank discussions. If the protester's concerns are unresolved, an independent review is available by the Ombudsman. The protester may file formal agency protest to either the Contracting Officer or as an alternative to that, the Ombudsman under the OPAP program. Contract award or performance will be suspended during the protest period unless contract award or performance is justified, in writing, for urgent and compelling reasons or is determined in writing to be in the best interest of the Government. The agency's goal is to resolve protests in less than 35 calendar days from the date of filing. Protests shall include the information set forth at FAR 33.103(d)(2). If the protester fails to submit the required information, resolution of the protest may be delayed or the protest may be dismissed. This will not preclude re-filing of the protest to meet the requirement. To be timely, protests must be filed within the period specified in FAR 33.103(e). Formal protests filed under the OPAP program should be forwarded to: Commandant (CG-913), U.S. Coast Guard Headquarters, Acquisition Planning and Performance Measurement, 1900 Half St. S.W. Room 11-0402, Washington, DC 20593, Telephone
+1 (555) 000-0000. This solicitation incorporates by reference FAR 52.212-1, 52.212-4, 52.212-3, 52.212-5 and their addenda. FAR 52.212-4 CONTRACT TERMS AND CONDITIONS - COMMERCIAL ITEMS (FEB 2012) ADDENDUM FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: http://www.arnet.gov/far/index.html http://farsite.hill.af.mil/VFHSARA.HTM. FAR 52.228-5 Insurance - Work on a Government Installation (Jan 1997) FAR 52.245-15 Stop-Work Order (Aug 1989) FAR 52.246-1 Contractor Inspection Requirements (Apr 1984) FAR 52.246-2 Inspection of Supplies - Fixed Price (Aug 1996) FAR 246-16 Responsibility for Supplies (Apr 1984) DEPARTMENT OF HOMELAND SECURITY ACQUISITION REGULATION (48 CFR Chapter 30) CLAUSES: 3052.211-71 Index for Specifications DEC 2003 3052.217-90 Delivery and Shifting of Vessel DEC 2003 3052.217-91 Performance DEC 2003 3052.217-92 Inspection and Manner of Doing Work DEC 2003 3052.217-93 Subcontracts DEC 2003 3052.217-95 Liability and Insurance DEC 2003 3052.217-96 Title DEC 2003 3052.217-97 Discharge of Liens DEC 2003 3052.217-98 Delays DEC 2003 3052.217-99 Department of Labor Safety and Health Regulations for Ship Repair DEC 2003 3052.217-100 Guarantee (60 DAYS) JUN 2006 3052.222-70 Strikes or Picketing Affecting Timely Completion of the Contract Work DEC 2003 3052.223-90 Accident and Fire Reporting DEC 2003 3052.228-70 Insurance DEC 2003 3052.242-70 Dissemination of Contract Information DEC 2003 3052.242-72 Contracting Officer's Technical Representative DEC 2003 3052.245-70 Government Property Reports JUN 2006 ADDITIONAL WORK A. If the need for additional work develops, the Contractor must obtain authority orally or in writing from the Contracting Officer before proceeding with such work. B. To the extent requested by the Contracting Officer, the Contractor shall prepare and submit written proposals for proposed change orders, which may be required to include: (1) A complete breakdown of labor hours and costs by labor category and phase of work as identified by the Contracting Officer; (2) A complete breakdown of material costs showing material required, source (with point of contact), part number, unit and extended cost and contractor's material handling costs. (3) A complete breakdown of labor and material as described above for each proposed subcontractor. C. The contractor shall submit written proposals and breakdown to the Contracting Officer via e-mail at
contact@example.gov. COMPOSITE LABOR HOUR RATE FOR CONTRACT CHANGES 1. The composite labor hour rate price in the Schedule of Supples/Services shall be the sole labor hour rate used to price the prime contractor's direct labor hours for all contract changes, whether growth within scope or new work. The contractor shall not receive any compensation in addition to this rate for prime contractor's direct labor associated with changes under this contract. 2. The composite labor hour rate shall represent total compensation for the following: direct labor; any port or association fees, rents or other levies; all overhead and general and administrative costs; profit; and all direct and indirect costs and profit associated with following support functions: Supervision, Quality Assurance, Planning, Engineering, Surveyors, Worker Transit Time, Material Handling, Testing, Cleaners, Guards, Estimating, Contract Administration 3. The composite labor hour rate will be used in pricing production labor hours. This shall include only those hours necessary and reasonable to perform direct production functions, and will not include the support functions listed above, whether the contractor normally charges such support functions directly or indirectly by the contractor's accounting system. These support functions are to be priced into the bid rate and shall not be separately compensated. 4. The Estimated Quantity indicated by the Government in the Schedule of Supplies/Services is an estimate only, and the Extended Amount indicated by the bidders in the Schedule of Supplies/Services is not ordered by award of a contract pursuant to this solicitation. The Estimated Quantity represents the Government's best estimate of the total number of hours that will be required. The actual number of hours may be greater or less. INSURANCE REQUIREMENTS A. The contractor shall be required to procure and thereafter maintain the following insurance: (1) Ship repairer's legal liability insurance to insure the risks described in HSAR 3052.217-95 Liability and Insurance (DEC 2003), in the amount of $300,000.00. (2) Comprehensive general liability insurance to insure the risks described in HSAR 3052.217-95 Liability and Insurance (DEC 2003), in the amount of $300,000.00 on account of any one accident or occurrence with respect to each cutter, boat and barge upon which work is to be performed under this solicitation and the contract resulting there from; (3) Full insurance coverage in accordance with the State Workmen's Compensation law; and (4) Full insurance coverage in accordance with the United States Longshore and Harbor Workers' Compensation Act. B. As evidence that he has obtained the insurance specified in this schedule, the contractor shall furnish the contracting officer with a certificate or certificates executed by an agent of the insurer authorized to execute such certificates. Such certificate shall be furnished before commencement of work. Each certificate shall state that (NAME OF INSURER) has insured (NAME OF CONTRACTOR), in accordance with the Liability and Insurance clause and the Insurance Requirements clause contained herein. Each certificate shall set forth that each policy of insurance represented thereby will expire on (DATE) and that each such policy contains the following clause: "It is agreed that in the event of cancellation, or any material change in the policy adversely affecting the interest of the Government in this insurance, thirty (30) days' prior written notice will be given to the Contracting Officer." C. A bidder who proposes to self-insure for any of the risks set forth in the Liability and Insurance clause and in the Insurance Requirements clause contained herein shall submit satisfactory evidence to permit the Contracting Officer to determine that the bidder's assets are sufficient for the risks set forth in such clauses. The bidders shall submit with his offer two (2) certified copies of documents listing his assets and liabilities and such other information as deemed necessary by the Bidders or as required by the Contracting Officer. For approval of self-insurance under the State Workmen's Compensation Law and the United States Longshore and Harbor Workers' Compensation Act, evidence of qualifications as a self-insurer under the applicable compensation statute must be furnished to the contracting officer. OPTIONAL ITEMS Optional Items O-02 may be awarded if inspection reports reveal the necessity for activation, at the price quoted in the Contractor's proposal and without any other consideration whatsoever. However, after midnight on 30 July 2012, the Contractor shall have the right to refuse to accept the award of such Optional Items. Such award refusals shall bar neither the Government nor the Contractor from subsequently negotiating with each other for performance of the work embodied in the refused Optional Item/s. Optional items shall be awarded by written notice to the Contractor through issuance of a contract modification (SF-30). Transmission of the SF-30 notice of exercise to the contractor via FAX is authorized; for purposes of determining the exact time of FAX transmission, the time, date, and year of transmission automatically applied to the FAX and/or the FAX transmission record of transmission at the contracting office shall govern. Evaluation of the Optional items will not obligate the Government. WELDING CERTIFICATIONS AND QUALIFICATIONS This contract may contain welding line items as either Definitive or Optional Items. With his/her proposal the Contractor shall provide the necessary welding certifications and qualifications as required by the specification for the applicable work item(s), and MLCA/SFLC Standard Specification 0740_STD. Subsequent to contract award, the Government will require the contractor to submit applicable certifications and qualifications for any welding to be performed on any proposed change request. VOLATILE ORGANIC COMPOUNDS (VOC) REGULATIONS (a) Contractors are required to comply with federal, state and local VOC compliance laws and regulations. Among other requirements, certain Contractors may also be required to operate pursuant to a Title V permit. The need for such a permit will depend on the provisions of the applicable state's -State Implementation Plan? (SIP) and the type/quantity of the Contractor's regulated emissions, including VOCs. Certain SIPs may also mandate certain Contractors to operate under the terms of a compliance plan intended to reduce VOC emissions. (b) Contractors, therefore, must submit the following to the designated Port Engineer not later than two weeks after contract award: (1) Copies of any federal, state or local permits required and applicable to the use or application of VOCs at Contractor's facility or offsite work places; (2) Copies of any compliance plans required and applicable to the use or application of VOCs at Contractor's facility or offsite work places. (c) If no federal, state or local permits or compliance plans are required and applicable to the use or application of VOCs at Contractor's facility or offsite workplaces, then Contractor shall submit to the designated Port Engineer a letter, notarized under oath, that such documents are not required. (d) Contractors will submit the following to the designated Port Engineer not later than two weeks after contract award: Data Sheets (MSDS) documents, certificates, specifications or any other manufacturing data verifying the VOC ratings of paints to be applied to the Cutter in accordance with MLCA Standard Spec 63000N, Section 5.3.1 SECURITY REQUIREMENTS A. For each affected Coast Guard facility, the Contractor shall provide a list of all on-site personnel, including sub-contractors (including second and third-tier subcontractors) and suppliers, to the Contracting Officer. The contractor shall update this list when changes occur. Contractor personnel not listed may be denied access to the Coast Guard facility. Contractor personnel will be restricted to designated working areas. Any personnel violating this policy may lose access to the Coast Guard facility. Contractor personnel shall have photo identification at all times while working on Coast Guard facilities. B. Contractor and delivery personnel may be required to present personal photo identification to gain access to a Coast Guard installation. If identification does not indicate United States citizenship, Coast Guard Security may require proof of the legal right to work in the United States. Contractor and delivery personnel also may be subjected to an immigration status and outstanding criminal warrants check. C. Contractors shall provide the Contracting Officer's Technical Representative with 24 hours of advance notice of every delivery to the site (e.g., concrete, lumber, parts, etc.) and provide the company name, delivery person, and phone number of the firm(s) making deliveries. All vehicle access to government property requires vehicle registration and proof of liability insurance. Otherwise access to the Coast Guard facility may be denied. INVOICES: WINs Remote Centralized Invoicing Requirements (A) The U.S. Coast Guard has implemented WINs Remote for the preferred method for contractors to submit all payment requests. As prescribed in FAR Clause 52.232-25, Prompt Payment, all information must be included in an invoice for it to constitute a proper invoice. (B) Each invoice shall contain the following information to ensure proper processing: 1) Contract Number, Delivery Order/Task Order Number, DOC Number 2) Invoice Number and Invoice Date 3) DUNS Number 4) Name of the Contract Specialist and Contracting Officer's 5) Invoice Routing Code (IRC): SFLC-2 6) Indicate Small Business Status 7) Indicate if Final Invoice (C) Each Invoice shall be submitted via one of the following methods (In order of preference) 1.) FINCEN Website Invoice Receipt Form: http://www.fincen.uscg.mil/centralinv/central_inv_contr.cfm (FINCEN Web based invoice submission shall be submitted as a single Adobe pdf. formatted file not to exceed 999 pages.) 2.) Fax:
+1 (555) 000-0000 3.) Mailed To: Commercial Invoices U.S. Coast Guard Finance Center 1430A Kristina Way Chesapeake, VA 23326 (D) Copies of the invoice along with any supporting documentation, shall be sent to the contract specialist and the Contracting Officer's Representative (COR) to the following email addresses below:
contact@example.gov contact@example.gov E) In accordance with the Prompt Payment Act, for the purposes of determining a payment due date and the date on which interest will begin to accrue if a payment is late, a proper invoice shall be deemed to have been received: (1) On the later of: (i) For invoices that are mailed or transmitted via facsimile, the date a proper invoice is actually received by the designated billing office and annotates the invoice with date of receipt at the time of receipt. (ii) For invoices electronically transmitted by the contractor via web based submission, the date a transmission is received by the designated billing office, and receipt confirmation is provided to the designated recipient; or (ii) The seventh day after the date on which the property is actually delivered or performance of the services is actually completed; unless- a) The agency has actually accepted the property or services before the seventh day in which case the acceptance date shall substitute for the seventh day after the delivery date; or b) A longer acceptance period is specified in the contract, in which case the date of actual acceptance or the date on which such longer acceptance period ends shall substitute for the seventh day after the delivery date; (2) On the date placed on the invoice by the contractor, when the agency fails to annotate the invoice with date of receipt of the invoice at the time of receipt (such invoice must be a proper invoice); or (3) On the date of delivery, when the contract specifies that the delivery ticket may serve as an invoice. (4) Web based submission by the contractor and receipt confirmation does not reflect Government review or acceptance of the invoice. (5) For inquiries and payment status please visit https://fincen.uscg.mil/secure/payment.htm All services ordered under this Contract shall be billed once the work has been completed and received by the Surface Forces Logistics Center. The Contractor shall submit invoices to the following payment address: U.S. Coast Guard Yard P.O. Box 4122 Chesapeake, VA 23327-4122 M/F: Contract Number Invoices may also be submitted electronically by accessing and completing the invoice form found at
contact@example.gov. All invoices must contain the following information to constitute a proper invoice: (1) Name and address of Contractor (2) Invoice date (3) Contract Number (4) Description, quantity, unit of measure, unit price and extended price (5) Terms of any prompt payment discounts offered (6) Dun & Bradstreet (DUNS) Number (7) Federal Tax Identification Number (8) Name, title, and telephone number of individual to be notified upon receipt of improper invoice(s). Invoices shall be processed in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) Circular A-125, Prompt Payment. The Contractor is encouraged to assign an identification number to each invoice. **NOTE: Contractor's may submit invoices electronically by accessing and completing the invoice form found at https://www.fincen.uscg.mil/secure/web_invoices_cgyard.htm. Failure to submit a complete invoice to the office listed above may delay payment of invoices. Invoices shall be processed in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) Circular A-125, Prompt Payment. The Contractor is encouraged to assign an identification number to each invoice. In addition, all contractors are required to be registered in the Central Contractor Registration (CCR) database. A Data Universal Numbering System (DUNS) number is the primary identifier in CCR. Contractors are located and identified in CCR by their Duns number. Therefore, to facilitate payment, it is in the Contractor's best interest to ensure that the Duns number is recorded on every invoice submitted to the U.S.C.G. For more information on CCR, and to register online, simply visit the CCR website at https://www.bpn.gov/ccr/default.aspx or call the Coast Guard Finance Center Service line at
+1 (555) 000-0000. Offerors must be registered in the CCR database no later than the date of award. CONTRACT ADMINISTRATION The Contracting Officer, Valerie Rivera-Chase,
+1 (555) 000-0000,
contact@example.gov, or authorized representative shall be the contract administrator of this contract. All correspondence, except as otherwise specified, shall be delivered to the Contracting Officer at the following address: U.S. Coast Guard Surface Forces Logistics Center Contracting and Procurement Branch 2 1301 Clay Street, Suite 800N Oakland, CA 94612-5249 M/F: Contract Number: {To be furnished at the time of award} Notification of administrative matters: If at any time during the performance of this contract, administrative problems should arise which will have an adverse impact on timely performance by the Contractor or affect the contract prices or funding, the Contractor is required to immediately notify the Contract Administrator identified above. GOVERNMENT REPRESENTATIVES: (a) The Government may, upon contract award or thereafter, name representatives with titles such as Project Officer, Contracting Officer's Representative(s), and so on. Such individuals, IF APPOINTED, will be named in writing by the Contracting Officer. The letter of appointment will indicate the individuals, titles, and stipulate the rights, responsibilities, and limitations of their appointment. (b) In any event, no such named individual has the authority to issue any direction under this contract, either technical or otherwise, which constitutes a change to the terms, conditions, and price or delivery schedule of the contract. ONLY the Contracting Officer is authorized to alter the contract in any manner. CONTRACTOR PERFORMANCE ASSESSMENT REPORT (CPAR) (a) GENERAL: The U.S. Coast Guard Surface Forces Logistic Center (SFLC) will monitor and evaluate the successful offeror's past performance of this contract and prepare a Contractor Performance Assessment Report (CPAR) in accordance with FAR Part 42.15. All information contained in this assessment may be used, within the limitations of FAR 42.15, by the government for future source selections and in accordance with FAR 15.304, when past performance is an evaluation factor for award. (b) NOTIFICATION: Upon completion of the contract, the contractor will be notified of the assessment. The contractor will be allowed 30 days to respond to the SLFC's assessment of its performance entered into CPARS. The contractor's response, if any, will be made part of the CPAR system. (c) INFORMATION: Information included in the CPAR may include, but is not limited to, the contractor's record of conforming to contract requirements and to standards of good workmanship; the contractor's record of forecasting and controlling costs; the contractor's adherence to contract schedules, including the administrative aspects of performance; the contractor's history of reasonable and cooperative behavior and commitment to customer satisfaction; the contractor's record of integrity and business ethics, and generally, the contractor's business-like concern for the interest of the customer. (d) RELEASE OF DATA: CPARS information is considered business sensitive and will not be released except: (1) to other Federal procurement activities which request it; (2) when SFLC must release pursuant to a Freedom of Information Act (FOIA) request; or (3) when prior written consent is requested and obtained from the contractor. 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS (APR 2012) a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (1) 52.222-50, Combating Trafficking in Persons (Feb 2009) (22 U.S.C. 7104(g)). ___Alternate I (Aug 2007) of 52.222-50 (22 U.S.C. 7104(g)). (2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553). (3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77, 108-78). (b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: [Contracting Officer check as appropriate.] X (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 253g and 10 U.S.C. 2402). __ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note)). __ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.) X (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Feb 2012) (Pub. L. 109-282) (31 U.S.C. 6101 note). __ (5) 52.204-11, American Recovery and Reinvestment Act-Reporting Requirements (Jul 2010) (Pub. L. 111-5). X (6) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Dec 2010) (31 U.S.C. 6101 note). _ (7) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Jan 2012) (41 U.S.C. 2313). __ (8) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (section 740 of Division C of Pub. L. 111-117, section 743 of Division D of Pub. L. 111-8, and section 745 of Division D of Pub. L. 110-161). __ (9) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Nov 2011) (15 U.S.C. 657a). __ (10) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (JAN 2011) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a). __ (11) [Reserved] X (12)(i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2011) (15 U.S.C. 644). __ (ii) Alternate I (Nov 2011). __ (iii) Alternate II (Nov 2011). __ (13)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644). __ (ii) Alternate I (Oct 1995) of 52.219-7. __ (iii) Alternate II (Mar 2004) of 52.219-7. __ (14) 52.219-8, Utilization of Small Business Concerns (Jan 2011) (15 U.S.C. 637(d)(2) and (3)). __ (15)(i) 52.219-9, Small Business Subcontracting Plan (Jan 2011) (15 U.S.C. 637(d)(4)). __ (ii) Alternate I (Oct 2001) of 52.219-9. __ (iii) Alternate II (Oct 2001) of 52.219-9. __ (iv) Alternate III (Jul 2010) of 52.219-9. __ (16) 52.219-13, Notice of Set-Aside of Orders (Nov 2011)(15 U.S.C. 644(r)). X (17) 52.219-14, Limitations on Subcontracting (Nov 2011) (15 U.S.C. 637(a)(14)). __ (18) 52.219-16, Liquidated Damages-Subcon-tracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)). __ (19)(i) 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns (OCT 2008) (10 U.S.C. 2323) (if the offeror elects to waive the adjustment, it shall so indicate in its offer). __ (ii) Alternate I (June 2003) of 52.219-23. __ (20) 52.219-25, Small Disadvantaged Business Participation Program-Disadvantaged Status and Reporting (Dec 2010) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323). __ (21) 52.219-26, Small Disadvantaged Business Participation Program- Incentive Subcontracting (Oct 2000) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323). __ (22) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Nov 2011) (15 U.S.C. 657 f). X (23) 52.219-28, Post Award Small Business Program Rerepresentation (Apr 2009) (15 U.S.C. 632(a)(2)). __ (24) 52.219-29, Notice of Set-Aside for Economically Disadvantaged Women-Owned Small Business (EDWOSB) Concerns (Apr 2012) (15 U.S.C. 637(m)). __ (25) 52.219-30, Notice of Set-Aside for Women-Owned Small Business (WOSB) Concerns Eligible Under the WOSB Program (Apr 2012) (15 U.S.C. 637(m)). X (26) 52.222-3, Convict Labor (June 2003) (E.O. 11755). X (27) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (Mar 2012) (E.O. 13126). X (28) 52.222-21, Prohibition of Segregated Facilities (Feb 1999). X (29) 52.222-26, Equal Opportunity (Mar 2007) (E.O. 11246). X (30) 52.222-35, Equal Op...