Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on August 30, 2012. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Minot Cultural Study

Awarded
W912ES-12-T-0138Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541720
New
Federal
Countermeasures That Work (CMTW) Updates
Solicitation # 693JJ926R000067
The National Highway Traffic Safety Administration (NHTSA) is soliciting proposals for a single-award, Cost-Plus-Fixed-Fee (CPFF) completion contract to update the Countermeasures That Work (CMTW) evidence-based reference guide and its companion document, Countermeasures At Work (CMAW). The project involves developing the 13th and 14th editions of CMTW and the 2nd edition of CMAW, as well as updating the Electronic Countermeasures That Work (E-CMTW) website. The selected contractor will conduct comprehensive literature searches and synthesize research across eleven behavioral traffic safety program areas, updating approximately three to four chapters annually. The contract period consists of a twelve-month base period with four twelve-month options, for a total potential duration of sixty months. Award will be based on best value, with a primary emphasis on superior technical skills over the lowest cost. Evaluation factors include the offeror's understanding of research complexities, the soundness of the proposed approach, personnel qualifications, and corporate past performance. Deliverables must adhere to strict quality control standards, including the use of APA 7th edition style and rigorous anti-plagiarism compliance. All final text must be submitted in electronic format using minimal formatting to facilitate government printing. Proposals must be submitted in two separate volumes, technical and business, by November 5, 2026.
693JJ9 Nhtsa Office Of Acquistion

POSTED

1 day ago

DEADLINE

in 7 days
NAICS: 541720
New
SLED
ARFQ-0402-EDD2700000004-2 | Statewide Evaluation for the 21st CCLC Program
Solicitation # ARFQ-0402-EDD2700000004-2
The West Virginia Department of Education is seeking a statewide evaluator for the 21st Century Community Learning Centers program, authorized under Title IV, Part B of the Federal Elementary and Secondary Education Act. The selected contractor will be responsible for collecting, validating, and analyzing evaluation data, which includes conducting at least one annual on-site visit to five selected subgrantees and delivering one in-person presentation of findings in Charleston, West Virginia, each contract year. Services are anticipated to begin in January 2027, with a Statewide Evaluation Plan due within 60 calendar days of the effective start date. This fixed-amount agency contract will be awarded to the vendor that meets all minimum qualifications and mandatory requirements for the lowest overall total cost, calculated as the sum of the initial contract year and three optional renewal years. Deliverables must be provided in accessible formats, including Microsoft Word, searchable PDFs, and nonproprietary machine-readable datasets. Due to the nature of the work, the contractor must adhere to strict data privacy standards, including FERPA compliance and the execution of confidentiality and non-disclosure agreements. Bids must be submitted electronically via wvOASIS or delivered to the agency by November 12, 2026, at 10:30 AM EDT.
West Virginia

POSTED

2 days ago

DEADLINE

in 14 days
NAICS: 541720
New
SLED
PS- RFP for State of Alabama Historical Commission for 2025-2035 Statewide Historic Preservation Plan
Solicitation # SRC0000037417
The State of Alabama Historical Commission is soliciting proposals for professional services to develop and update the 2025-2035 Statewide Historic Preservation Plan. The primary objective is to create a concise, printed document that provides a vision for historic preservation in Alabama, including a summary of plan development, an assessment of historic and cultural resources, and guidance for management policies and strategies. The project must adhere to the Secretary of the Interior’s Preservation Planning and Professional Qualification Standards, as well as the HPF Grants Manual and 54 USC §302303. The selected contractor will be required to provide quarterly progress reports throughout the development process. Proposals must be submitted via Alabama Buys by November 30, 2026, at 4:30 PM CT, with an inquiry deadline of November 13, 2026. Evaluation is based on a weighted scoring system: Proposed Project Plan and Approach (40 points), Vendor Qualifications and Experience (35 points), Cost Proposal (20 points), and an Executive Summary (5 points). The initial contract term is two years from the date of the Governor's signature, with the possibility of three additional one-year renewals. Awardees must comply with various state certifications, including tax registration, immigration law compliance, and prohibitions against economic boycotts. The contract is subject to the Department of Finance Administrative Code and the Code of Alabama 1975, with specific provisions for non-appropriation of funds and proration.
SHPO Office

POSTED

2 days ago

DEADLINE

in about 1 month
NAICS: 541720
New
SLED
Program Evaluation Services for the Local Community Benefits Fund
Solicitation # 2026-040
Solicitation 2026-040, issued by the Community Investments Office of the Air District, seeks a contractor to provide program evaluation services for 28 Round 1 grantees of the Local Community Benefits Fund. The project is designed to support the Air District's mission of improving air quality, reducing environmental inequities, and mitigating climate change across nine Bay Area counties. The contract has an established budget of 1,500,000 dollars and an anticipated duration of up to six years. The work is divided into two primary phases: Phase A, focusing on indicator tracking technical assistance for early grant implementation, and Phase B, which covers output tracking, analysis, and periodic program evaluation, culminating in a final synthesis of findings during years five and six. The selection process involves a two-phase evaluation consisting of a proposal review and an interview. Proposals are evaluated based on technical merit, with a preference given to local businesses headquartered within the Air District's jurisdiction. In the event of a tie in scoring, the lower cost offer will be accepted. Key requirements for respondents include a detailed technical proposal, a separate cost proposal, a disclosure regarding the use of Generative AI, and a commitment to retain project records for five years. The deadline for electronic submission via the procurement portal is November 30, 2026, at 4:00 pm Pacific Time.
Community Investments Office

POSTED

2 days ago

DEADLINE

in about 1 month

General Info

Contract Value

$10,013.71

NAICS

541720 - Research and Development in the Social Sciences and Humanities

Place of Performance

ND, USA

Set-Aside

NONE

Award Issued Date

Documents

3

First Larson Collector Sewer Main Maps and Elevation Data

PDF, High priority: read this firstspecifications
High

Minot Puppy Dog Sanitary Sewer Line Expansion Maps

PDF, High priority: read this firstspecifications
High

12-T-0138.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist St Paul
Contacts2 people available
OfficeSAINT PAUL, MN, 55101-1323, USA
Office AddressSAINT PAUL, MN, 55101-1323, USA

Full Description

Show more
SCOPE OF WORKhttp://websoilsurvey.nrcs.usda.gov/. Accessed 08/01/2012). The following table, based on the NRCS's official soil series descriptions, gives the profiles for these soil series (http://soils.usda.gov/technical/classification/osd/index.html. Accessed 08/01/2012). This soils information is provided for information purposes only; actual soil type and associated depths may vary. SOIL SERIES A HORIZON E HORIZON B HORIZONS BC HORIZONS C HORIZONS Zahl 0-13 cm ? 13-51 cm ? 51-152 cm Max 0-15 cm ? 15-94 cm ? 94-152 cm Williams 0-15 cm (Ap) ? 15-91 cm ? 91-152 cm ? ? 3.00 DEFINITIONS 3.01 Cultural Resources include any building, site, district, structure, object, data, or other material relating to the history, architecture, archeology, or culture of an area. 3.02 A Phase I Cultural Resources Investigation is an intensive, on-the-ground study of an area sufficient to determine the number and extent of the resources present and their relationships to project features. It will provide (1) data adequate to assess the general nature of the sites present; (2) recommendations for additional testing and/or archival research of those resources that may provide important cultural and scientific information; and (3) detailed time and cost estimates for Phase II testing and evaluation. 3.03 Phase II Testing and Evaluation is the intensive testing of and/or archival research on a resource that may provide important cultural or scientific information. This testing and archival research will result in (1) information adequate to determine whether the resource is eligible for inclusion on the National Register of Historic Places; (2) a Phase III mitigation plan for any eligible resources that will undergo a direct or indirect impact; and (3) detailed time and cost estimates for the mitigation. 3.04 Phase III Mitigation is the mitigation of direct or indirect impacts of construction upon eligible sites through the systematic removal of data. It typically includes the excavation of either complete cultural deposits or a systematic sample of them and the thorough analysis and interpretation of the data recovered. The excavation, analysis, and interpretation methods must be adequate to address the important research questions based on which the resource was determined eligible. In addition, because the mitigation process destroys the resource, data should be recovered that may be needed to address future research questions. 4.00 SURVEY AND TESTING REQUIREMENTS 4.01 The Contractor will conduct Phase I cultural resources investigation of the Puppy Dog Sanitary Sewer Expansion Project's proposed sewer main alignment along First Larson Coulee, 53rd Avenue SW, and 16th Street SW at the city of Minot, North Dakota, in accordance with Sections 2.01-2.05 and 3.02 above. 4.02 The Corps' Technical Representative for this contract is Ms. Virginia Gnabasik, St. Paul District archeologist, at +1 (555) 000-0000 or by email at 4.03 If the Contractor has questions regarding any aspect of the required work, conditions or provisions of this scope of work, the Contractor will contact the Contracting Officer and resolve the confusion before proceeding. The Contractor will not proceed with work that is or appears to be beyond this scope of work. If additional work is required, it must be authorized in a contract modification signed by a warranted contracting officer prior to performance. 4.04 The Contracting Officer shall be notified at least five business days prior to the start of field work, to allow the local sponsor to be notified. 4.05 Information on buried utilities in the project area vicinity is available from the city or the appropriate utility companies. The North Dakota One Call Excavation Notice System number for utility information is main office at +1 (555) 000-0000 and hotline at +1 (555) 000-0000. 4.06 The Contractor shall employ a systematic, interdisciplinary approach in conducting the study, using techniques and methods that represent the current state of knowledge for the appropriate disciplines. The Contractor will provide specialized knowledge and skills as needed, including expertise in archeology, history, geomorphology, and other social and natural sciences. 4.07 The Contractor's key personnel working on this project must meet the Secretary of the Interior's professional qualification standards for prehistoric archeologists, historic archeologists, and historians as given in the Standards and Guidelines for Archeology and Historic Preservation (as amended and annotated), which is available at 4.08 The Contractor is required by North Dakota Century Code 55-03-01 to obtain a cultural resources permit or archeological license from the Archaeology and Historic Preservation Division of the State Historical Society of North Dakota prior to the start of any field work. Contact Mr. Paul Picha, Chief Archaeologist, at +1 (555) 000-0000 for information and a permit application. Mr. Picha is also the point of contact for burial sites information. All permit fees are the responsibility of the Contractor and will not be subject to separate remuneration. 4.09 The Contractor will provide all materials and equipment necessary to perform the required services expeditiously. 4.10 The Contractor's survey will be an on-the-ground examination sufficient to determine the number and extent of any cultural resources present, including standing structures as well as prehistoric and historic archeological sites. 4.11 The Contractor's survey will include surface inspection in areas where surface visibility is adequate to reveal any cultural materials that are present and subsurface testing in all areas where surface visibility is inadequate, i.e., less than 30 percent. Subsurface investigation will include shovel testing, coring, soil borings, cutbank profiling, or other appropriate methods. If the field methods used vary from those that are required, they must be described and justified in the Contractor's report. 4.12 The survey interval required for subsurface testing is 15 meters (50 feet). However, this interval may vary depending upon field conditions, site density, or size. If a larger interval is used, this decision must be justified in the Contractor's report. 4.13 Shovel tests shall be a minimum of 1 meter (3 feet) deep. Hand auger tests shall be at least 1 meter deep and should be spaced at 10 meter intervals. 4.14 The Contractor's survey methodology should include deep testing using a 1-inch-diameter or larger soil probe, coring device, or bucket auger to determine if deeply buried cultural resources are present or potentially present in the project area. 4.15 Deep testing should extend down to 3 meters (10 feet) below the surface, if possible. While not able to guarantee the penetration of all soil-sediment materials or stratigraphic units to that depth, the Contractor will make every effort to insure that appropriate corings are made. 4.16 The Contractor will screen all subsurface tests through -inch mesh or smaller hardware cloth. 4.17 The Contractor will return all surveyed areas as closely as practical to presurvey conditions. In particular, care must be taken in removing lawn sod so that it can be replaced as closely as possible after the shovel test hole has been backfilled. Care should also be taken to minimize crop damage in agricultural fields. 4.18 The Contractor must keep standard records that include field notes and maps, subsurface testing forms, and photographs. 4.19 The Contractor shall use a global positioning system (GPS) device to delineate the boundaries of a site and any shovel test/auger test/coring/excavation unit locations so that the site and subsurface test locations can be more easily relocated. The Corps' preferred GPS data format is UTM (Projection), NAD 83 (Horizontal Datum), and Meters (Units). See Section 8.02 for additional details. 4.20 State site forms will be prepared for all sites discovered during the survey, and records on previously reported sites will be updated if new information is obtained. Data should be included on the present condition of each site and on the contents and locations of any collections from it. The Contractor will also submit all site forms and updates to the appropriate State agency. In addition, the UTM location of the site shall be noted on all state site forms. 4.21 The Contractor will recommend any Phase II testing and evaluation measures that are warranted. 4.22 The non-Federal sponsor for the project has acquired the necessary rights-of-entry for the proposed First Larson Coulee sewer main alignment to be surveyed for cultural resources under this contract. 4.23 If it becomes necessary in the performance of the work and services, the Contractor will, at no cost to the Government, secure the rights of ingress and egress on properties not owned or controlled by the Government or the non-Federal Sponsor. The Contractor will secure the consent of the owner, or the owner's representative or agent, in writing prior to effecting entry on such property. If requested, a letter of introduction signed by the District Engineer can be provided to explain the project purposes and request the cooperation of landowners. Where a landowner denies permission for survey or testing, the Contractor must immediately notify the Contracting Officer and must describe the extent of the property to be excluded from the survey or testing. 4.24 All cultural artifacts located during the course of the field work belong to the respective property owners. Reasonable efforts will be made by the Contractor to convince property owners to donate the material for curation to a facility meeting the requirements of 36 CFR Part 79 (Curation of Federally-owned and Administered Archeological Collections), so that these artifacts are available to future researchers. The Contractor shall have property owners willing to donate items sign a release form or donation agreement indicating such. Property owners desiring to keep artifacts should have these returned to them after inventory, cleaning, analysis, and photography have been completed. 4.25 The Contractor is responsible for making all curatorial arrangements with the Archaeology and Historic Preservation Division of the State Historical Society of North Dakota in Bismarck, which meets the requirements of 36 CFR Part 79, and has the ability to ensure the preservation of the artifacts and associated records and has procedures for making them available for research and public viewing. The Contractor is responsible for processing the artifacts recovered under the contract for accessioning by the curation facility and for delivering the processed artifacts to the facility. 4.26 Should the Contractor, in the course of conducting investigations under this contract, discover human remains, associated and/or unassociated funerary objects, sacred objects, or objects of cultural patrimony, activity in the vicinity of the discovery shall immediately cease. The Contractor shall immediately notify the appropriate officials at the Archaeology and Historic Preservation Division of the State Historical Society of North Dakota (SHPO) and otherwise follow North Dakota Century Code 23-06-07 and North Dakota Administrative Code 40-02-03 protecting prehistoric and historic burial sites, human remains and burial goods. As soon as practicable after discovery, the Contractor shall notify the Corps' Technical Representative of the discovery, its location, and any information on the nature of the discovery, including items found and their apparent age and condition. No further activity shall be allowed in the area of the discovery until the Corps completes the consultation process with the North Dakota SHPO and the appropriate Indian tribes. 5.00 GENERAL REPORT REQUIREMENTS 5.01 The Contractor shall submit the following documents, described in this section and Section 6.00: field notes, a field report, a draft contract report, and a final contract report. 5.02 The Contractor's field report will be a brief summary of the nature, extent and results of the field work conducted. It may be in the form of a letter to the Corps' Technical Representative. 5.03 The Contractor's field notes will include legible copies of important notes and records kept during the investigation. Especially important are the daily field journal of the Principal Investigator or field director, field site survey forms, and subsurface testing forms. One copy of these notes should be submitted to the Corps' Technical Representative with the draft contract report but should not be bound into the report. 5.04 The draft contract report will detail the approach, methods, and results of the investigation and make recommendations for further work. It will be submitted to the Corps' Technical Representative, who will review it and forward it to other appropriate agencies for review. Comments will be returned to the Contractor, who will make the necessary revisions and submit the final contract report. 5.05 The Contractor's draft and final reports will include at least the following sections, as appropriate to the study. The length of each section depends on the level of detail required of the study and the amount of information available. The reports should be as concise as possible, yet provide all the information needed for evaluating and managing the project and for future reference. a. Title page: The title page will provide the following information: the type of study; the types of cultural resources assessed (archeological, historical, and architectural); the project name and location (county and state); the date of the report; the Contractor's name; the contract number; the name of the author(s) and/or Principal Investigator; the signature of the Principal Investigator; and the agency for which the report is being prepared. b. Management summary: This section will provide a concise summary of the study, containing all the information needed for management of the project. This information will include the reason the work was undertaken, who the sponsor was, a brief summary of the scope of work and budget, a summary of the field work and lab analysis, the limitations of the study, the results, the significance of the results, recommendations for further work, and the repository for records and artifacts. c. Table of contents d. List of figures (includes plates) e. List of tables f. Introduction: This section will identify the sponsors (Corps of Engineers) and their reason for the study and present an overview of the study with each site located on USGS quad maps. It will also define the location and boundaries of the study area (using regional and area-specific maps); define the study area within its regional cultural and environmental context; reference the scope of work; identify the institution that did the work and the number of people and person-days/hours involved; give the dates when the various phases of the work were completed; identify the repository of records and artifacts; and provide a brief outline of the report and an overview of its major goals. g. Previous archeological and historical studies: This section will briefly summarize and evaluate previous archeological and historical research in the study area including the researchers, dates, extent, adequacy, and results of past work and any cultural/behavioral inferences derived from it. h. Environmental background: This section will briefly describe the current and prehistoric environment of the study area, including its geology, vegetation, fauna, climate, topography, physiography, and soils. The relationship of the environmental setting to the area's prehistory and history should be stressed. The level of detail in this section will be commensurate with that of the other report sections. i. Theoretical and methodological overview: This section will state the goals of the sponsor and the researcher, the theoretical and methodological orientation of the study, and the research strategies that were applied to achieve the goals. j. Field methods: This section will describe all field methods, techniques, and strategies and the reasons for using them. It will also describe field conditions, relevant topographic and physiographic features, vegetation conditions, soil types, stratigraphy, general results, and the reasons for eliminating any uninvestigated areas. k. Laboratory and analysis methods: This section will explain the laboratory methods employed and the reasons for selecting them. It will reference accession or catalog numbers of any collections, photographs, or field notes obtained during the study and state where these materials are permanently housed. It will also describe and justify the specific analytical methods used, including any quantitative analysis of the data, and discuss limitations or problems with the analysis. l. Results: This section will describe the cultural resources found during the study. It will minimally include each site's description (including size, depth, and artifact density); its location (USGS quad, legal description and UTM coordinates, and elevation); the amounts and types of remains recovered; its environmental setting; its current condition; the direct and indirect impacts of the project upon it; and any additional interpretations (e.g., site type, cultural components, and human behavioral information). m. Evaluation and conclusions: This section will formulate conclusions about the location, size, condition, and distribution of the resources found; their relationships to other sites in the area; and their possible importance in terms of local and regional prehistory, protohistory, and history. It will also relate the results of the study to the stated goals; identify any changes in the goals; assess the reliability of the analysis; and discuss the potential of and goals for future research. n. Recommendations: This section will recommend any further work deemed necessary. It will summarize Phase II evaluation measures that would be needed to determine whether specific resources are eligible for the National Register of Historic Places, as well as a time and cost estimate for this work. It will also describe any areas that were inaccessible and recommend future treatment of them. If the Contractor concludes that no further work is needed at any site, the evidence and reasoning supporting this recommendation will be presented. o. References: This section will provide bibliographic references (in American Antiquity format) for every publication cited in the report. References not cited in the report may be listed in a separate "Additional References" section. p. Appendices: This section will include the Scope of Work, resumes of project personnel; copies of all correspondence relating to the study; state site forms for all sites evaluated, artifact catalog sheets, and any other pertinent information referenced in the text. q. Figures: The locations of all sites and other features discussed in the text will be shown on legibly photocopied USGS 7.5' topographic quadrangle maps bound into the report. In addition, the locations of all subsurface tests will be indicated on maps of appropriate scale and detail, and keyed to the subsurface testing forms included with the field notes. Other recommended figures are regional and project maps, photographs of the project area, and line drawings or photographs of diagnostic artifacts, structures, and unit or feature profiles. r. Tables: The report should include tables of cultural materials by site and provenience (for example, excavation unit and level). Information that may require more detailed tabulation includes lithic tool types and raw materials, ceramic attributes, and floral and faunal remains. 6.00 FORMAT SPECIFICATIONS 6.01 There are no specific format requirements for the field report. A letter report is usually sufficient. 6.02 There are no format requirements for the field notes; however, they must be legible. If the original handwritten notes are illegible, they must be typed. 6.03 Formats for both the draft and final contract reports are as follows: a. The Contractor shall present information in a manner, whether textual, tabular, or graphic that provides the most effective communication method. b. The draft and final reports will be divided into easily discernible chapters, with appropriate page separations and headings. c. The final report text will be typed, single-spaced (the draft report should be space-and-one-half or double-spaced), on 20 lb bond paper, 8.5 inches by 11.0 inches, with 1.5-inch binding and bottom margins and 1-inch top and outer margins, and may be printed on both sides of the paper. All pages will be numbered consecutively, including plates, figures, tables, and appendices. d. All illustrations must be clear, legible, self-explanatory, and of sufficiently high quality to be reproduced easily by standard xerographic equipment, and will have margins as defined above. All maps must be labeled with a caption/description, a north arrow, a scale bar, township and range, map size and dates, and map source (e.g., the USGS quad name or published source). All photographs or drawings should be clear, distinct prints or copies with captions and a bar scale. 7.00 MATERIALS PROVIDED 7.01 The Corps' Technical Representative will furnish the Contractor with access to any publications, records, maps, photographs, or GIS shapefiles that are on file at the St. Paul District headquarters that are appropriate to the study being undertaken. 7.02 At the Contractor's request, the Corps' GIS coordinator (Mr. Keith LeClaire, phone: +1 (555) 000-0000) will provide a Federal Geographic Data Committee (FGDC) compliant Metadata package to generate the required metadata files. 8.00 SUBMITTALS 8.01 The field work completion date for this project will be September 21, 2012. The Contractor will contact the Corps' Technical Representative at least 5 days before the field work begins to discuss the field work schedule and plans. 8.02 All geospatial data produced under this work order must be provided to the Corps. This includes all source data used to generate digital products. a. All spatial data will be shipped in ESRI Shapefile or personal Geodatabase format. b. All spatial data will reference the appropriate UTM Zone, NAD 83, Meters. c. Locational referencing must be accomplished using a Global Positioning System (GPS) that must produce a horizontal accuracy of +/- 2 meters. d. All GPS data must be post-processed to remove atmospheric and systematic errors. The log file produced in the processing of the data must accompany the data. 8.03 All geospatial data provided must include a metadata file compliant with the Federal Geographic Data Committee (FGDC) Content Standards for Digital Geospatial Metadata. The Corps will provide a FGDC compliant Metadata package to generate these files upon the request of the Contractor (see 7.02 above). a. Metadata must be delivered at the same time as the final contract report. b. Metadata compliant files must be submitted as an email attachment to the following address: c. The metadata file must include a description of any digital data acquisition including GPS specifications, i.e., unit manufacturer, model, date and time of collect. 8.04 The Contractor will submit reports according to the following schedules: a. Field report: A brief letter report summarizing the field work and its results will be submitted to the Corps' Technical Representative with five (5) business days after the completion of field work. b. Draft contract report: Four (4) copies of the draft contract report will be submitted no later than 31 days after completion of the field work (NLT October 22, 2012). The draft contract report will be reviewed by the Corps of Engineers, the State Historic Preservation Office, and possibly other reviewers. The draft contract report will be submitted according to the report and contract specifications outlined in this scope of work. c. Project field notes: One legible copy of all the project field notes will be submitted with the draft contract report, but not bound into that report. d. Final contract report: The original (on CD) and 5 hard copies (on paper) of the final report will be submitted no later than 30 days after the Contractor receives the Corps of Engineers comments on the draft contract report (final report will be due on or before December 21, 2012). The final report will incorporate all the comments made on the draft report. The original copy of the final report should be submitted to the Corps on a CD. The original copy will consist of the entire final report, including all text, figures, tables, plates, and appendices. A legible copy of the project field notes should also be included on this CD. 8.05 Curation documents: No later than three (3) months after the final contract report is submitted to the Corps, the Contractor shall provide the Corps' Technical Representative with a copy of the signed curation agreement, copies of artifact inventory sheets with associated accession numbers, and a signed letter from the curation facility stating that all curation accession requirements have been satisfactorily completed (curation papers due on or before March 21, 2013). At this same time, the Contractor will also submit to the Corps' Technical Representative a signed and dated receipt from each landowner to whom artifacts recovered under this contract were returned. 9.00 CONDITIONS 9.01 Failure of the Contractor to fulfill the requirements of this scope of work may result in rejection of the Contractor's report and/or termination of the contract. 9.02 Neither the Contractor nor his representative shall release any sketch, photograph, report, or other materials of any nature obtained or prepared under this contract without specific written acceptance of the Corps' Technical Representative prior to the acceptance of the final report by the Government. Dissemination of investigation results through papers at professional meetings or publication in professional journals is encouraged. However, professional discretion should be used in releasing information on site locations where publication could result in damage to cultural resources. 9.03 All materials, documents, collections, notes, forms, maps, etc., that have been produced or acquired in any manner for use in the completion of this contract shall be made available to the Corps' Technical Representative upon request. 9.04 Principal investigators will be responsible for the validity of material presented in their reports. In the event of controversy or court challenge, the principal investigator(s) may be placed under separate contract to testify on behalf of the Government in support of the findings presented in their reports. 9.05 The Contractor will be responsible for adhering to all State laws and procedures regarding the treatment and disposition of human skeletal remains. Any human remains encountered will be treated with respect and will not be placed on public display. 10.00 METHOD OF PAYMENT 10.01 The Contractor may make requests for payment under this contract after completion of each contract line item. A letter summarizing work accomplished since the last invoice shall accompany the invoice, which shall reference the Corps' contract number. 11.00 ATTACHMENTS 11.01 Figures accompanying scope of work: a. Figure 1: U.S.G.S. 7.5' Minot topographic quadrangle showing location of proposed First Larson Coulee sewer main alignment. b. Figure 2: Air photo showing First Larson Coulee sewer main alignment to be surveyed for cultural resources. c. Figure 3: Photograph of First Larson Coulee sewer main alignment looking west from U.S. Highway 83. d. Figure 4: Photograph of First Larson Coulee looking west from near U.S. Highway 83, showing coulee bottom vegetation. e. Figure 5: Photograph of First Larson Coulee sewer main alignment looking east along 53rd Avenue SW. f. Figure 6: Construction drawing showing details on low water crossings of First Larson Coulee. g. Figure 7. Minot Puppy Dog Sanitary Sewer Line Expansion along First Larson Coulee, 53rd Avenue SW, and 16th Street SW. ? ? ? contact@example.gov. http://www.cr.nps.gov/local-law/arch_stnds_9.htm. Key personnel include the Contractor's principal investigator, field director, laboratory supervisor, and field crew contact@example.gov. PHASE I CULTURAL RESOURCES INVESTIGATION OF THE PROPOSED FIRST LARSON COULEE SEWER MAIN ALIGNMENT, PUPPY DOG SANITARY SEWER EXPANSION PROJECT, CITY OF MINOT, WARD COUNTY, NORTH DAKOTA ? 1.00 INTRODUCTION 1.01 The Contractor will undertake a Phase I cultural resources investigation of the proposed sewer main alignment along First Larson Coulee, 53rd Avenue SW, and 16th Street SW at the city of Minot, Ward County, North Dakota. This proposed sewer main is part of the city's Puppy Dog Sanitary Sewer Expansion Project. The proposed First Larson Coulee sewer main alignment is approximately 8,038 feet long (2,450 meters) by 100 feet (30.5 m) wide, for a total of approximately 18.5 acres. 1.02 This cultural resources investigation partially fulfills the obligations of the Corps of Engineers (Corps) regarding cultural resources, as set forth in the National Historic Preservation Act of 1966 (Public Law [PL] 89-665), as amended; the National Environmental Policy Act of 1969 (PL 91-190); the Archeological and Historical Preservation Act of 1974 (PL 93-291); the Advisory Council on Historic Preservation "Regulation for the Protection of Historic Properties" (36 CFR Part 800); and the applicable Corps regulations. Curation of recovered materials and associated records will be at a facility meeting the requirements of 36 CFR Part 79, Curation of Federally-owned and Administered Archeological Collections. 1.03 This cultural resources investigation will serve several functions. The report will be a planning tool to aid the Corps in meeting its obligations to preserve and protect our cultural heritage. It will be a comprehensive, scholarly document that not only fulfills federally mandated requirements, but also serves as a scientific reference for future professional studies. It will identify resources that may require additional investigations and that may have potential for public-use development. Thus, the report must be analytical, not just descriptive. 2.00 PROJECT DESCRIPTION 2.01 The city of Minot is proposing construction of part of their Puppy Dog Sanitary Sewer Expansion Project along First Larson Coulee, 53rd Avenue SW, and 16th Street SW under the Corps of Engineers' Section 594 Environmental Infrastructure Improvements Program. Sanitary sewer construction under the 594 program specifically involves extending the 24-inch First Larson Coulee interceptor sewer main from approximately 300 feet west of U.S. Highway 83 west along the coulee bottom to the Crystal Springs development at 53rd Avenue SW and 16th Street SW, and installation of a 12-inch collector sewer line from the First Larson interceptor sewer line north along 16th Street SW to the natural watershed divide between First Larson Coulee and Puppy Dog Coulee (Figures 1, 2 and 7). 2.02 The proposed sewer main alignment along First Larson Coulee, 53rd Avenue SW, and 16th Street SW is located in the NE'NE'SE, S'SE'NE, SE'SW'NE, N'NW'SE, SW'NW'SE, SE'NE'SW, N'SE'SW, E'SW'SW , W'SW'SW, and W'SW'NW'SW, Section 2, and the E'ESE'SE and E'ESE'NE'SE, Section 3, Township 154 North, Range 83 West, Ward County, North Dakota (Figure 1). 2.03 The proposed sewer main alignment is approximately 8,038 feet (1.52 miles/2,450 meters) long by 100 feet (30.5 m) wide, for a total of approximately 18.5 acres. The permanent sewer line easement will be 40 feet wide (15 feet on the north/east side and 25 feet on the south/west side of the sewer pipe centerline). There will be 30-foot-wide tempora...

More opportunities from Department Of Defense → W07V Endist St Paul

Same awarding agency

NAICS: 541930
New
Federal
FY27 ASL Interpretation Services for USACE MVP
Solicitation # W912ES27QA005
Solicitation W912ES27QA005 is a firm fixed-price contract for American Sign Language (ASL) interpretation services to support the U.S. Army Corps of Engineers (USACE) St. Paul District in Saint Paul, Minnesota. This opportunity is a total small business set-aside under NAICS code 541930. The period of performance runs from November 15, 2026, to November 14, 2027, and consists of two primary line items: 300 hours of interpretation services and one general job. The government will award the contract to the responsible offeror providing the most advantageous offer, with the primary evaluation factor being the lowest hourly rate. Award considerations include the total price of all options and risk assessments from the Supplier Performance Risk System regarding item, price, and supplier performance. Offerors must submit their quotes electronically through the PIEE Solicitation Module by November 13, 2026. Compliance requirements include adherence to the Buy American and Balance of Payments Program, the Service Contract Act for prevailing wages in Minnesota and Wisconsin, and various non-discrimination and safety standards. While there is conflicting guidance regarding the use of Wide Area Workflow (WAWF), the St. Paul District indicates that invoices should be submitted according to the Statement of Work. All inspection and acceptance of services will occur on-site at the St. Paul District Army Corps Engineer Centre.
Translation and Interpretation Services

POSTED

about 12 hours ago

DEADLINE

in 15 days
View Details
NAICS: 541620
New
Federal
Phase I Environmental Site Assessment at Lower Grey Cloud Slough Islands
Solicitation # W912ES27QA010
Solicitation W912ES27QA010 is a firm fixed price contract issued by the U.S. Army Corps of Engineers, St. Paul District, for a Phase I Environmental Site Assessment (ESA) at the Lower Grey Cloud Islands. This procurement is a total small business set-aside under NAICS code 541620. The period of performance is scheduled from December 1, 2026, to May 1, 2027, with the final delivery of the assessment requested by May 1, 2027. The project requires the contractor to produce a draft and final ESA report in Microsoft Word format, adhering to USACE 1165-2-132 and ASTM E1527-21 standards, along with native electronic formats for all maps, figures, and geospatial shapefiles. The contract will be awarded based on the lowest price technically acceptable (LPTA) criteria, with the government evaluating the total price of the basic requirement and any applicable options. Key administrative requirements include active registration in the System for Award Management (SAM) and compliance with various FAR and DFARS clauses, including cybersecurity reporting, Buy American preferences, and prevailing wage laws. Inspection and acceptance will be managed by Tom Reinhardt at the St. Paul District office in Minnesota. Invoices are to be submitted to the Contracting Officer's Representative, though the solicitation contains conflicting instructions regarding the use of Wide Area Workflow (WAWF).
Environmental Consulting Services

POSTED

about 12 hours ago

DEADLINE

in 13 days
View Details
NAICS: 334513
New
Federal
Industrial Variable Frequency Drives (VFDs)
Solicitation # W912ES26QA115
Solicitation W912ES26QA115, issued by the U.S. Army Corps of Engineers St. Paul District, is a total small business set-aside for the procurement of factory-new, commercial-off-the-shelf ABB ACS880 Series Variable Frequency Drives (VFDs). These units are required for critical operations on the Dredge Goetz, including the cutter head, main pump motors, ladder, swing, spud, and carriage drives. To ensure system compatibility and prevent unacceptable downtime, the government has issued a brand name justification limiting competition to ABB brand spares. The requirement consists of four line items: one 690V Drive Module (430A), one 500V Wall-Mounted Drive (302A), one 500V Wall-Mounted Drive (124A), and two 690V Drive Modules (721A), all featuring specific factory-installed plus-codes and technical specifications. The contract will be awarded as a single firm-fixed-price agreement to the responsible offeror providing the most advantageous price. All equipment must be 100 percent factory-new, meeting IEEE, UL, and CE standards, and must include a minimum 12-month warranty from commissioning or 18 months from delivery. Deliverables include a technical data package and a Certificate of Conformance. Items must be crated per ASTM industrial standards, moisture-barrier wrapped, and marked with permanent OEM nameplates and DoD unique identification per MIL-STD-130. Delivery is required by February 26, 2027, to the Civil Works Service Base in Fountain City, Wisconsin, with shipping costs included in the CLIN pricing. Offers must be submitted in PDF format via the PIEE Solicitation Module by the final deadline of November 9, 2026.
Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables

POSTED

1 day ago

DEADLINE

in 11 days
View Details
NAICS: 332439
New
Federal
2-20 foot Containers with Gantry Beam and Chain Lift
Solicitation # W912ES27QA004
Solicitation W912ES27QA004 is a total small business set-aside for a firm-fixed-price contract to procure two brand-new 20-foot High Cube open-side storage containers for the U.S. Army Corps of Engineers. The containers require custom structural steel fabrication of a 1-ton capacity Load Handling Equipment crane and hoist system, featuring a 6-foot external extension and an internal counterweight system. Key technical requirements include a design safety factor of 5:1 per ASME B30 standards, PE-stamped structural calculations, and compliance with EM 385-1-1. All modified components must be coated in industrial Safety Yellow paint and the units must be marked with DoD Item Unique Identification in accordance with MIL-STD-130. The contractor is responsible for turnkey ground delivery to Fountain City, Wisconsin, with a final delivery deadline of March 1, 2027. Final acceptance is contingent upon a physical inspection and successful field demonstration by USACE staff, including a 125% proof load test and verification that the hoist traverses the full length of the gantry rails without binding. Offerors must submit technical descriptions, product data sheets, and drawings via the PIEE Solicitation Module. Evaluation will be based on technical acceptability, price consistency with historical data, and risk assessments conducted through the Supplier Performance Risk System.
Other Metal Container Manufacturing

POSTED

1 day ago

DEADLINE

in 6 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS