AI Contract Overview
The Cass Highwall Project, located in Cass Township, Muskingum, Ohio, focuses on reclaiming legacy undrained highwall impoundments from mid-century surface mining operations. The primary objective is to mitigate public hazards by draining mine pits, backfilling exposed highwalls to establish stable drainage, and restoring the land configuration. Key deliverables include the construction of dedicated drainage channels in valley regions and the installation of a permanent sediment pond featuring an engineered embankment dam and emergency spillway on the western boundary. The scope of work involves the dewatering of approximately 2.7 million gallons of water, 155,000 cubic yards of earthwork, and the restoration of 32 acres through clearing and revegetation. Additional requirements include 11,000 square yards of channel stabilization and 4,200 cubic yards of embankment fill. The engineer's estimate for the project is 1,412,136.00 dollars. A mandatory pre-bid meeting is scheduled for September 29, 2026, at 10:00 AM at 9425 Schneider Lane, Dresden, Ohio.
General Info
Place of Performance
Set-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- Imperial Irrigation District – East Highline ReservoirOpen now, due in 16 days
- Request for Quote for Reservoir Seismic Retrofit And Replacement Project For Bella Vista ReservoirOpen now, due in 2 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
The Project includes a series of legacy, undrained highwall impoundments resulting from surface mining operations in the 1950’s and early 1960s. The intent of the reclamation project is to reduce the hazards associated with surface mine highwalls and impoundments, create positive drainage, and restore the mined areas to a more stable, functional land configuration. The highwall impoundments have been assessed and determined to pose a hazard on the public and the overall project goal is to mitigate those hazards.
The primary project work includes:
* Drain existing mine pits and backfill exposed highwalls using available mine spoils to establish stable, positive drainage. * Construct dedicated drainage channels within valley regions to control surface runoff. * Establish a permanent sediment pond at the drainage channel outlets, by constructing an engineered embankment dam and integrated emergency spillway on the western boundary.
Major work items: * Impoundment Dewatering – Approximately 2.7 Million Gallons (Mgal). * Site Preparation and Restoration - Clearing, grubbing, and subsequently revegetating approximately 32 acres.
* Earthwork - Approximately 155,000 Cubic Yards (CY) of earthwork to eliminate highwall impoundments and create positive drainage. * Channel Stabilization – Approximately 11,000 Square Yards (SY) of geotextile or protective channel lining * Embankment Construction – Approximately 4,200 Cubic Yards (CY)) of embankment fill for permanent sediment pond.
Other work items include installation of underdrains and aggregate drains (as needed), rock excavation, tree planting and revegetation of the site prior to completion of the project.
The project officer for this project is Laura Cross in the Cambridge Office +1 (•••) •••-••••Sign up to see this detail, and the project engineer is Ron Warner, P.E. in the Cambridge Office (740) +1 (•••) •••-••••Sign up to see this detail.
Engineer's Estimate: $1,412,136.00 Project Location: The addresses are 9425 Schneider Lane Dresden, Ohio 43821 and 9417 Schneider Lane Dresden, Ohio 43821. The project’s latitude and longitude are 40.088942°, -82.03795°. Pre-bid Meeting Location (Mandatory): 9425 Schneider Lane Dresden, Ohio 43821
More opportunities from Ohio → ODNR-Division of Mineral Resources Management
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS