This Solicitation opportunity from Minnesota was posted on February 29, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
MN Judicial Center AHU 8 and 9 Fan Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves a comprehensive upgrade and replacement of the heating, ventilation, and air conditioning (HVAC) systems at the Minnesota Judicial Center, specifically focusing on Air Handling Units 8 and 9. The scope includes removing and replacing the supply and return fans, upgrading control systems from pneumatic to direct digital control (DDC), and integrating these controls with the Honeywell Building Automation System. Additionally, the project entails applying waterproof membranes and mold-resistant paints to the interior of the units, installing new plenum-rated insulation and caulking, and modifying electrical and fire alarm systems to accommodate the new fans and controls. The work is to be performed under a single prime contract covering general, mechanical, and electrical construction, with plans and specifications prepared by Michaud Cooley Erickson. The project is overseen by the Minnesota Department of Administration, with a solicitation posted in early 2024 and a response deadline set for late March 2024. The work aims to improve the functionality, safety, and environmental resilience of the HVAC systems in the judicial center, ensuring compliance with modern control standards and protective measures. The contract emphasizes coordination among various trades and adherence to specified technical requirements, with primary contact and further details available through the designated project contacts.
General Info
Place of Performance
MN, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- Install Pier D High Pressure Air System, NSBREM-724-AOpen now, due in 15 days
- Water Pump ReplacementOpen now, due in 13 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction.
B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract.
1. Demo and replacement of the supply and return fans in AHU 8 and 9. 2. Upgrade AHU controls from pneumatic to DDC. 3. Apply new waterproof membrane to floor of AHU. 4. Add Fosters paint to interior of AHU. 5. New watertight rubber membrane to be installed on the interior of AHU floor. 6. New mold and fungal protective paint (Fosters Paint) to be applied to interior portions of AHU. 7. Apply new plenum rated insulation/caulking where previously removed. 8. Electrical modifications of new fans. 9. Fire alarm modifications for new fans. 10. Convert existing pneumatic controls to DDC and incorporate with Honeywell BAS system. Plans and Specifications were prepared by Michaud Cooley Erickson, Contact: Sarah Marvel, 333 S. 7th Street, Suite 1200, Minneapolis, MN 55402; phone Sign up to see this detail; Sign up to see this detail
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
