This Solicitation opportunity from California was posted on March 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Modernization of Busch Garden and Rosemont Sewer Pump Stations (76917)

Closed
2026-IFB-CIV-0048State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction effort for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key station improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers, manholes, and various site improvements including stormwater facilities, fencing, and paving. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 10, 2026, and must include a bid bond, a completed bid form, and evidence of authority to sign. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and insurance from companies with an A.M. Best rating of A-VII or better. Performance is measured by the Engineer's issuance of a Certificate of Substantial Completion, with technical adherence to AWWA, NEMA, AWS, and ASTM standards. Payment is processed via Applications for Payment and becomes due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The City of Pasadena is soliciting bids for the modernization of its Busch Garden and Rosemont sewer pump stations, both of which are over 70 years old and require substantial upgrades to critical infrastructure elements. These upgrades include improvements to station housing, generators, ventilation systems, SCADA communications, and site access aimed at enhancing overall operational reliability and safety. Although the Rockwood Pump Station, built in 2016, remains current, the planned renovations for Busch Garden and Rosemont will reduce the risk of sanitary sewer overflows, provide faster emergency response through advanced communications, improve worker safety, and ensure uninterrupted wastewater flow into the city’s gravity sewer system. The contract is issued by the Public Works Department, Engineering division of Pasadena, California, with a bid deadline in April 2026. The contract documents establish a federally funded labor and materials agreement governed by California prevailing wage laws and Pasadena living wage ordinance, requiring compliance with equal employment opportunity standards and conflict of interest disclosures. Bidders must certify noncollusion, disclose any civil litigation or disqualification history related to public contracts, and submit detailed forms on workforce utilization and relevant project experience. The City emphasizes transparency and integrity throughout the procurement process, mandating submission of subcontractor listings, identity confirmation, and adherence to bonding and change order protocols. Overall, this project represents a significant investment in critical public infrastructure aimed at long-term system resilience and public health protection.

General Info

Pasadena seeks bids to modernize two aging sewer pump stations by April 2026.

Documents

15

City of Pasadena Master Labor & Materials Contract Template

PDF, High priority: read this first15 pages · contract-document
High

Civil Litigation History Certification

PDF, High priority: read this first2 pages · past-performance
High

Contract 31671 - Supplemental Technical Specifications for Sewer Pump Stations Modernization

PDF, High priority: read this firstspecifications
High

IFB 2026-IFB-CIV-0048 Modernization of Busch Garden and Rosemont Sewer Pump Stations

PDF, High priority: read this firstifb
High

Insurance Requirements for Construction Contracts

PDF, High priority: read this firstinsurance-requirements
High

PW Contract Federally Funded - City of Pasadena Labor and Materials Contract

PDF, High priority: read this firstcontract-document
High

Rosemont and Busch Garden SPSs Rehab Final Design Drawings 2025-10-29

PDF, High priority: read this firstspecifications
High

City of Pasadena Conflict of Interest Disclosure and Certification

PDF, Low priority2 pages · special-notice
Low

Disqualification Disclosure Form

PDF, Low priority1 page · other
Low

Identity Confirmation Form

PDF, Low priority1 page · identity-confirmation
Low

Noncollusion Declaration for Bid Submission

PDF, Low priority1 page · noncollusion-declaration
Low

Public Contract Code Disclosure Statement

PDF, Low priority2 pages · other
Low

Relevant Experience Form for Bid Submission

PDF, Low priority5 pages · relevant-experience-form
Low

Required Forms - Vendor Questionnaire and Workforce Utilization

PDF, Low priority3 pages · other
Low

Subcontractor Listing and Shoring Design Form

PDF, Low priority1 page · supporting-document
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works Department, Engineering
Contacts2 people available
OfficePasadena, CA, 91101, USA
Office AddressPasadena, CA, 91101, USA
Contacts
Janina Lyka BaizaAssociate Engineer
Antonio WatsonProject Manager

Interested Companies (4)

Triton ConceptsIrvine, CA
Mehta MechanicalLa Palma, CA
Charles P CrowleyIrwindale, CA

See All 4 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The City of Pasadena manages three sewer pump stations that pump waste up to a higher elevation for deposit into the City's gravity sewer system. As part of the FY 2019 Sewer Master Plan process, all three pump stations were inspected according to current standards. Rockwood Pump Station was constructed in 2016, but Rosemont and Busch Garden pump stations are each over 70 years old and require upgrades to station housing, generators, ventilation systems, SCADA communications, and site access. These upgrades will decrease the possibility of sanitary sewer overflows, shorten response time with updated communications features, increase worker safety, and ensure uninterrupted wastewater flow.

More opportunities from California → Public Works Department, Engineering

Same awarding agency

NAICS: 423610
SLED
Street Light Poles And Fixtures Restocking Multi-Year
Solicitation # 2026-IFB-MS-0532
The City of Pasadena Public Works Department, Engineering, is seeking bids for solicitation 2026-IFB-MS-0532 to establish a multi-year purchase order for the as-needed procurement of streetlight poles, LED fixtures, and related restocking equipment. The contract will have an initial term of three years from the date of execution with no optional extensions. Deliverables include various Caltrans aluminum and steel poles, concrete poles, and specific LED fixtures, all of which must be delivered in new and unused condition to the Street Lights and Traffic Signals facility at the Pasadena City yards. Deliveries are restricted to Monday through Thursday between 7:00 a.m. and 3:00 p.m., requiring 24-hour prior notification. The City has allocated a shipping cost cap of 20,000 dollars. The contract will be awarded to the lowest responsive and responsible bidder based on the lowest grand total price. Bidders must submit their proposals via the City's eProcurement Portal by 2:00 p.m. on October 29, 2026, and must provide a Unique Entity Identifier (UEI) to be considered responsive. Required certifications include compliance with equal opportunity employment, non-collusion, and a 30 percent minimum recycled content requirement. Vendors must maintain a minimum Commercial General Liability insurance limit of 2,000,000 dollars per occurrence. While the contract is as-needed with no guaranteed minimums, the contractor may request unit price increases after the first year, capped at the regional Consumer Price Index.
Electrical Apparatus and Equipment, Wiring Supplies, and Related Equipment Merchant Wholesalers

POSTED

13 days ago

DEADLINE

in 8 days
View Details
NAICS: 423610
SLED
CDBG ADA Push Buttons Upgrades
Solicitation # 2026-IFB-MS-0467
The City of Pasadena Department of Public Works is soliciting bids for the material procurement of Americans with Disabilities Act (ADA) accessible pedestrian signal (APS) push buttons, control units for traffic signal cabinets, and miscellaneous appurtenant items. This project is funded by the Community Development Block Grant (CDBG) and requires materials to meet specific technical standards, including Caltrans 2024 Standard Plan ES-7A for posts and City of Pasadena Standard Plan S-973 for pull boxes. Deliverables include 4'6" high posts and 1.5" hot-dip galvanized rigid steel conduit, with all power supplies requiring CE/UL certification. The contract will be awarded to the lowest responsive and responsible bidder based on the grand total price submitted via the City's eProcurement Portal by October 28, 2026. The contract is subject to stringent federal and state regulations, most notably the Build America, Buy America Act (BABA), which mandates that iron, steel, and construction materials be produced in the United States. Contractors must comply with the higher of the applicable federal or state prevailing wage rates and adhere to the Contract Work Hours and Safety Standards Act for contracts exceeding $100,000. Additional requirements include maintaining a minimum Commercial General Liability insurance limit of $2,000,000 per occurrence, providing a Unique Entity Identifier (UEI) via SAM.gov, and certifying compliance with non-collusion and equal opportunity employment practices. The initial term of the contract is one year from the date of execution, with deliveries made FOB Destination to the Pasadena City Yards.
Electrical Apparatus and Equipment, Wiring Supplies, and Related Equipment Merchant Wholesalers

POSTED

13 days ago

DEADLINE

in 7 days
View Details
NAICS: 541330
SLED
Construction Management for Holly Street Bridge Seismic Retrofit & Rehabilitation Project (HBP)
Solicitation # 2026-RFP-0213
The City of Pasadena Public Works Department, Engineering division, is soliciting proposals for construction management services for the Holly Street Bridge Seismic Retrofit and Rehabilitation Project. This federally funded initiative, supported by the Highway Bridge Program, involves the rehabilitation and seismic retrofitting of a structurally deficient 1925 concrete arch-deck bridge over the Arroyo Seco channel. The scope of work includes on-site inspection and materials testing, with a critical requirement that all work be completed and the bridge fully reopened to public vehicular traffic by April 30, 2028, in preparation for the LA28 Olympic Games. Construction is estimated to last between 12 and 18 months, and the project mandates strict adherence to the Secretary of the Interior’s Rehabilitation Standards for historic preservation, as well as Caltrans and City of Pasadena codes. Proposals must be submitted electronically via the City's eProcurement Portal by October 29, 2026, at 2:00 PM ET, followed by the submission of one signed original and four bound hard copies within three business days. The selection process is competitive and based on total average points, evaluating technical qualifications and price separately. Key evaluation factors include the proposer's experience with similar projects, familiarity with the Highway Bridge Program, and the qualifications of the designated Construction Manager. Bidders must provide a lump-sum price proposal in a separate sealed envelope and must hold a California Professional Engineer License. Compliance requirements are extensive, including federal-aid contract provisions, Buy America standards, prevailing wage laws, and various certifications regarding non-collusion, lobbying, and equal employment opportunity.
Engineering Services

POSTED

14 days ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS