Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on July 25, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Modoc National Forest; Parker Creek Road Emergency Realignment

Closed
FS1104640Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 115310
New
SLED
San Poil Forest, Louie Creek
Solicitation # LoisCreen2026.pdf
The Confederated Tribes of the Colville Reservation is soliciting bids for an excavator piling and scarification project totaling 90.8 acres within the Louie Creek logging area on the Colville Indian Reservation. The scope of work includes piling logging slash and debris, removing brush and standing dead trees, and removing non-merchantable trees exhibiting dwarf mistletoe. Contractors must utilize equipment with low ground pressure of less than 8.5 p.s.i. and are required to construct water bars on slopes to prevent water channeling. Performance will be monitored by a designated Contract Officer’s Representative from San Poil Forestry, who will conduct inspections in each unit to ensure quality and progress. Bids must be submitted in a sealed envelope to the San Poil Forestry locked box at the Mt. Tolman Fire Center by November 5, 2026, at 4:00 PM. Mandatory submission requirements include a bid on every inspection item, a bid evaluation form, a contracting and subcontracting plan, and proof of SAM.gov registration. Evaluation factors include technical qualifications, reasonable pricing, and a strong emphasis on Indian preference in the award of contracts and subcontracts. Contractors must provide liability insurance and are encouraged to obtain a Trader License and TERO Tile ID certification to avoid specific fees. All work must comply with the Tribal Occupational Safety and Health Administration standards and applicable federal and state laws.
Confederated Tribes of the Colville Reservation

POSTED

about 19 hours ago

DEADLINE

in 6 days
NAICS: 115310
New
SLED
San Poil Forest, 3 commercial thinning contracts
Solicitation # thinningcontract2026.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry and the Tribal Employment Rights Office, is soliciting bids for three commercial pre-commercial thinning contracts located in the 30 Mile Logging area of the Colville Indian Reservation. The scope of work involves thinning operations across three specific units: SP-06-PCT-27 (39.7 acres), SP-07-PCT-27 (33.0 acres), and SP-08-PCT-27 (37.0 acres). Key technical requirements include the felling of overtopped or suppressed trees, the removal of all mistletoe-infected trees, and specific slash management to create a uniform fuel bed. Quality standards mandate that stumps be cut below five inches and that brush or hardwoods interfering with leave trees be cleared within a four-foot radius. Bids must be submitted in a sealed envelope labeled 30 Mile PCT 2027 and deposited in the San Poil Forestry Drop-Off Box at the Mt. Tolman Complex by 4:00 PM on November 2, 2026. The award process emphasizes Indian Preference and requires bidders to provide a bid per acre and a total bid price. Essential submission documents include a work plan, bid sheet, debarment certification, TERO compliance forms, and proof of liability insurance. Contractors must also obtain a BIA Trader License and adhere to TOSHA safety standards. Payment terms include a 20 percent withholding until final approval, with partial payments authorized for units exceeding 10 acres. Final acceptance is contingent upon a final inspection by the Contracting Officer's Representative and the complete removal of all debris from the units.
Confederated Tribes of the Colville Reservation

POSTED

about 19 hours ago

DEADLINE

in 3 days
NAICS: 115310
New
SLED
San Poil Forest, McAllister Creek PCT Highway 21 Blocks 2027
Solicitation # McAllister-Creek-PCT-Highway-21-Blocks-2027.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry, is soliciting bids for two Pre-Commercial Thinning (PCT) contracts in the McAllister Creek area on the Colville Indian Reservation. The project encompasses a total of 23.77 acres, divided between Unit SP-15-PCT-27 (10.33 acres) and Unit SP-16-PCT-27 (13.44 acres). The scope of work requires the selection and retention of the most vigorous trees, strict slash management including clearing roadways and streams, and the removal of all foreign debris. Contractors must adhere to specific technical standards, such as maximum stump heights of one-half the stump diameter and a maximum slash height of 24 inches, with financial penalties of 3 dollars per tree for damage to leave trees. Bids must be physically submitted to the mailbox at the Mt Tolman Complex by 4:00 PM on November 17, 2026, as electronic submissions are prohibited. A complete bid packet must include a bid sheet, bid evaluation form, a detailed work plan, TERO compliance and utilization forms, and a signed debarment certification. Award decisions are based on the contractor being responsive and responsible, though the lowest bid is not guaranteed to be accepted. Payment is issued per completed and accepted acre, with 20 percent of each payment withheld until final acceptance. Contractors are required to provide liability insurance and comply with TERO Title X and TOSHA safety regulations.
Confederated Tribes of the Colville Reservation

POSTED

about 19 hours ago

DEADLINE

in 18 days
NAICS: 115310
New
Grant
Landscape Scale Restoration Grant Program for Tribes
Solicitation # USDA-FS-2026-LSR-TRIBAL
The Landscape Scale Restoration Grant Program for Tribes, solicitation USDA-FS-2026-LSR-TRIBAL, is a competitive funding opportunity administered by the USDA Forest Service. The program supports collaborative, science-based forest restoration projects on rural non-industrial private forest land, rural state or local government forest land, and Indian trust or fee lands. Projects must align with a science-based restoration strategy, such as a Tribal Forest Plan, and focus on reducing wildfire risk, improving fish and wildlife habitats, maintaining water quality, or mitigating invasive plants, insects, and disease. Total program funding is 1.26 million dollars, with individual awards ranging from 100,000 to 300,000 dollars. A mandatory 1:1 non-Federal cost-share match is required for all grant recipients. Applications must be submitted via email to [email hidden] by January 26, 2027. Required documentation includes a project narrative limited to five pages, a detailed budget spreadsheet, and a valid Unique Entity Identifier from SAM.gov. Projects involving equipment purchases must submit form FS 1500-34, and all applicants must undergo a risk assessment and submit a financial capability questionnaire prior to award. The evaluation process is based on a 100-point scale focusing on deliverables, goals, strategy integration, and sustainability. Awarded projects must be completed within three years, with possible extensions up to five years. Performance is measured by quantitative outcomes in hazardous fuels management, invasive plant treatment, or insect and disease management.
Forest Service

POSTED

1 day ago

DEADLINE

in 3 months
NAICS: 115310
New
Grant
Landscape Scale Restoration Grant Program for Non-Federal Lands
Solicitation # USDA-FS-2026-LSR
The Forest Service is offering the Landscape Scale Restoration (LSR) Grant Program for Non-Federal Lands under solicitation USDA-FS-2026-LSR to support collaborative, science-based restoration of priority forest landscapes. The program focuses on reducing wildfire risk, improving fish and wildlife habitats, maintaining water quality and watershed function, and mitigating invasive plants, insects, and disease. Eligible projects must be conducted on rural non-industrial private forest land or rural state and local government forest land, where rural is defined as areas outside Census places with more than 50,000 people. All applications, except those from federally recognized Tribes and Tribal organizations, require sponsorship from the relevant State Forester. Funding is provided through a competitive process with a total program funding of 11,340,000 dollars and an expected 30 awards. Individual awards range from a minimum of 100,000 dollars to a maximum of 300,000 dollars for single-state projects and 600,000 dollars for multi-state projects. A 1:1 non-federal cost share match is required. The period of performance is three years, with a possible two-year extension, not to exceed five years in total. Applicants must be registered in SAM.gov and provide a Unique Entity Identifier. Awards are determined by a ranked project list based on a 100-point scoring system, evaluating factors such as goals and objectives, integration with State Forest Action Plans, cross-boundary collaboration, and sustainability of outcomes. Before awarding funds, the Forest Service conducts a risk assessment based on financial stability and performance history, requiring the submission of a Financial Capability Questionnaire. Applications must be submitted via Grants.gov by January 26, 2027.
Forest Service

POSTED

1 day ago

DEADLINE

in 3 months

General Info

NAICS

115310 - Support Activities for Forestry

Place of Performance

Alturas, CA, 96101, USA

Set-Aside

SBA

Documents

10

1104640 Submittal List and Government Furnished Property

DOCX, High priority: read this first1 page · specifications
High

A06+1104640 NRE Construction RFQ

DOCX, High priority: read this firstrfq
High

FP-14 Road Supplementals

DOCX, High priority: read this firstspecifications
High

FP-14 Standard Specifications for Construction of Roads and Bridges

DOCX, High priority: read this firstspecifications
High

General Decision Number CA20230007 - California Wage Determination

TXT, High priority: read this first39 pages · wage-determination
High

Parker Creek Realignment Design Plans - Modoc National Forest

PDF, High priority: read this first9 pages · specifications
High

Parker Creek Road Emergency Realignment - Schedule of Items

DOCX, High priority: read this first1 page · specifications
High

Standard Form 18 - Request for Quotation

PDF, High priority: read this first1 page · rfq
High

A01+1104640 Overview Map

PDF, Low priority1 page · specifications
Low

FS1104640 Q&A

XLSX, Low priority2 pages · q-and-a
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → USDA Forest Service-Spoc Software
Contacts1 person available
OfficeWashington, DC, 20250, USA
Office AddressWashington, DC, 20250, USA
Contacts
G. Jeremy Staggs

Full Description

Show more
DESCRIPTION OF WORK: Modify the existing alignment of the Parker Creek Road NFSR 31 (42N31) to improve its safety, efficiency, capacity, and alignment due to a washout that occurred from this winter's snow storms and water runoff that removed half of the current corridor layout. General intent is to reshape the failed slope and pull material uphill to create a more natural terrain, eliminate the old log landing and shift the road uphill (to the south). The required work will include construction, traffic management, and project management to coordinate all necessary parts of pre-design to post construction phases. SITE VISIT: The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed. 3-days are being provided for the respective bidders to visit the project location Site is open to the public and available any time for visitors. PROJECT LOCATION: Parker Creek Road NFSR 42N31 (31 Road) ~ 1.5 miles to 1.7 miles from the intersection of County Road 56 and West Warner NFSR 5 (42N05). To get there take County Road 56 from Alturas approximately 5 miles due east until you get to the intersection of County Road 56 and West Warner NFSR 5 (42N05). Take a left onto Parker Creek Road NFSR 42N31 (31 Road) until you reach your destination where the road has been modified to a single lane roadway. Stockpile aggregate provide by the forest service is on Parker Creek Road NFSR 42N31 (31 Road) less than one mile to the west of the main project site. SPECIFIC WORK REQUIREMENT: Contractor shall provide all equipment, supplies, superintendence, materials, and labor necessary to complete the work in accordance with the specifications and drawings. Work shall be conducted in accordance with the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14 as supplemented by the attached Forest Service Supplemental Specifications, the attached drawings, and the FAR Clauses listed in the parent contract. Warning signs and temporary traffic control shall be provided and placed in accordance with MUTCD standards while work is in progress. PROSECUTION OF WORK: Construction activity shall be limited to the hours between 5:30 a.m. and 7:00 p.m., Monday through Friday, unless other hours are approved in writing by the CO. No work shall be conducted on federal holidays. The Contractor shall conduct activities so that interference with the public shall be kept at a minimum. Any activities requiring closure to the public shall be scheduled with the COR at least 7 days in advance. The Contractor shall use measures and precautions necessary to warn and protect the public and Government personnel during work at the project site. Such actions include, but are not limited to, furnishing and maintaining barricades and signs around the work site and roping off the area. COMMENCEMENT PROSECUTION, AND COMPLETION OF WORK (FAR 52.211-10) (APR 1984): The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 90 days. The time stated for completion shall include final cleanup of the premises. MEASUREMENT AND PAYMENT: Measurement and payment for all work done on this project shall be in accordance with the Standard Specifications for Construction of Roads and Bridges on Federal Highways Projects, FP-14, and the attached Supplemental Project Specifications. All invoices shall be processed through IPP. Contractor shall provide all equipment, supplies, superintendence, materials, and labor necessary to complete the work in accordance with the specifications and drawings. Work shall be conducted in accordance with the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14 as supplemented by the attached Forest Service Supplemental Specifications, the attached drawings, and the FAR Clauses listed in the parent contract. Warning signs and temporary traffic control shall be provided and placed in accordance with MUTCD standards while work is in progress. SUBMITTAL FORMAT: Submittals shall include the following unless otherwise required in the specification: 1. Date and revision dates. 2. Project name and contract number. 3. Name of Contractor, subcontractor, supplier, and manufacturer. 4. Specification section number. 5. Field dimensions and relation to adjacent structures. 6. Applicable standards such as ASTM or Federal Specifications. 7. Contractor's stamp, initial or signature, certifying the review of the submittal, verification of field measurements and compliance with contract documents. 8. Provide all submittals within 14 calendar days of the contract award unless otherwise required by the specification. Submittals shall be sent to the Contracting Officer's Representative (COR) Chris Bielecki via email: contact@example.gov Joshua Kline via email: contact@example.gov SAFETY: In addition to the hazards listed in the original contract, the following inherently hazardous conditions may exist on the job site: working under heavy equipment, working in fast running water. Contractor shall submit a job-specific safety plan that addresses, at a minimum, the hazards listed in the parent contract and the two additional hazards listed above. The safety plan shall be submitted no later than at the post-award meeting. POST AWARD CONFERENCE (AGAR 452.215-73) (NOV 1996): A post award conference with the successful offeror is required. The meeting will be scheduled within _fourteen days_ after the date of contract award and held before work begins. The conference will be held electronically or by other agreed upon means. SUBMISSION OF QUOTES: Submit offer by email to contact@example.gov_ so that it is delivered into this inbox by the due date and time. Be aware that large attachments may increase the time required to deliver an email. It is the offerors responsibility to confirm receipt of the offer from _G. Jeremy Staggs_. 3) Address questions about this solicitation to _G. Jeremy Staggs_ at contact@example.gov_ by 1130 CDT 26JUL2023.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS