Moosomin Dam: New Pressure Relief Wells & Earthworks

Active
2026-27OE-0018International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Water Security Agency is undertaking a critical infrastructure upgrade at the Moosomin Dam, located 12 kilometers south of the Town of Moosomin, Saskatchewan, on Pipestone Creek. Constructed in 1954 by the Prairie Farm Rehabilitation Administration, the dam’s original 17 relief wells, installed in 1955, are now at end of life and composed of aging materials including helcore, transite, no-corrode, and plywood. These wells are being replaced with five new stainless steel pressure relief wells and two additional stainless steel monitoring wells, designed to effectively manage pore water pressures within the dam’s main embankment and foundation, thereby enhancing overall structural stability and controlling the phreatic surface. The project scope includes excavation, installation of a grass swale and half-pipe drainage system, site grading to improve overland water flow, topsoil restoration, and landscaping using certified regional grass seed. The existing 16 relief wells will be decommissioned, with the exception of Well #7, which was previously destroyed and is unlocatable. The Water Security Agency, a Treasury Board Crown corporation governed by The Water Security Agency Act of Saskatchewan, holds responsibility for provincial water management, including dam safety and infrastructure integrity. This procurement, identified as solicitation 2026-27OE-0018, was posted on July 16, 2026, with responses due by August 4, 2026. The work is to be performed at the dam site in Saskatchewan, and all inquiries should be directed to Lee Peters, M.Eng., P.Eng, PMP, whose contact information is provided through the agency’s tender portal. The project reflects a proactive approach to maintaining the long-term safety and functionality of a key provincial water management asset.

General Info

Replace aging dam relief wells with new stainless steel wells and improve drainage for structural stability.

Agency

Saskatchewan Public Sector → Water Security AgencyView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

SK, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencySaskatchewan Public Sector → Water Security Agency
Contacts1 person available
OfficeN/A
Organization / Agency
Saskatchewan Public Sector → Water Security Agency
View Agency Profile
Office AddressN/A
Contacts
Lee Peters M.Eng. P. Eng

Full Description

Show more
Moosomin Dam is located 12 kilometres south of the Town of Moosomin, SK on Pipestone Creek. The dam was constructed in 1954 by the Prairie Farm Rehabilitation Administration (PFRA). A series of 17 relief wells were drilled in the toe of the dam in 1955. The relief well materials of construction vary, and include the use of helcore, transite, no-corrode, and plywood piping. The relief well piping is end of life and requires replacement. WSA intends to install new, modern stainless steel relief wells to reduce pore water pressures through the main embankment dam & foundation of the Moosomin Dam. This will better manage the phreatic surface throughout the dam and embankment, improving the stability of the main embankment dam and foundation. This project includes: Site grubbing Installation of five (5) stainless steel pressure relief wells. Installation of two (2) stainless steel monitoring wells. The construction of the monitoring wells is typical of the pressure relief wells. Well development, testing and well commissioning. Excavation and construction of a grass swale and “half pipe” drainage system for the new relief wells. Decommissioning the existing 16 pressure relief wells. Existing Relief Well #7 (RW7) was previously destroyed and cannot be located. Site grading to provide improved overland water drainage to the project area. Topsoil and landscaping with certified grass seed mix appropriate to the area and environment.
WSA is a Treasury Board Crown corporation within the meaning of The Crown Corporations Act, 1993 (Saskatchewan) that is governed by The Water Security Agency Act (Saskatchewan). WSA is responsible for water management in the Province of Saskatchewan, which includes managing the province’s water supply, protecting water quality, ensuring safe drinking water and the treatment of wastewater, reducing flood and drought damage, protecting aquatic habitat, and managing dams and related supply channels.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2028 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a comprehensive suite of airfield infrastructure upgrades at the Port of Seattle, targeting critical safety, operational, and regulatory needs through multiple interrelated projects. Key components include replacing airfield lighting circuits with degraded megger readings, installing modern LED lighting fixtures and signs to enhance visibility and energy efficiency, and replacing failing pavement and essential utilities to maintain structural integrity and service reliability. Wildlife hazard mitigation efforts involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on airfield signage to deter bird activity, and addressing ponding issues through regrading and new storm drainage infrastructure to reduce attractants and improve site drainage. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unimpeded access for emergency response teams. All work falls under the NAICS code 237990 for other heavy and civil engineering construction, reflecting the scale and complexity of the airfield system enhancements. The contract is forecasted by the Aviation Project Management Group under the Port of Seattle, with Yanet Maldonado serving as the primary point of contact for inquiries. Although the solicitation number is not yet assigned, the posted date indicates preparation for bidding in 2026 with an anticipated performance window aligned to the 2028 timeframe referenced in the title. The scope reflects a strategic, multi-year investment in airfield safety, compliance, and long-term sustainability, integrating environmental, operational, and emergency preparedness objectives into a single coordinated procurement.
Aviation Project Management Group

POSTED

about 11 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
2027 Airfield Project - Contract 1The contract encompasses a major airfield modernization initiative focused on improving safety, efficiency, and compliance at the Port of Seattle’s airfield facilities. Key work includes replacing aging lighting circuits with low megger readings with new LED lighting fixtures and signs to enhance visibility and reduce maintenance, updating failing pavement sections and critical utilities to ensure structural integrity and operational continuity, and addressing wildlife hazards by removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs, and mitigating ponding through regrading and new storm drainage infrastructure. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is formally designated as Contract 1 under the 2027 Airfield Project, managed by the Aviation Project Management Group within the Port of Seattle, with a NAICS code of 237990 indicating it falls under other heavy and civil engineering construction. No set-aside provisions are specified, and the work is scheduled to be performed at the airport’s existing airfield locations. The primary point of contact is Jay Kim, reachable via email or phone, with Mengqi Wu serving as the project manager. The solicitation was posted on July 20, 2026, and further details can be accessed through the Port’s official solicitation portal.
Aviation Project Management Group

POSTED

about 11 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
2027 Airfield Project - Contract 2The contract involves a comprehensive modernization of airfield infrastructure at the Port of Seattle, focusing on upgrading lighting systems, pavement, utilities, and safety features to meet current operational and safety standards. Key work includes replacing aging airfield lighting circuits that exhibit low megger readings with new LED fixtures and signs to improve visibility, energy efficiency, and longevity. Concurrently, failing pavement sections and critical utility lines will be removed and rebuilt to ensure structural integrity and uninterrupted airfield operations. Wildlife hazard mitigation is a major component, involving the removal of turf edge dams along runways, taxiways, and access roads, installation of anti-perching devices on airfield signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure to reduce attractants and improve drainage. Additionally, the project requires the replacement of deteriorating flush fire hydrant access hatches to ensure reliable and rapid firefighter access during emergencies. The contract is forecasted under the NAICS code 237990, indicating specialized construction activities not elsewhere classified, and is managed by the Aviation Project Management Group under the Port of Seattle. Primary point of contact is Moraa Omwega, with David Neds serving as the project manager, and all correspondence and inquiries should be directed through their provided contact information. The solicitation was posted in July 2026, with anticipated activities leading toward execution in 2027.
Aviation Project Management Group

POSTED

about 11 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
RFP AR27-01 - York Spit Reef Deployment 2The contract seeks qualified vendors to load, transport, and deploy reinforced concrete pipe and concrete structural components at the York Spit Reef site in the Chesapeake Bay, Virginia, with the deployment location specified as 417 Octavia Drive, Tabb, VA 23696. All work must be performed in compliance with site-specific technical and logistical requirements outlined in the solicitation, ensuring safe and accurate placement of materials to support habitat restoration efforts. The project is managed by the Virginia Marine Resources Commission under solicitation number RFP-124685, with a response deadline of August 3, 2026, at 7:00 PM Eastern Time, and all proposals must be submitted through the designated vendor portal by that date. The contracting authority is a state-level agency, and the solicitation does not specify a set-aside classification or NAICS code. The point of contact for questions and submissions is Brandy Battle, reachable via email at brandy.battle@mrc.virginia.gov or phone at 757-247-2260. Vendors are expected to demonstrate experience with marine logistics, heavy lifting, and deployment of large concrete structures in open water environments, with a strong emphasis on environmental compliance and safety protocols. All activities must be coordinated with the location and regulatory constraints inherent to the York Spit Reef site within the Chesapeake Bay.
Marine Resources Commission

POSTED

about 11 hours ago

DEADLINE

in 14 days
View Details

More opportunities from Saskatchewan Public Sector → Water Security Agency

Same awarding agency

NAICS: 237990
New
International
Stilling Basin Dewatering and Cleaning – Duncairn Dam and Spruce River Dam SpillwaysThe Water Security Agency is seeking qualified respondents to perform dewatering, cleaning, and isolation of spillway slabs and stilling basins at Duncairn Dam and Spruce River Dam to prepare the structures for comprehensive structural inspections scheduled for 2026. All work must be conducted to deliver inspection-ready conditions, requiring full provision of labor, equipment, materials, temporary works, permits, specialist support, environmental protection measures, and incidental resources in full compliance with applicable laws, regulations, permit conditions, and environmental screening requirements. The scope encompasses the complete execution of these tasks at both dam sites within Saskatchewan, ensuring no risks to surrounding ecosystems or public safety. As a Treasury Board Crown corporation established under The Crown Corporations Act, 1993 and governed by The Water Security Agency Act, the agency is tasked with managing Saskatchewan's water resources, including dam operations, flood and drought mitigation, and water quality protection. This solicitation, numbered 2026-27-0106, was posted on July 16, 2026, with a response deadline of July 30, 2026. Tenders must be submitted to Tuan Pham, P.Eng., at tendersubmissions@wsask.ca, and all work must be performed in accordance with the agency’s mandate to maintain infrastructure integrity and public safety across the province’s water systems.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in 10 days
View Details