Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

MT FLAP SILVER 2021(1) Rossevelt Drive Safety and Realignment Project

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The MT FLAP SILVER 2021(1) Roosevelt Drive Safety and Realignment Project is a forecast initiative managed by the Federal Highway Administration within the Department of Transportation. The primary objective of the contract is to rehabilitate and realign Roosevelt Drive to improve safety and enhance access to the forest areas along the route. This opportunity is designated as a total small business set-aside under NAICS code 237310. The project was posted on September 17, 2025, and is coordinated through points of contact Andres Arredondo and Small Business Specialist Ryan Mavis.

General Info

FHWA small business contract to rehabilitate and realign Roosevelt Drive for improved safety.

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

MT, USA

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment of Transportation → Federal Highway Administration (FHWA)
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Andres Arredondo

Full Description

Show more
Rehabilitated and re-align the Roosevelt drive to better provide access to the Forest along this route.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Water, Street & Drainage Improvements - W Phillipsburg Phase 2
Solicitation # PE-77648-NONST-2027-000000031
The Tift County Board of Commissioners is soliciting competitive cost sealed bids for the Water, Street and Drainage Improvements project for the West Phillipsburg Community Phase 2 in Georgia. The scope of work includes the construction of approximately 3,600 linear feet of twenty-foot-wide urban roadway featuring curb, gutter, base, and asphalt, along with the installation of storm drainage pipes and boxes. Additionally, the project requires the replacement of approximately 1,230 linear feet of 2-inch PVC water main, including the transfer of existing water services and the installation of fire hydrants. The project will be awarded as a single contract, with a timeline of 180 consecutive calendar days to reach substantial completion and 194 consecutive calendar days for final contract close-out. To be eligible, bidders must be pre-qualified Georgia Department of Transportation Contractors, and all watermain construction must be performed by a Licensed Utility Contractor. Mandatory submission requirements include a Bidder's Affidavit of Compliance with O.C.G.A section 13-10-91 regarding E-Verify, a bid bond or certified cashier's check for at least ten percent of the bid amount, and the contractor's license number clearly displayed on the bid envelope. The successful bidder must provide performance and payment bonds for one hundred percent of the contract amount from a Georgia-licensed surety company. Bids are due by 11:00 AM on November 17, 2026, to the Tift County Board of Commissioners in Tifton, Georgia.
Tift County Board of Commissioners

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC), operating the Joliet Job Corps Center for the U.S. Department of Labor, is seeking bids for a fixed-price, single lump sum subcontract for road and parking lot repairs in Illinois. The project scope includes the full-depth removal and replacement of approximately 62,500 square feet of asphalt pavement across five specific areas, the repair of five storm sewer drain structures, and the patching of five potholes. All work must be completed within 90 consecutive business days following a written Notice to Proceed, with all removed materials disposed of at an approved offsite facility. The estimated contract value ranges from $100,000 to $250,000. Bids are due by October 21, 2026, and will be awarded based on overall best value. Mandatory submission requirements include a physical site visit, a signed attendance roster, the MTC Bid for Lump Sum Contract form, a completed MTC Supplier Packet, and a detailed cost breakout on company letterhead. Because the project exceeds $25,000, bidders must provide a bid bond guarantee equal to 20% of the base bid, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. The project is subject to Construction Wage Rate Requirements, necessitating compliance with prevailing wages and the submission of certified payroll reports. Payment is based on percentage of completion using AIA G702 and G703 forms, with a 10% retainage held until substantial completion.
Joliet Job Corps

POSTED

about 4 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237310
New
Federal
Z--BRCA 310427 Southbound Shuttle Stop
Solicitation # 140P2026R0065
Solicitation 140P2026R0065 is a firm-fixed-price construction contract issued by the National Park Service Denver Service Center for the Southbound Shuttle Stop project at Bryce Canyon National Park, Utah. This small business set-aside project, categorized under NAICS 237310, has an estimated value between 1,000,000 and 5,000,000 dollars. The scope of work includes the construction of additional shuttle lanes, new and extended culverts, multi-use trail realignment, a cast-in-place retaining wall, a new shuttle stop shelter, sidewalk and ADA ramp construction, and the replacement of MUTCD signs and pavement striping. Due to the project location, contractors must implement protective measures for the adjacent UT Prairie Dog Habitat and adhere to strict environmental preservation constraints. The anticipated period of performance is 150 calendar days, with a specific window identified from May 1, 2027, to September 28, 2027. Award will be determined using the Best Value Continuum Tradeoff Process, evaluating five non-price factors: technical approach, schedule, project experience, key personnel experience, and past performance. These factors are collectively considered approximately equal in importance to the proposed price. Requirements for the selected contractor include providing bid, performance, and payment bonds, complying with Davis-Bacon Act wage determinations, and following OSHA safety standards. Proposals must be submitted electronically by October 19, 2026, and include a detailed technical narrative, a construction schedule, and a lump sum price for the shuttle stop improvements.
Dsc Contracting Services Division

POSTED

about 8 hours ago

DEADLINE

in 18 days
View Details
NAICS: 237310
New
SLED
City of Los Angeles Sidewalk Repair Program (Project)The City of Los Angeles Sidewalk Repair Program is a citywide initiative covering approximately 467 square miles, designed to improve accessibility for persons with mobility disabilities in compliance with local, state, and federal requirements. This project is implemented pursuant to the Willits Settlement and is governed by ordinance LAMC 62.104.1, which streamlines the review and approval process for sidewalk repairs. The scope of work includes curb ramp repairs, crosswalk paving, utility work, and comprehensive street tree management involving retention, removal, replacement, canopy pruning, and root pruning. The program is scheduled to include applicable utility work for a duration of 30 years. To facilitate efficiency, the new ordinance establishes parameters for ministerial approvals to avoid further environmental reviews for most repairs, while providing a streamlined discretionary process for projects falling outside those parameters or those involving the removal of three or more street trees. The project adheres to Mandatory Project Design Features and a revised Street Tree Retention, Removal and Replacement Policy. Official approval was granted by the City Council and Mayor on August 6, 2026, following the certification of the Recirculated Environmental Impact Report and the 2021 Environmental Impact Report to fulfill California Environmental Quality Act requirements. The primary point of contact for the program is Environmental Supervisor II Lauren Rhodes.
City of Los Angeles

POSTED

about 13 hours ago

DEADLINE

N/A
View Details

More opportunities from Department of Transportation → Federal Highway Administration (FHWA)

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS