Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Mt Vernon Ave Sidewalk Project Work Order#ZD50055C Task Code #Z1530

Forecast
D5-0055State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

West side of Mt Vernon Ave from Spring St to Center St, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Riverside County
Contacts1 person available
OfficeN/A
Organization / AgencyCalifornia → Riverside County
Office AddressN/A
Contacts
Frances SegoviaEnvironmental Project Planner

Full Description

Show more
The County of Riverside Transportation Department is proposing to construct a sidewalk on the west side of Mt Vernon Ave from Spring St to Center St, providing a connection between the existing ADA ramps at each intersection. The proposed work also includes resurfacing a portion of the west side of Mt Vernon Ave. Mt Vernon Ave is a two-lane road with width varying from 47 feet to 62 feet and is classified as a Secondary Highway in the County of Riverside’s General Plan. The proposed work will consist of excavating the existing Asphalt Concrete (AC) pavement and paving back with Hot Mix Asphalt (HMA), as well as applying a layer of Type II Slurry Seal. The proposed project will also include: • Construction of Curb and Gutter • Re-striping of roadway, including pavement markers/reflectors. The proposed project improvements will be within the existing right of way. Temporary construction easements will not be required for the proposed improvements.

More opportunities from California → Riverside County

Same awarding agency

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS