Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Multi-asset, pavement rehab, & off-ramp widening at Artesia Blvd.

Open
12-0S5004State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Transportation is soliciting bids for Contract No. 12-0S5004, a multi-asset project focused on pavement rehabilitation and off-ramp widening at Artesia Blvd in Orange County. The project scope covers Route 5 from the SR 55 interchange in Tustin to the Los Angeles County line in Buena Park, specifically including the northbound Artesia Blvd on-ramp and off-ramp. Key work involves the replacement of electrical light poles, signal poles, and overhead signs, as well as extensive earthwork, surfacing, and drainage improvements. The estimated contract value is 34 million dollars with a performance duration of 350 working days. Bids are due by 2:00 PM on November 10, 2026, and must be submitted via the Bid Express website with security equal to at least 10 percent of the bid. This is a federal-aid project requiring the contractor to self-perform at least 30 percent of the total bid value and adhere to Buy America/Build America standards. Contractors must hold a Class A or specific Class C license and comply with prevailing wage rates as determined by the California Department of Industrial Relations. Technical requirements include strict quality control for concrete pavement, adherence to 2025 Standard Specifications and Plans, and the management of unregulated earth material containing lead.

General Info

Caltrans seeks bids for 34 million dollar Route 5 roadwork due November 10, 2026.

Place of Performance

West Sacramento, CA, 95605, USA

Set-Aside

NONE

Documents

10
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstitb
High
PDF, High priority: read this firstwage-determination
High
PDF, High priority: read this first22 pages · amendment
High
PDF, High priority: read this first3 pages · rfb
High
PDF, High priority: read this first205 pages · rfb
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first2 pages · specifications
High
PDF
ZIP

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseSolicitation
Posted

Solicitation

Notice updated

Response deadline time changed from 8:00 AM UTC to 10:00 PM UTC on Nov 10, 2026. The notice description changed. The point of contact changed.

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Contracting Officer

Full Description

Show more
State of California Multi-asset, pavement rehab, & off-ramp widening at Artesia Blvd. Tender # 12-0S5004 Closing Date : 11/10/2026 at 14:00 PM Contact: Contact: Office Engineer Phone: 916/227-6299 Email: contact@example.gov Details: 12-Ora-5-30.3/44.4 *** ORANGE COUNTY FROM ROUTE 5/55 SEPARATION IN TUSTIN TO THE LOS ANGELES COUNTY LINE IN BUENA PARK Disclaimer: This bid is researched and provided for information purposes only. To participate in this bid opportunity, interested vendors are sometimes required to register on the State of California's website. Please refer to the originating organization for any information relating to this. Direct all queries pertaining to the language, the content or any missing or inaccurate information within this abstract to its originator, as indicated in the advertisement. Note: When you click on the link below, a new window will open to the site where you can locate more information regarding this bid. You may need to search the site to locate the bid. View Bid Information Biddingo.com is not responsible for the contents of the third party site and does not make any representations regarding the content or accuracy of materials on such third party web sites. If you decide to access them, you do so at your own risk.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. This comprehensive infrastructure project requires a wide array of specialized services and materials, including site preparation, land surveying, subsurface investigation, and shoring. The scope further extends to complex pipeline and utility work such as tunneling, boring, jacking, micro tunneling, and the installation of cathodic protection and steel casing. Additional requirements include surface work like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, as well as the supply of ready mix, precast concrete, and manhole materials. The solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must hold a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Kiewit also emphasizes the importance of labor harmony and notes its existing collective bargaining agreements with several trade unions. Interested parties must submit their quotes by November 18, 2025, via the Building Connected system.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 10 days
View Details
NAICS: 237310
New
SLED
Katella Ave & State College Blvd Rehabilitation Project
Solicitation # RCP2025-23565
The Katella Ave and State College Blvd Rehabilitation Project (RCP2025-23565) is a public works initiative by the City of Anaheim with an estimated construction cost of $4,213,400. The scope of work involves the removal and reconstruction of asphalt concrete pavement using rubberized asphalt concrete within the existing right of way on Katella Ave from Auburn Way to Douglass Rd and State College Blvd from Katella Ave to Gene Autry Way. Additional infrastructure improvements include the reconstruction of ADA access ramps, sidewalks, curb and gutter, and the adjustment of utility pull-boxes and traffic detection devices, as well as the installation of signage and pavement markings. The project must be completed within 70 working days from the Notice to Proceed. Contractors must hold a General Engineering (A) license and be registered with the Department of Industrial Relations. A key requirement is compliance with the Community Workforce Agreement, requiring the awarded contractor and all subcontractors to sign a Letter of Assent. Bids are evaluated based on the lowest responsive Total Base Bid Proposal submitted via OpenGov, with a required 10% bid bond. Performance is subject to strict work hour constraints, specifically between 10:00 p.m. and 5:00 a.m. for work affecting Caltrans right-of-way. The contract also mandates adherence to MUTCD standards for traffic control and ANSI/TIA/EIA standards for fiber optic installations.
Public Works

POSTED

about 20 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237310
New
SLED
Weatherford Parking Lot Replacement
Solicitation # 405-26R0027374
The Texas Department of Public Safety is soliciting bids for the Weatherford Parking Lot Replacement at the Weatherford Highway Patrol and Driver License Office. This turnkey project involves milling all existing asphalt surfaces to a minimum depth of 2.5 inches, repairing soft areas and potholes with base compaction to 98 percent, and installing new asphalt to a minimum finished depth of 2.5 inches. The scope also includes the removal, painting, and resetting of wheel stops, as well as full restriping of the lot, including fire lanes and handicap markings. All work must be performed by qualified craft persons with at least three years of experience and must comply with state and local codes. Electronic responses are due by November 13, 2026, at 5:00 P.M. CT via email or the DPS Online Bid Room. Bids will be evaluated based on responsiveness and past performance, with the award going to the responsible bidder representing the best value. Required submission volumes include contract forms, an information bid section with key personnel resumes, a subcontracting plan for contracts over 100,000 dollars, and a mandatory pricing schedule. Performance and payment bonds are required for contracts exceeding 100,000 dollars and 25,000 dollars, respectively. The contractor must provide a work phasing plan to ensure safe building access, including off-hours work, and adhere to prevailing wage rates per Texas Government Code Chapter 2258.
Department of Public Safety

POSTED

about 23 hours ago

DEADLINE

in 6 days
View Details

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 561730
New
SLED
IFB Tree Trimming, Pruning, & Removal Services, Los Angeles & Ventura Counties
Solicitation # 07A6504
The California Department of Transportation (Caltrans) is soliciting bids for tree trimming, pruning, and removal services within Los Angeles and Ventura Counties. The contractor is responsible for providing all necessary labor, equipment, and materials to perform thinning, skirting, and the removal of shrubs, vines, and trees, including palm trees. Key technical requirements include maintaining a 17-foot vertical clearance over traveled ways and shoulders and ensuring visibility for highway signs and safety devices. While above-ground removal is required, stump grinding or removal is explicitly prohibited. The contract is estimated to run from January 1, 2027, through December 31, 2029, with work assigned via routine requests (5-day response) and non-routine requests (24-hour response). Award will be granted to the lowest responsive and responsible bidder, with specific incentives available for DGS-certified Disabled Veteran Business Enterprises (DVBE), Small Businesses, and Microbusinesses. Compliance with State General Prevailing Wage Rates, SB 1383 organic waste regulations, and OSHA standards for line-clearance trimming is mandatory. Bids must be submitted in physical format by November 24, 2026, and must include all required certifications. Payment is contingent upon the submission of a Payee Data Record and certified payroll records, with all invoices submitted in triplicate to the Camarillo office.
Landscaping Services

POSTED

about 23 hours ago

DEADLINE

in 17 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS