This Solicitation opportunity from California was posted on September 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Multi-Asset Pavement Rehabilitation And Off-Ramp Widening Project In Orange County From Route 5/55 Separation In Tustin To The Los Angeles County Line In Buena Park
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Solicitation 12-0S5004 is a project issued by the State of California Department of Transportation for multi-asset pavement rehabilitation and off-ramp widening in Orange County. The scope of work extends along Route 5 from the Route 5/55 separation in Tustin to the Los Angeles County line in Buena Park. Key construction activities include the installation of new pavement, individual slab replacement, the implementation of temporary barrier systems, and the application of various thermoplastic and paint traffic stripes. The project also involves modifying sign structures, installing reinforced concrete pipes, and managing water quality risers and gross solids removal devices. Bids must be submitted on a unit price basis via the Bid Express website by November 10, 2026, and must include bidder security of at least 10 percent of the bid. The contractor is required to provide an on-site safety representative and a quality control manager to oversee the project, including the production and testing of rapid setting concrete and SCADA system deployment. Performance is subject to strict timelines, with job site activities starting within 55 days of contract approval and specific blackout dates for highway closures between June and September 2028 to accommodate the Games Route Network. Compliance requirements include adherence to Buy America/Build America standards for manufactured products, prevailing wage rates as determined by the California Department of Industrial Relations or the U.S. Secretary of Labor, and ADA compliance for specified locations. The contractor must also provide DVBE quotes and submit certified payroll records through LCPtracker Pro. Technical specifications mandate the use of certified laboratories for local material analysis and strict marking requirements for precast barrier segments.
General Info
Place of Performance
Tustin, CA, USASet-Aside
Documents
2AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 15 days
- North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1Open now, due in 2 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
More opportunities from California → STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
