Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on September 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Multiple Trail Bridges Replacement Project Phase 2

Closed
12445226Q0033Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified SBE, VSBE, and DBE firms for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The scope of work is extensive, covering heavy civil and infrastructure activities including site preparation, asbestos abatement, tunneling, underground piping, asphalt and concrete paving, electrical systems, and telecommunications. Interested firms must provide evidence of certification through the Department of General Services and the Port of Long Beach PlanetBids portal. Bidders are required to hold a valid California Contractor's license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. The project is subject to a Project Labor Agreement, prevailing wage rates, and the California Labor Code. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades, including carpenters, laborers, cement masons, ironworkers, operating engineers, and teamsters. Funding is provided through multiple grants, including the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD 2021 Port Infrastructure Development Program, necessitating compliance with DBE Program requirements. Interested parties must contact Lead Estimator Cassandra Shore to receive an Invitation to Bid via the BuildingConnected system, with a response deadline of September 15, 2026.
Kiewit Infrastructure West Co.

POSTED

about 5 hours ago

DEADLINE

in 3 days
NAICS: 237310
New
SLED
NH-093-1(035) Farrington Highway Widening
Solicitation # B27000387
The Farrington Highway Widening project, solicitation B27000387, is an invitation for bids issued by the Hawaii Department of Transportation to develop an auxiliary lane between Nanakuli Avenue and Mohihi Street in the District of Ewa, Oahu. The scope of work includes excavation, cold-planing, paving, striping, signage, drainage structure modifications, and the installation of retaining walls. The estimated construction cost is between 35 million and 37 million dollars, with a performance period of 780 calendar days from the start work date. Bidders must hold a valid State of Hawaii General Engineering A license and submit their proposals via HiePRO by October 28, 2026. The contract will be awarded to the lowest responsible and responsive bidder based on the summation of unit bid prices and approximate quantities. Key requirements include the submission of a surety bid bond for proposals exceeding 25,000 dollars, as well as performance and labor and material payment bonds. The project adheres to federal and state regulations, including the Davis-Bacon Act, the Build America, Buy America Act, and Hawaii Revised Statutes Chapter 103D. Contractors are required to comply with strict prompt payment terms, paying subcontractors within 10 calendar days of receiving progress payments from the agency. Final acceptance is determined by the Engineer based on full compliance with contract documents, including specific quality standards for pavement smoothness and compaction.
Department of Transportation

POSTED

about 11 hours ago

DEADLINE

in about 2 months
NAICS: 237310
New
SLED
ACADEMY OF RICHMOND COUNTY PARKING LOT PAVEMENT REPAIR and STRIPING
Solicitation # 26-214
The Richmond County Board of Education has issued RFP 26-214 for turnkey pavement repair and striping services at the Academy of Richmond County, located at 910 Russel St., Augusta, Georgia. The scope of work includes patching designated areas to match existing pavement, installing curb and gutter to enclose grease trap access manholes, and performing line striping. Specific technical requirements include the use of 3,000 FSI concrete with a fine broom finish, 98% compacted subgrade, and MPI #32 alkyd traffic-marking paint. All new striping and hatching must be yellow, while stop bars and existing crosswalks must be recoated in white, adhering to Georgia DOT Construction Standards. Asphalt top courses must cure for at least 14 days before painting. The contract will be awarded to the lowest responsible and responsive bidder, with an anticipated award date of October 20, 2026. Sealed bids are due by 3:00 PM on October 7, 2026, and must include turnkey pricing, a project lead time, company references, and a signed Sex Offender Acknowledgement Form. Contractors must maintain commercial general liability insurance of 2 million dollars and worker's compensation insurance of 1 million dollars. Compliance with Georgia state laws is mandatory, including E-Verify affidavits, periodic criminal history record inquiries under O.C.G.A. 35-3-34, and adherence to a smoke-free environment on school property. All work coordination and deliveries must be cleared through David Perry.
Richmond County Board of Education

POSTED

about 16 hours ago

DEADLINE

in 25 days

AI Contract Overview

Show more

Solicitation 12445226Q0033 is a total small business set-aside request for quotation issued by the USDA Forest Service for the Multiple Trail Bridges Replacement Project Phase 2 in the Chattooga River Ranger District of the Chattahoochee-Oconee National Forest. The project scope involves constructing seven new trail bridges, four using reinforced concrete abutments and three using gabion abutments, as well as reconstructing one trail embankment fill slope failure repair and building one boardwalk platform with a ramp. The estimated contract value is between 1,000,000 and 5,000,000 dollars. The work is governed by the Forest Service Supplemental Specifications and requires compliance with the Davis-Bacon Act for prevailing wages and various Buy American requirements. Award will be based on best value, granted to the highest technically rated offeror provided the price is fair and reasonable and past performance is acceptable or neutral. Technical evaluation focuses on relevant experience in remote forest construction, reinforced concrete work, and erosion control. Offerors must submit five separate volumes, including a technical approach with three relevant projects and a revised schedule of items, by September 8, 2026, at 12:00 PM ET. The project includes strict quality standards with a zero-tolerance policy for major defects, and final acceptance is provided in writing by the Contracting Officer or Representative.

General Info

Seven trail bridges, one embankment repair, and boardwalk construction in Georgia; $5M–$10M small business set-aside.

Agency

Department Of Agriculture → Csa East 12 Usda-FsView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Lakemont, GA, USA

Set-Aside

SBA

Documents

(17)

C04 Attachment 2 Statement of Work - CRRD Trail Bridges Phase 2

PDFsow

Solicitation 12445226Q0033 Multiple Trail Bridges Replacement Project Phase 2

PDFifb

Solicitation 12445226Q0033 Multiple Trail Bridges Replacement Project Phase 2

PDFrfq

C04 Attachment 3 - Lake Russell M.P. 2.18 Stakeout Coordinates

XLSXother

FSSS Specifications for Multiple Trail Bridges Replacement Project

PDFspecifications

Solicitation 12445226Q0033 Multiple Trail Bridges Replacement Project Phase 2 Revision 1

PDFrfq

Past Performance Questionnaire Attachment 8

PDFpast-performance

Solicitation 12****** - Revised Statement of Work for CRRD Trail Bridges Phase 2

PDFsow

Site Visit Information for Trail Bridges Project

PDFsite-visit-information

Lake Russell M.P. 2.18 Trail Bridge Replacement Project Drawings

PDFspecifications

2020 Tropical Storm Zeta Multiple Trail Bridges Replacement Project Drawings

PDFdrawings

C05 Attachment 1 - Revised Schedule of Items Phase 2

XLSXschedule-of-items

2020 Tropical Storm Zeta Multiple Trail Bridges Replacement Project - Revised Drawings

PDFspecifications

Davis Bacon Wage Determination for Madison County, GA

PDFwage-determination

C05 Addendum 1 2021 NEPA Report for TS Trail Bridges Project

PDFdecision-memo

Schedule of Items for 2020 Tropical Storm Zeta's Trail Bridges Replacement Project Phase 2

XLSXschedule-of-items

Amendment 1 to Solicitation B1-244522600033 for Multiple Trail Bridges

PDFamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

4 updates
PhaseClosed
Posted

Combined Synopsis

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Amendment 3

Contract was updated

Amendment 4

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa East 12 Usda-Fs
Contacts1 person available
OfficeAtlanta, GA, 303092449, USA
Organization / Agency
Department Of Agriculture → Csa East 12 Usda-Fs
View Agency Profile
Office AddressAtlanta, GA, 303092449, USA
Contacts
SIMS JALISA C

Full Description

Show more

September 2, 2026


  1. Can previously submitted PPQs be submitted in lieu of obtaining new PPQs?
    • No, previously submitted PPQs cannot be submitted in lieu of obtaining new PPQs
  2. On page 3 of the SF1442, the project delivery date is listed as 05/01/2026. This date has already passed. Will 10/12/2026 - 10/11/2027 be acceptable as a period of performance?
    • This is a system generated date. Please, disregard. The awardee will have an updated SF 1442 to sign.

The Government will no longer answer anymore questions. Thank you for your cooperation.


____________________________________________________________


August 14, 2026


Amendment 1 is now posted in the Attachments section of this posting. The purpose of this amendment is to:


  1. Post the answers to the questions that were submitted by the due date stated in the solicitation;
  2. Remove Lake Russell Trail Bridge M.P. 2.18 from the solicitation requirements. All associated documents have been revised to reflect this change and are located in the Attachment section of the sam.gov posting. All attachment numbers will remain the same and will be updated once the requirement has been awarded;
  3. Revise the Disclosure of Magnitude of Construction Projects to: ☒ Between $1,000,000 and $5,000,000;
  4. Upload NEPA Report as an addendum in the Attachments section of the sam.gov posting; and
  5. Extend the quote submittal due date from September 1, 2026 to September 8, 2026 at 12:00 PM ET.

--------------------------------------------------------------------------------------------------------


July 22, 2026


Offerors are highly encouraged to attend the site visit on July 28, 2026 at 7:00 AM. See Attachment
7- Site Visit Information- Trail Bridges Project for further details. Please submit your RSVP via email to Jalisa.sims@usda.gov.


--------------------------------------------------------------------------------------------------------


July 7, 2026


This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12.  This announcement constitutes the only solicitation.  Quotations are being requested and a separate written solicitation will not be issued. 


Solicitation number 12445226Q0033 is issued as a Request for Quotation (RFQ) for constructing (7)- new trail bridges, reconstruction of (1)- trail embankment fill slope failure repair, and new construction of (1) - Boardwalk platform with ramp that shall tie into the new Lake Russell M.P. 2.18 trail bridge in the Chattooga River Ranger District of the Chattahoochee-Oconee National Forest.


This acquisition  is set-aside for small business concerns.  The applicable North American Industry Classification Standard Code is 237310 – Highway, Street, and Bridge Construction  The small business size standard is $45,000,000.00.  This acquisition is a Total Small Business Set-Aside.  All responsible sources may submit a quotation which will be considered by the agency. 


Disclosure of Magnitude of Construction Projects:


☐ Less than $25,000.


☐ Between $25,000 and $100,000.


☐ Between $100,000 and $250,000.


☐ Between $250,000 and $500,000.


☐ Between $500,000 and $1,000,000.


☐ Between $1,000,000 and $5,000,000.


☒ Between $5,000,000 and $10,000,000.


☐ More than $10,000,000.

More opportunities from Department Of Agriculture → Csa East 12 Usda-Fs

Same awarding agency

NAICS: 237310
Federal
Pisgah South Culvert Rehab
Solicitation # 12445226Q0046
Solicitation 12445226Q0046 is a Request for Quotation for the FY26 Pisgah South Ranger District Ditch Culvert Replacements and Road Reconditioning project in the Pisgah National Forest, North Carolina. This project is part of the Hurricane Helene Recovery efforts and involves the removal of 214 ditch relief culverts across more than 42 miles of roadway and the installation of 7,414 linear feet of 24-inch Corrugated Metal Pipe culverts. The scope also includes road rehabilitation, ditch reshaping, and the installation of rip-rap, sediment traps, and headwalls to meet current Forest Service Standards. The project magnitude is estimated between $1,000,000 and $5,000,000, and it is a total small business set-aside under NAICS code 237310. The period of performance is from October 1, 2026, to September 30, 2028, with a total duration of 730 calendar days. Award will be made to the highest technically rated offeror, provided that the price is fair and reasonable and past performance is acceptable or neutral. Quotations must be submitted via email to the designated USDA contacts by the extended deadline of September 14, 2026, at 5:00 PM ET. Proposals must be organized into five volumes, including signed amendments, bid guarantees, a technical approach limited to 15 pages, past performance questionnaires, and the completed Schedule of Items. The contractor is required to provide a competent superintendent on-site and adhere to strict environmental and fire protection policies, as well as Davis-Bacon prevailing wage rates.
Highway, Street, and Bridge Construction

POSTED

11 days ago

DEADLINE

in 2 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS